synergy meeting scheduler system l.
Download
Skip this Video
Loading SlideShow in 5 Seconds..
Synergy Meeting Scheduler System PowerPoint Presentation
Download Presentation
Synergy Meeting Scheduler System

Loading in 2 Seconds...

play fullscreen
1 / 25

Synergy Meeting Scheduler System - PowerPoint PPT Presentation


  • 547 Views
  • Uploaded on

Synergy Meeting Scheduler System Abhinav Reddy Tummalapally Lavanya Devara Swetha Vangala Satyanarayana Karthik Upadrasta Subject World – Abhinav Reddy System World – Karthik & Swetha User World – Lavanya Developer World – Team Work Stakeholders End users

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Synergy Meeting Scheduler System' - Gideon


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
synergy meeting scheduler system

Synergy Meeting Scheduler System

Abhinav Reddy Tummalapally

Lavanya Devara

Swetha Vangala

Satyanarayana Karthik Upadrasta

slide2
Subject World – Abhinav Reddy
  • System World – Karthik & Swetha
  • User World – Lavanya
  • Developer World – Team Work
stakeholders
Stakeholders
  • End users
  • Participants in meetings
  • Meeting schedulers/initiators
  • Project management teams
  • Requirement engineers
  • Test Engineers
  • Developers Network support group
  • Potential customers who will use the system
enterprise requirements
Enterprise Requirements
  • Issue: A meeting date shall be defined perhaps by a pair (calender date, time period)
  • REQ: A meeting date shall be defined by a pair (calender date, time period)
  • Issue: The initiator could also ask, in a friendly manner, active participants to provide any special equipment requirements on the meeting location.
  • REQ: The initiator shall determine

a) special equipment by herself

b) special equipment by asking the active participants

  • Issue: The initiator may ask the important participants to state preferences about the meeting location.
  • REQ: The initiator shall determine Location

a) By herself

b) By asking important participants to state preferences about the meeting location

enterprise requirements contd
Enterprise Requirements Contd..
  • Issue: The proposed meeting date should belong to the stated date range and to none of the exclusion sets; furthermore it should ideally belong to as many preference sets as possible.
  • REQ: The proposed meeting date shall belong to

a) As many preference sets as possible

b) No preference sets (Corresponds to a weak conflict)

  • Issue: Each conflict resolution should be done as quickly as possible and with no more interactions than is really needed.
  • REQ: Each conflict resolution should be done as quickly as possible and with least number of interactions.
  • Issue: It is absolutely necessary, however, to allow each meeting to take place in a virtual place.
  • REQ: It is necessary, however, to allow each meeting to take place in a virtual place.
non functional requirements resolved
Non- Functional Requirements - Resolved

We have connected the given non-functional requirements to the corresponding functional requirements.

  • Accuracy

Any change in meetings shall be informed to all the participants without any delay.

  • Physical Constraints

A person shall not be at two different places at the same time.

A meeting room shall not be accommodated to more than one

meeting at a time.

  • Dynamic

Change in a location or meeting date shall be immediately informed to all the participants.

non functional requirements resolved contd
Non-Functional Requirements - Resolved - Contd..
  • Flexible

It shall be easier to re-plan meetings and manage interactions

  • Performance

The elapsed time between the submission of a meeting request and

the computation time to schedule a date and to find a location for the

meeting should be minimal.

  • Usability

The system shall be usable by non-experts, in which case the user

can learn to operate with less effort.

non functional requirements resolved contd18
Non-Functional Requirements - Resolved - Contd..
  • Extensibility

The system shall be able to handle new changes including

upgradations or changes to the existing system. It shall be easily

modified to accommodate the enhancements

  • Customizable

The system shall be customizable to two modes (1) Private (2) Professional meetings –Characterized by different restrictions on the time period that may be allocated (e.g. meeting during office hours, private activities during leisure time).