CIPULARANG II TOLL ROAD PROJECT. C. Willy Hartono Sales Manager West Java Admixture System. Section I : Purwakarta Section II : South Purwakarta – Plered Section III. 1 : Plered – Cikalong Wetan Section III. 2 : Darangdan – Cikalong Wetan Section III. 3 : Cisomang Bridge

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'CIPULARANG II TOLL ROAD PROJECT' - Antony


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
cipularang ii toll road project

CIPULARANG IITOLL ROAD PROJECT

C. Willy Hartono

Sales Manager

West Java

Admixture System

slide2
Section I : Purwakarta
  • Section II : South Purwakarta – Plered
  • Section III. 1 : Plered – Cikalong Wetan
  • Section III. 2 : Darangdan – Cikalong Wetan
  • Section III. 3 : Cisomang Bridge
  • Section IV. 1 : Cikalong Wetan – Cikubang
  • Section IV. 2 : Cikubang Bridge
  • Section IV. 3 : Cikalong Wetan – Cikamuning
  • Section IV. 4 : Cipada – Cikamuning
  • Summarize
1 general overview
1. General Overview
  • Total Length is 40 km
  • Divided by 9 Sections
  • Starting in March 2004 & done before April 25, 2005 (The 50th Anniversary of Asia – Africa Conference in Bandung, West Java)
  • Starting with earthworks in March 2004 & continuing with concrete works in July 2004
  • Girder produce insitu & by precaster (Adhi Precast, Wika Beton, & Saeti)
2 section i purwakarta
2. Section I : Purwakarta
  • Main Contractor is Mawatindo
  • Supervision Consultant is Virama Karya
  • Total Length is 9 km
  • Concrete supplied by Farika Duta Agung (2 BP).
  • Concrete Volume 100,000 m3
  • We supplied 100 % (Pozzolith 101 Ri & Rheobuild 1100) to Farika Duta Agung
  • Wet Mix for Rigid Pavement
3 section ii south purwakarta plered
3. Section II : South Purwakarta - Plered
  • Main Contractor is Adhi Karya Division III
  • Supervision Consultants are Cipta Strada, Saka Adhi Prada & Amythas Expert
  • Total Length is 8 km
  • Concrete supplied by Adhimix
  • Concrete Volume 80,000 m3 for Rigid Pavement only
  • We supplied 100 % (Pozzolith 100 Ri & Rheobuild 1100)
  • Wet Mix & low slump for Rigid Pavement & concrete barrier
  • Girder Supplied by Adhi Precast
4 section iii 1 plered cikalong wetan
4. Section III. 1 : Plered – Cikalong Wetan
  • Main Contractor is Waskita – Yasa J.O.
  • Supervision Consultants are Delta Tama Waja, Buana Archicon & Prosys
  • Total Length is 6.3 km include 500 m long bridge
  • Concrete supplied by Yasa Readymix & Multi Structure
  • Total Concrete Volume is 40,000 m3
  • Admixture supplied by Fosroc (SP 337 & RP 264 M) to Yasa Readymix & Grace to Multi Structure
  • Girder produced in situ with total 153 pieces using Yasa Readymix
5 section iii 2 darangdan cikalong wetan
5. Section III. 2 : Darangdan - Cikalong Wetan
  • Main Contractor is Nindya Karya
  • Supervision Consultants are Multi Phi Beta, Tata Guna Patria & Indra Karya
  • Total Length is 4 km
  • Concrete supplied by Dwi Dinamika
  • Concrete Volume 40,000 m3
  • Admixture supplied by Fosroc (SP 337 & RP 264 M)
  • Girder Supplied by Wika Beton (Glenium 317 from BASF & M 21N from KAO)
6 section iii 3 cisomang bridge
6. Section III. 3 : Cisomang Bridge
  • Main Contractor is L & M System
  • Supervision Consultant is Global Profex Synergy
  • Concrete supplied by Pionir Beton
  • Concrete Volume 25,000 m3
  • Admixture supplied by Sika (Plastiment RMC)
  • Girder produced insitu (Sikament NN) & supplied by Saeti Concretindo Wahana (Rheobuild 893)
7 section iv 1 cikalong wetan cikubang
7. Section IV. 1 : Cikalong Wetan - Cikubang
  • Main Contractor is Daya Mulya Turangga
  • Supervision Consultants are Bina Karya, Eskapindo Matra & Hasfarm Dian Consultant
  • Total Length is 5 km
  • Concrete supplied by Focon Indo Beton
  • Total Concrete Volume is 30,000 m3
  • Admixture supplied by BASF (Pozz. 101 Ri & Rheobuild 1100) & Sika (Plastiment R & Sikament NN )
  • Girder supplied by Wika Beton ( Glenium 317 from BASF & M 21 N from KAO)
8 section iv 2 cikubang bridge
8. Section IV. 2 : Cikubang Bridge
  • Main Contractor is Propelat – Wika J.O.
  • Supervision Consultant is Yodya Karya
  • Total Length is 4 km including 400 m long bridge
  • Concrete supplied by Focon Indo Beton
  • Total Concrete Volume is 30,000 m3
  • Admixture supplied by BASF (Pozz. 101 Ri & Rheobuild 1100) & Sika (Plastiment R & Sikament NN)
  • Girder supplied by Wika Beton ( Glenium 317 from BASF & M21N from KAO)
9 section iv 3 cikalong wetan cikamuning
9. Section IV. 3 : Cikalong Wetan - Cikamuning
  • Main Contractor is Hutama Karya
  • Supervision Consultant is Indec & Ass Ltd.
  • Bridge with 750 m long (The longest bridge in Cipularang II project)
  • Concrete supplied by Farika Duta Agung
  • Total Concrete Volume is 50,000 m3
  • We supplied 100 % (Pozzolith 101 Ri & Rheobuild 1100)
  • Girder produced in situ with total 183 pieces
10 section iv 4 cipada cikamuning
10. Section IV. 4 : Cipada - Cikamuning
  • Main Contractor is Sumber Mitra Jaya – Ircon Int. J.O.
  • Supervision Consultants are Indah Karya, Widya Graha Angsana & Tribina
  • Total Length is 4 km
  • Concrete supplied by Beton Indotama Surya
  • Total Concrete Volume is 30,000 m3
  • Admixture supplied by Sika (Plastiment R & Sikament NN
  • Girder supplied by Wika Beton ( Glenium 317 from BASF & M 21 N from KAO)
11 summarize
11. Summarize
  • We got about 50 % share of the project
  • We supply to Adhimix Citapen (1 BP), Focon Indo Beton (1 BP) & Farika Duta Agung (2 BP in Purwakarta & 1 BP in Padalarang)
  • Sales value more than 500 million in 6 months (July to December 2004)
  • Farika Duta Agung Padalarang gave the biggest contribution for our sales value