Proposed Locations of New FacilitiesTFS Development Plan MAA 11/29/01. BLM Lease Boundary 26.84 Acres. Current FacilitiesSeptember 2001. . . . Tent Area. Managers Trailer. LABWET. LAB2. LAB1. Loading Dock. LABDRY. MEET. LAB4. SAUNA. LABSI. GEN. Loading Ramp. Heliport. Winter Quarters. Winter Residence.
E N D
1. Development PlansToolik Field Station
5. TFS Development PlanGoals and Objectives Provide housing and support facilities for a base population of 125 residents during the summer field season.
Provide overload and educational conferences housing.
Connect to the fiber optic cable that runs from Prudhoe Bay to Valdez.
Provide laboratory facilities to support a base user group of 125 researchers during the summer field season.
Provide an intracamp LAN and Phone system.
6. TFS Development PlanGoals and Objectives v Provide shower facilities.
v Provide clothes washing facilities.
v Provide a gray and blackwater holding/treatment facility.
v Provide dinning facilities for a base population of 125 residents.
v Provide residence and support facilities to accommodate 25 year round users.
v Provide a science support workshop.
v Provide and incubation and environmental chamber facility
7. TFS Development PlanGoals and Objectives v Provide a winter science support building. (labs, office, winter base of operation, comms, storage, ship/rec.)
v Connect to the Alyeska Natural gas line, covert facilities to natural gas.
v Support expanded use of facilities during short-term summer field courses and field trips.
v Support Arctic Environmental Observatory/NEON
v Act as Regional Arctic Logistics provider.
v Provide secure summer and winter storage space.
v Support summer& winter field courses with classrooms and lecture halls.
8. PHASE 1 Two additional residence modules.a) 24’ x 70’ approximate sizeb) 8 beds rooms per unit, 16 bedsc) bathrooms, shower, laundryd) mud room, recreation room (complete 2002)
Expand current kitchen facility (complete 2002)
Incubation Laboratory Module. (complete 2002)
10. PHASE 2 Science Support Buildinga) 74’ x 84’ approximate dimensionsb) offices, labs, computer lab, first aid
c) facility is heated year roundd) shipping/receiving bay 50’ x 60’e) storagef) winter logistics support base
12. Concept Drawing Science Support Building
13. Concept Drawing Science Support Building
14. PHASE 3 Replace kitchen complexa) kitchenb) dining area to seat 100c) food storage & pantryd) walk-in freezers and coolerse) bathrooms
15. Preliminary Kitchen Design
17. PHASE 4 Two new residence units
One new laboratory 24’ x 60’ approximate
19. PHASE 5 Replace current workshop
Add a new laboratory 24’ x 60’
Add residence unit
21. PHASE 6 Add lecture hall
Add residence
23. PHASE 7 Add new laboratory
Add new residence
Build additional road on current pad.
25. PHASE 8 Add new laboratory
Add new residence unit
27. PHASE 9 Add new residence unit
29. PHASE 10 Add new facility support module