Slide1 l.jpg
This presentation is the property of its rightful owner.
Sponsored Links
1 / 25

The Devil's in the Details Connecting the Dots with YBP and Millennium and Shelf-Ready Acquisitions Southeastern Innovative Users Group January 25, 2011 PowerPoint PPT Presentation


  • 203 Views
  • Uploaded on
  • Presentation posted in: General

The Devil's in the Details Connecting the Dots with YBP and Millennium and Shelf-Ready Acquisitions Southeastern Innovative Users Group January 25, 2011 . Why did we automate the process? . • Consultants recommended change • Possible budget savings

Download Presentation

The Devil's in the Details Connecting the Dots with YBP and Millennium and Shelf-Ready Acquisitions Southeastern Innovative Users Group January 25, 2011

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Slide1 l.jpg

The Devil's in the DetailsConnecting the Dots with YBP and Millennium and Shelf-Ready AcquisitionsSoutheastern Innovative Users GroupJanuary 25, 2011


Slide2 l.jpg

Why did we automate the process?

• Consultants recommended change

• Possible budget savings

• Staff talents could be used elsewhere particularly with catalogers

• This method works well with both small and large volumes of books

• Change is good!


Slide3 l.jpg

Here’s the process in a nutshell for firm ordered items

• Place order in GOBI

• FTP order into Millennium

• Send EDIFACT order back to YBP

• Receive books and check against invoice

• Load PromptCat records

• Disburse books and handle exceptions

• Pay the electronic invoice

What’s needed to make this happen? …


Getting up and running everyone s involved l.jpg

Getting up and running – Everyone’s involved

• Innovative Interfaces – Products to purchase

• YBP – GOBI customization

• Library -- Millennium changes


The innovative side l.jpg

The Innovative side

Necessary products

• EDIFACT ordering (#408C)

• EDIFACT invoicing (#415)

• Extended Approval Plan Interface (#409)


The innovative side6 l.jpg

The Innovative side

EDIFACT ordering (Product #408C)

Allows the order to be sent electronically using the EDIFACT standard. It supports sending the purchase order number which is later used as an overlay matching point.


The innovative side7 l.jpg

The Innovative side

EDIFACT invoicing (Product #415)

Permits online processing of invoices from vendors who support the EDIFACT invoice format.


The innovative side8 l.jpg

The Innovative side

Extended Approval Plan Interface (Prod. #409)

Allows the library to receive MARC records with invoice data for Approval Plan or firm ordered books.


Set up vendors to support edifact l.jpg

The Millennium side

• Set up vendors to support EDIFACT

• Minimal editing of vendor record fields

• Create/edit load tables

• Innovative can do this for you fairly quickly

• Create/edit record templates


Select coding needed for ybp l.jpg

The YBP side

• Select coding needed for YBP

• Fund codes

• Vendor codes

• Be specific to optimize ordering

• Determine level of PromptCat records

• We chose LC, NLM, UKM and other member and national libraries


Slide11 l.jpg

The YBP side

• Work with the vendor to map your GOBI fields so they will automatically transfer to your order records

• Customize YBP GOBI program

• Notes, department field, acquisitions type, selector field, etc.

• Decide which GOBI fields are most important


Slide12 l.jpg

Customize


Slide13 l.jpg

MARC Tag 960

Order Record Fixed-Length Fields


Slide14 l.jpg

MARC Tag 961

Order Record Variable-Length Fields


Slide15 l.jpg

Just do it!

• Initially double-check 100% of the records and books quickly to ascertain problems

• Once the process is running smoothly sample a small percentage of the shipments

• Accept the fact that mistakes will slip by

• Remember that book shelvers will find some call number and label problems


Slide16 l.jpg

Humans are needed!

You’ll need to …

• Make sure books are covered and labeled

• Non-labeled books will not have cataloging

• Flag oversize and those with accompanying material

• Ensure proper labeling of specialized collections

• Make sure label has correct information

by performing a cursory glance of the books

• Pull items that need to be sent to patrons

• Use OCLC reports to identify problems


Oclc records and reports l.jpg

OCLC records and reports


Oclc records and reports18 l.jpg

OCLC records and reports


Oclc records and reports19 l.jpg

OCLC records and reports

  • Could be several reasons why we are not getting a record …

  • Additional copy

  • Replacement copy

  • Additional volume in series


Slide20 l.jpg

Another huge timesaver –

Automating the Approval Plan

• Much more streamlined -- GOBI is not involved which simplifies the process significantly

• Receive books and check against invoice

• Load PromptCat records

• Pay the electronic invoice

• Disburse books and handle exceptions


Slide21 l.jpg

Tips and lessons learned

• Ask Innovative to map the current date to the order record received date field

• Remember to update GOBI system with

new fund codes

• Wait for books to arrive before overlaying with the full MARC records

• Send YBP at least five year’s worth of ISBNs

to avoid duplication

• Try to have one local contact with YBP


Slide22 l.jpg

More tips and lessons learned

• Don’t delete EDIFACT order record

otherwise the full record will not find a match

• Accept most full-level cataloging

• Run a list of patrons awaiting notification of newly received items

• Look at the RACTION code in the extended view in Import Invoices

• Include series in this process if you wish


Slide23 l.jpg

Surprises!

• YBP started process 1½ months early

• Many records were initially not shelf-ready because of the conservative cataloging level we has selected

• Books are shipped once per week

• YBP cannot determine oversize items and

hence can’t label these books oversize

• Books with patron notification -- oops


Slide24 l.jpg

Innovative web sites

Use Extended Approval Plan to Acquire and Process Purchases

http://csdirect.iii.com/documentation/gobiprompt.shtml

Loading MARC Records from Book Vendors

http://vendordocs.iii.com/book/vendrtag.shtml

Electronic Invoice and Approval Processing Workflow Scenarios

http://csdirect.iii.com/documentation/approvalplan.shtml

• Vendor records (#102820-102821)

• Electronic ordering overview (#100650)

Innovative manual


Slide25 l.jpg

Questions or more information?

Michael Winecoff

UNC Charlotte

[email protected]

Southeastern Innovative Users Group

January 25, 2011


  • Login