AIA Update on Integrated Project Delivery     Lean Construction Institute Design Forum January 8 2009     Markku Allison Preloader

AIA Update on Integrated Project Delivery Lean Construction Institute Design Forum January 8 2009 Markku Allison - PowerPoint PPT Presentation


  • 198 Views
  • Uploaded on

position statement | 2007. Position No. 26: Project DeliveryThe AIA believes that every project delivery process must address the quality, cost-effectiveness, and sustainability of our built environment. This can best be effected through industry-wide adoption of an integrated approach to project delivery methodologies characterized by early involvement of owners, designers, constructors, fabricators and end user/operators in an environment of effective collaboration and open information shari9440

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'AIA Update on Integrated Project Delivery Lean Construction Institute Design Forum January 8 2009 Markku Allison' - MikeCarlo


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript