CIPULARANG II TOLL ROAD PROJECT

CIPULARANG II TOLL ROAD PROJECT. C. Willy Hartono Sales Manager West Java Admixture System. Section I : Purwakarta Section II : South Purwakarta – Plered Section III. 1 : Plered – Cikalong Wetan Section III. 2 : Darangdan – Cikalong Wetan Section III. 3 : Cisomang Bridge

Antony
Download Presentation

CIPULARANG II TOLL ROAD PROJECT

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CIPULARANG IITOLL ROAD PROJECT C. Willy Hartono Sales Manager West Java Admixture System

  2. Section I : Purwakarta • Section II : South Purwakarta – Plered • Section III. 1 : Plered – Cikalong Wetan • Section III. 2 : Darangdan – Cikalong Wetan • Section III. 3 : Cisomang Bridge • Section IV. 1 : Cikalong Wetan – Cikubang • Section IV. 2 : Cikubang Bridge • Section IV. 3 : Cikalong Wetan – Cikamuning • Section IV. 4 : Cipada – Cikamuning • Summarize

  3. 1. General Overview • Total Length is 40 km • Divided by 9 Sections • Starting in March 2004 & done before April 25, 2005 (The 50th Anniversary of Asia – Africa Conference in Bandung, West Java) • Starting with earthworks in March 2004 & continuing with concrete works in July 2004 • Girder produce insitu & by precaster (Adhi Precast, Wika Beton, & Saeti)

  4. 2. Section I : Purwakarta • Main Contractor is Mawatindo • Supervision Consultant is Virama Karya • Total Length is 9 km • Concrete supplied by Farika Duta Agung (2 BP). • Concrete Volume 100,000 m3 • We supplied 100 % (Pozzolith 101 Ri & Rheobuild 1100) to Farika Duta Agung • Wet Mix for Rigid Pavement

  5. 2. Section I : Purwakarta

  6. 3. Section II : South Purwakarta - Plered • Main Contractor is Adhi Karya Division III • Supervision Consultants are Cipta Strada, Saka Adhi Prada & Amythas Expert • Total Length is 8 km • Concrete supplied by Adhimix • Concrete Volume 80,000 m3 for Rigid Pavement only • We supplied 100 % (Pozzolith 100 Ri & Rheobuild 1100) • Wet Mix & low slump for Rigid Pavement & concrete barrier • Girder Supplied by Adhi Precast

  7. 3. Section II : South Purwakarta - Plered

  8. 4. Section III. 1 : Plered – Cikalong Wetan • Main Contractor is Waskita – Yasa J.O. • Supervision Consultants are Delta Tama Waja, Buana Archicon & Prosys • Total Length is 6.3 km include 500 m long bridge • Concrete supplied by Yasa Readymix & Multi Structure • Total Concrete Volume is 40,000 m3 • Admixture supplied by Fosroc (SP 337 & RP 264 M) to Yasa Readymix & Grace to Multi Structure • Girder produced in situ with total 153 pieces using Yasa Readymix

  9. 4. Section III. 1 : Plered – Cikalong Wetan

  10. 5. Section III. 2 : Darangdan - Cikalong Wetan • Main Contractor is Nindya Karya • Supervision Consultants are Multi Phi Beta, Tata Guna Patria & Indra Karya • Total Length is 4 km • Concrete supplied by Dwi Dinamika • Concrete Volume 40,000 m3 • Admixture supplied by Fosroc (SP 337 & RP 264 M) • Girder Supplied by Wika Beton (Glenium 317 from BASF & M 21N from KAO)

  11. 5. Section III. 2 : Darangdan - Cikalong Wetan

  12. 6. Section III. 3 : Cisomang Bridge • Main Contractor is L & M System • Supervision Consultant is Global Profex Synergy • Concrete supplied by Pionir Beton • Concrete Volume 25,000 m3 • Admixture supplied by Sika (Plastiment RMC) • Girder produced insitu (Sikament NN) & supplied by Saeti Concretindo Wahana (Rheobuild 893)

  13. 6. Section III. 3 : Cisomang Bridge

  14. 7. Section IV. 1 : Cikalong Wetan - Cikubang • Main Contractor is Daya Mulya Turangga • Supervision Consultants are Bina Karya, Eskapindo Matra & Hasfarm Dian Consultant • Total Length is 5 km • Concrete supplied by Focon Indo Beton • Total Concrete Volume is 30,000 m3 • Admixture supplied by BASF (Pozz. 101 Ri & Rheobuild 1100) & Sika (Plastiment R & Sikament NN ) • Girder supplied by Wika Beton ( Glenium 317 from BASF & M 21 N from KAO)

  15. 7. Section IV. 1 : Cikalong Wetan - Cikubang

  16. 8. Section IV. 2 : Cikubang Bridge • Main Contractor is Propelat – Wika J.O. • Supervision Consultant is Yodya Karya • Total Length is 4 km including 400 m long bridge • Concrete supplied by Focon Indo Beton • Total Concrete Volume is 30,000 m3 • Admixture supplied by BASF (Pozz. 101 Ri & Rheobuild 1100) & Sika (Plastiment R & Sikament NN) • Girder supplied by Wika Beton ( Glenium 317 from BASF & M21N from KAO)

  17. 8. Section IV. 2 : Cikubang Bridge

  18. 9. Section IV. 3 : Cikalong Wetan - Cikamuning • Main Contractor is Hutama Karya • Supervision Consultant is Indec & Ass Ltd. • Bridge with 750 m long (The longest bridge in Cipularang II project) • Concrete supplied by Farika Duta Agung • Total Concrete Volume is 50,000 m3 • We supplied 100 % (Pozzolith 101 Ri & Rheobuild 1100) • Girder produced in situ with total 183 pieces

  19. 9. Section IV. 3 : Cikalong Wetan – Cikamuning

  20. 10. Section IV. 4 : Cipada - Cikamuning • Main Contractor is Sumber Mitra Jaya – Ircon Int. J.O. • Supervision Consultants are Indah Karya, Widya Graha Angsana & Tribina • Total Length is 4 km • Concrete supplied by Beton Indotama Surya • Total Concrete Volume is 30,000 m3 • Admixture supplied by Sika (Plastiment R & Sikament NN • Girder supplied by Wika Beton ( Glenium 317 from BASF & M 21 N from KAO)

  21. 10. Section IV. 4 : Cipada - Cikamuning

  22. 11. Summarize • We got about 50 % share of the project • We supply to Adhimix Citapen (1 BP), Focon Indo Beton (1 BP) & Farika Duta Agung (2 BP in Purwakarta & 1 BP in Padalarang) • Sales value more than 500 million in 6 months (July to December 2004) • Farika Duta Agung Padalarang gave the biggest contribution for our sales value