Black start procedures review of startup power to ntpc rgm
This presentation is the property of its rightful owner.
Sponsored Links
1 / 1

BLACK START PROCEDURES:REVIEW OF STARTUP POWER TO NTPC,RGM. PowerPoint PPT Presentation


  • 83 Views
  • Uploaded on
  • Presentation posted in: General

BLACK START PROCEDURES:REVIEW OF STARTUP POWER TO NTPC,RGM. WHY ISLANDING OF NTPC UNITS WITH A RADIAL LOAD IS NOT PREFERABLE. NTPC UNITS - FREE GOVERNOR MODE?. LOW FAULT LEVEL. LOW POWER NUMBER IN THE ISLAND. PHASE IMBALANCES – SECONDARY COLLAPSE.

Download Presentation

BLACK START PROCEDURES:REVIEW OF STARTUP POWER TO NTPC,RGM.

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Black start procedures review of startup power to ntpc rgm

BLACK START PROCEDURES:REVIEW OF STARTUP POWER TO NTPC,RGM.

WHY ISLANDING OF NTPC UNITS WITH A RADIAL LOAD IS NOT PREFERABLE

  • NTPC UNITS - FREE GOVERNOR MODE?.

  • LOW FAULT LEVEL.

  • LOW POWER NUMBER IN THE ISLAND.

  • PHASE IMBALANCES – SECONDARY COLLAPSE.


  • Login