SEMS Final Rule. GOM Contractor Expectations Julia Swindle - IADC. OOC SEMS Subcommittee. Our focus is on the operator/contractor relationship and meeting the associated SEMS requirements. Our subcommittees are: Contractor Guidance – Troy Nugent – Baker Hughes

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'SEMS Final Rule' - Mia_John


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
sems final rule

SEMS Final Rule

GOM Contractor Expectations

Julia Swindle - IADC

ooc sems subcommittee
OOC SEMS Subcommittee
  • Our focus is on the operator/contractor relationship and meeting the associated SEMS requirements. Our subcommittees are:
    • Contractor Guidance – Troy Nugent – Baker Hughes
    • Competence/Knowledge and Skills – Brenda Kelly -IADC
    • Training and Certifications – Milton Bell – Exxon ,

and Achebe Hope - Chevron

    • Documents and Data – Bill Walker - Cobalt
documents
Documents
  • SEMS Final Rule
    • Published Oct. 15, 2010
    • Effective Nov 15, 2010
    • Fully Implemented by Nov. 15, 2011
  • API RP 75 – Third Addition
  • 30 CFR Part 250 Sub “S” SEMS
what is api rp 75
What is API RP 75
  • Implemented in 1994 as a voluntary program
  • Developed by the API at the request of the MMS and response to OSHA 1910.119
  • Developed in conjunction with the OOC, IADC, NOIA and the MMS
sems vs api rp 75
SEMS vs API RP 75

Per §250.1900( c ) "If there are conflicts between the requirements of this subpart and API RP 75 (incorporated by reference as specified in §250.198), you must follow the requirements of this subpart."

api rp 75 program elements
API RP 75 Program Elements
  • “[The regulation] does not require contractors to develop a [SEMS]. However, contractors should be familiar with the operator’s [SEMS] and should have safety and environmental policies and practices that are consistent with the Operator’s [SEMS].”
api rp 75 program elements7
API RP 75 Program Elements
  • Safety & Environmental Information
  • Hazard Analysis
  • Management of Change
  • Operating Procedures
  • Safe Work Practices
  • Training
  • Assurance of Quality and Mechanical Integrity of Critical Equipment
  • Pre-Start Up Review
  • Emergency Response
  • Investigation of Incidents
  • Audits
  • Recordkeeping
contractor selection
Contractor Selection
  • “When selecting a contractor [the operator] must obtain and evaluate information regarding the contractor’s safety and environmental performance.”
  • Contractor personnel must know and understand the operator’s SEMS
  • The operator and contractor must document their agreement on …[HSE]
  • The operator must document that contractors have the “skills and knowledge” to perform their assigned duties.
sems competency subcommittee
SEMS Competency Subcommittee

Brenda Kelly, Chair

  • Reviewed regulation for training and competency requirements
  • Determined personnel “competency” not stated as requirement
sems competency subcommittee10
SEMS Competency Subcommittee

REQUIRES:

  • Training
  • Verification of knowledge and skills
  • Documentation of training, instructor qualifications, assessor qualifications, and individual assessments
owner column legend
“Owner” Column Legend
  • Operator – implied for all program elements.
  • C = Contractor
    • Per §250.1914(a), a Contractor is defined as “anyone performing work for the Lessee.”
    • Contractors may be expected to supply evidence of compliance.
      • Written policy/procedure, design information, records, etc.
  • FO = Facility/Rig Owner
    • Owners of facility/rig may carry larger burden for evidence for some requirements.
competence subcommittee next steps
Competence Subcommittee − Next Steps

Prepare cover page & instructions for documents

Review Tools by SEMS Committee members

Prepare reference materials for Skills Assessment and Assessor Qualifications

Revise IADC KSAs

Expand KSAs to all rig positions

competence subcommittee tools availability
Competence Subcommittee − Tools Availability

Anticipate available by end of July

Obtain copy from operator or IADC website