An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Preliminary Design Review Micromouse EE 296 Spring 2008

  2. Aether Burst

  3. Our Team • Blaise Arita Team Leader • Maran Osakoda Organizer • Shaunty Kleinschmidt Programmer • Matthew Menor Designer

  4. Overview • This semester we will be designing, fabricating, and programming a small robotic mouse to make its way to the center of a difficult 16X16 maze.

  5. Block Diagram

  6. Accomplishments So Far • Top looking sensors • Made a prototype uMouse • General Structure of our uMouse • Bought most of the materials • Started writing some of the Algorithms

  7. A Look into the Hardware • This is what we first started off with: • Material: 1/32 Aluminum • Problems: Very thin, Not rigid Wasted Space No support for other • hardware components

  8. Our Ideal uMouse

  9. Our uMouse Now • Material: 1/16 Angled Aluminum 8 Shortened M3 Screw • Lighter • Motors very close together • Use 8 AA batteries • Use Velcro to secure battery holders • Use “mini furniture sliders” to keep the uMouse balanced • Use top 2 Aluminum plates to mount circuit boards

  10. Some Potential Problems • No Wheels • Can’t test height off the ground • Can’t test position and distance of sensor boards • Difficult to keep wires organized • Fitting the circuit boards on the chassis with the wheels • Finding the quickest and simplest way to find the center • Once to the center, how to go back to the start efficiently • Motors getting too hot • Supplying enough power for the 10 minutes • Time Management

  11. Tasks Remaining • Number of sensors to be used • Need to test sensors for approximate wall distance • Build circuit boards • Finish construction of uMouse • Program and test on uMouse

  12. Gantt Chart

  13. Thank You! Any Questions?