SP/12. China Initial SWIM Program Overview. Air Traffic Management Bureau, CAAC Aero-Info Technologies Chiang Mai, March 2012. Background. China Initial SWIM Project launched in 2011

zita
Download Presentation

China Initial SWIM Program Overview

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SP/12 China Initial SWIM Program Overview Air Traffic Management Bureau, CAAC Aero-Info Technologies Chiang Mai, March 2012

  2. Background • China Initial SWIM Project launched in 2011 • A sub-program of China Civil Aviation Collaborative ATM Technology Program, Funding by Ministry of Science and Technology (MOST) and Civil Aviation Administration of China(CAAC)

  3. Background • The project aims to • Study and evaluate SWIM concept and key technologies • Propose Information Management Infrastructure for next generation ATM system in China • Prototype and demonstrate initial SWIM capabilities

  4. Schedule TASK 1: SWIM Requirements Analysis Milestone Task 1(Phase I) Milestone Task 1(Phase II) TASK 2: SWIMKey technologies study Milestone Task 2(Phase I) Milestone Task 2(Phase II) TASK 3 SWIMprototype development Milestone Task 3(Phase I) Milestone Task 3(Phase II) TASK4 SWIMdemo system deployment and evaluation Milestone Task 4 2011 2012.6 2013.1 2013.6 2014.1 2014.6 2014.12

  5. Tasks of initial phase (1) • Prototype platform requirement analysis • Bottom Up • What current ATM applications are involved in SWIM? • What types of information are shared through SWIM? • Top Down • New ATM operation concepts and procedures

  6. Tasks of initial phase (2) • Technology study • Investigate current ATM system characteristics • e.g. ATC, AIS, MET … • Technology pre-screening based on defined selection principle and criteria • High level system architecture candidates • e.g. SOA, EAI… • Integration technology candidates • e.g. Web Service, REST, MOM, JMS, CORBA …. • Should pay more attentions to particular driving force of architecture design, i.e. security, performance, governance etc.

  7. Tasks of initial phase (3) • Establish SWIM laboratory • Technology assessment • Prototype development • Test bed

  8. Participants • TECHNICAL CENTER OF ATMB • NORTH CHINA ATMB • AERO-INFO TECHNOLOGIES • China Travelsky • BEIHANG UNIVERSITY

  9. Plan of 2012 • Annual target • Launch platform requirement analysis • Start examining varies candidate technologies • Expected deliverables • Defined project management principle • Identify Platform requirement • Key technology assessment report