Excavation is done to lay foundation structure below the ground level to support the building or house that will be constructed above the ground. And also for several less common reasons like exploration, mining, environmental restoration. Following are a few basic rules used by the best excavation companies in Calhoun GA<br>https://www.alliedug.com/

Download Presentation

Basic Rules of Excavating the Ground for Construction Process

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Basic Rules of Excavating the Ground for Construction Process

  2. Excavation is the process with which a construction contractor will demolish the ground and dig the earth to reach to a certain point. Unlike drilling, this process requires extensive ground cleaning and requires a heavy machinery to perform the task of digging and throwing the earth aside; operated by a professional. Usually excavation is done to lay foundation structure below the ground level to support the building or house that will be constructed above the ground. And also for several less common reasons like exploration, mining, environmental restoration.

  3. Following are a few basic rules used by the best excavation companies in Calhoun GA.

  4. The site area is adequately measured with understanding of center line and drawings.

  5. The level below the ground to be dug by an excavation contractor is decided by setting a plan and marking reference points above the ground.

  6. Around 2-4 benchmarks are marked in the corner for measurement level and tracing is lined with lime powder.

  7. After all that, the excavation is done using an excavation machine depending on the necessity and availability.

  8. The excess soil being removed will be stock piled at least 1 m away from the ditch to avoid sweeping in of the soil again with rain or other forces.

  9. The excavated pits will be given a dressing and loose soil will be shored, followed by appropriate side sealing.

  10. If you are in need of a proper excavation companies Calhoun GA, make sure you contact Allied Underground for the best service in town.