The 6 Phases of the Architectural Design and Drawings Process

Know the 6 phases of the architectural design and drawings process. The stages of design as described by The American Institute Of Architects will be discussed in this article.

Harish13
Download Presentation

The 6 Phases of the Architectural Design and Drawings Process

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The 6 Phases of The Architectural Design and Drawings Process Bio Link https://sites.google.com/view/naksha-construction/blog/6-phases-of-design-and-drawings-process

  2. Constructing a building is a lengthy process. Breaking down an architectural project through tiny steps helps simplify the construction process.The stages of design as described by The American Institute Of Architects will be discussed in this article. We'll go over everything from how we need a conceptual design to the architectural design stages in detail:

  3. Programming During this stage, also known as the Program of Requirements, your engineer would ask you numerous questions about the house elevation design. Carefully listen to the answers, conduct interviews and seminars and observe your business operations.

  4. PlanimetricAnalysis The level of detail in a schematic design is low because of the conceptual character of the home design and drawing. If your project involves external construction, your designer will start by laying out the location and the interior areas and developing basic exterior designs. As half of this step, your design specialist will typically provide you with a rough estimate of the project's final price.

  5. Creation of Designs Thanks to your skilled designer, a substantial amount of progress will be made in the building design and drawing in jaipur at this stage. You should focus on articulating and fleshing out the project's core components during this stage. There is greater attention to detail in the architecture and design of the exterior and inside, as well as the room proportions and materials used. The engineers will improve the HVAC, drainage, & electrical systems.

  6. Plans and Specifications for the Building Project The final match of structural design and drawing should include the technical details necessary to secure a construction permit from the appropriate municipality (e.g., the city, county, etc.). In most cases, your builder will manage the permission procedure on your behalf, including responding to any inquiries or demands for further information from the approving body and making any necessary adjustments to the designs. The Construction Documents are a comprehensive set of specifications & drawings submitted for permits and sent to contractors to solicit bids and price estimates for the project. There is also typically a new cost estimate made.

  7. Bidding If you work for a government agency, you must follow specific regulations when hiring contractors, but private companies have more leeway. If you're looking for a competitive quotation, you can pick a good builder based on qualifications. Afterward, negotiate exclusively with With material construction in Jaipur. Or you can choose many contractors to acquire bids from. A professional architect can assist you in weighing your alternatives. During the bidding and procurement process, your architect will assist in answering queries from contractors, issuing formal clarification to the plans and specifications if needed, and assisting in evaluating bids to ensure that all necessary items are included.

  8. Construction Project Management Your civil work contractor may visit the site as often as once per day, once per week, or as infrequently as once per month, based on the extent of the work and your preferences. However, having a watchful eye ensures that you have the desired living quarters in the end.

  9. Let us sum up - Choose the best builder like Naksha Construction. Your builder will track the job's progress by taking pictures and writing reports from the site and will also make sure that they are paid fairly for the work they've accomplished. Source Link https://sites.google.com/view/naksha-construction/blog/6-phases-of-design-and-drawings-process