Project Evergreen Presentation to Lakeside, Wolvercote and north Oxford residents 25 th March 2010

Learn about Chiltern Railways' Evergreen project, its proposals, and benefits for North Oxford residents. Topics include train frequency, track layout, noise and vibration, Water Eaton Parkway, and the Oxford Northern Gateway. The presentation will be given by Adrian Shooter CBE, Allan Dare, Steve Barker, John Horsman, Mike Fraser, and Paul Clarke.

zeal
Download Presentation

Project Evergreen Presentation to Lakeside, Wolvercote and north Oxford residents 25 th March 2010

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Project EvergreenPresentation to Lakeside, Wolvercote and north Oxford residents25th March 2010 Adrian Shooter CBE - Chiltern Railways Allan Dare - Chiltern Railways Steve Barker - Chiltern Railways John Horsman - Chiltern Railways Mike Fraser - ERM Paul Clarke - Ardent

  2. Contents • Chiltern Railways - who we are • Project Evergreen - what we’re proposing, and why • North Oxford issues • Train frequency and speeds • Track layout • Noise • Vibration • Water Eaton Parkway • Oxford Northern Gateway • Environment • Building the line • Transport & Works Act process

  3. Passenger miles, indexed Chiltern Railways • 20-year investment-led franchise • UK rail industry leader • 220% traffic growth since 1996 • 95%+ punctuality • 90% positive “overall opinion”, National Passenger Satisfaction Survey • Over £400m of private investment since 1996 • We have delivered 8 major infrastructure schemes on time, on budget

  4. Chiltern’s “Evergreen 3” project • £250m investment project • Funded by Chiltern Railways • Not dependent on scarce public funds • Faster journeys on the Chiltern Main Line from London to Birmingham • Work has already started under existing powers • New route to Oxford • New connecting line at Bicester • Bicester – Oxford line restored as a main line railway • Bicester Town and Islip stations rebuilt • New station at Water Eaton Parkway • Additional platforms at Oxford station • Dependent on Transport & Works Act being granted • Transport & Works Act application for Oxford line submitted January 2010

  5. Evergreen 3 – to Oxford

  6. Oxford route benefits • Sustainable transport • Less fuel, less emissions, less carbon, less congestion • Choice of routes to London • Avoids disruption on the Paddington line 2012 - 2017 • Oxford - High Wycombe trains for first time since 1964 • Integrated transport at Water Eaton Parkway • Train – bus – bike - car interchange • North Oxford gets a station - no need to drive through city centre to catch a train • Fast commuter service Bicester - Oxford • Avoids the jams on the A34 • Complements East – West Rail

  7. East-West Rail • Oxford – Bletchley – Bedford - Cambridge • Closed in 1967 – widely regarded as a huge mistake • Shares Oxford-Bicester section with Chiltern’s scheme • East-West Rail Consortium of local authorities aspire to reopen the line • Engineering studies for Oxford – Bletchley - (Milton Keynes) section under way • No decision yet on whether to proceed, and authority is unlikely in near future • Chiltern “future proofing” Oxford-Bicester works as a public policy benefit East-West Rail to Milton Keynes and Bedford Bicester Town Reading Oxford Water Eaton Parkway Chiltern Railways to High Wycombe and London Marylebone

  8. The ‘Varsity line • Authorised by the Oxford & Bletchley Railway Act, 1846 • Opened to Banbury Road (Water Eaton) in 1850, to Oxford in 1851 • Built as a double track railway, singled in 1973 • Closed to passengers in 1967 - freight services continued • Passenger service to Bicester reopened in 1987 • Track doubling and extra services covered by existing powers • Recent increase in passenger trains funded by Oxfordshire County Council Wolvercote Halt, ca 1905

  9. Proposed passenger train services • 2 Chiltern trains each hour Marylebone-Oxford • London – Oxford 66 minutes journey time • Bicester - Oxford 14 minutes • High Wycombe – Oxford 38 minutes • London – Water Eaton Parkway 58 minutes • Less frequent service early morning / late evening • First train ca. 0600, last train ca. midnight • Chiltern “Clubman” rolling stock • If/when East-West Rail goes ahead, 2 trains each hour Oxford-Milton Keynes FR Yugoslavia

  10. Chiltern trains • Chiltern “Clubman” rolling stock • 100mph top speed • Lightweight, air suspension • Mostly 3-4 coaches long • Any East-West Rail trains are likely to be similar

  11. High-speed rail • Chiltern Railways is not part of the Government's proposal for a new high-speed line to Birmingham • High-speed trains will not use the Chiltern tracks

  12. Freight trains • Chiltern does not run freight trains • Existing 2-4 freight trains a day will continue • Keeping ‘000s of lorries off the roads • If /when East-West Rail goes ahead, there may be more freight trains • Mostly shipping containers from Southampton – alternative is the A34 • Capacity for 1 freight train “path” each hour, but not all paths will be used • Maximum axleload 25t as now - container trains are ca. 18t • New structures will have clearances for international-standard containers • Standard practice for all rail schemes • Taller does not mean heavier

  13. Wolvercot* tunnel • Department for Transport is funding work to lower the floor in Wolvercot tunnel • Enables double track at full clearances for East-West Rail • Saves disruption and public money compared with doing the work later • The track under First Turn bridge will also be lowered • Realigned track will be only 6 feet nearer to houses than now • I.e. where it used to be * Wolvercot tunnel, Wolvercote village

  14. Train speeds • Maximum speed for passenger trains through Wolvercote and north Oxford will be 75mph • Rest of the line to Bicester will be 100mph • Existing main line through north Oxford to Banbury/Worcester is 90mph • Lower speeds would increase the time taken over critical track sections • With braking and acceleration either side, 30mph would cost 3 minutes each way • Knock-on effect on the single line into Oxford, on turn-round time there, and “pathing” onto the main line at Bicester • We could not operate a reliable timetable at slower speeds • Freight trains will run at 30mph • Limited by speed through junction with main line

  15. Noise • Existing “baseline” noise measurements taken in lineside areas • Forecast increases in noise calculated from actual measurements of the trains that will use the line • Modern trains and track are much quieter than those used a few years ago • Statutory requirement for mitigation if noise exceeds 66dBLAeqday, 61dBLAeqnight # • We do not reach these levels BUT • We will provide mitigation even where not required by statute • This includes the Lakeside and Wolvercote areas • If EWR goes ahead, further mitigation may be provided # dBLAeq = noise over time

  16. Noise exposure • Faster trains = greater noise, but less duration • Mitigation will reduce noise level

  17. Noise levels

  18. Vibration • There are ‘000s of buildings next to or above railway lines • Damage due to vibration from trains is virtually unknown • Vibration in the past due to old-fashioned wagons on poorly-maintained track • New track will be built and maintained to high standards • Modern trains have sophisticated suspension • Predicted vibration level far lower than that which would damage property

  19. Mitigation • Our starting point is to eliminate noise/vibration at source • We will provide further mitigation where appropriate • Range of mitigation measures • Track design • Rail dampers • Noise barriers • Double glazing and soundproofing • Optimum solution depends on local circumstances – e.g. topography • But cannot vary every few yards • Subject to detailed design work over the next few months • Further surveys where appropriate • Final design may depend on TWA Inspector's recommendations Typical noise barrier

  20. Compensation • “Before and after” defect surveys • Any damage due to e.g. construction works is rectified by the scheme promoter • Compensation for losses due to noise and vibration is payable by the scheme promoter at any time after scheme has been in operation for 12 months • Subject to arbitration by the Lands Tribunal

  21. Water Eaton Parkway • Multi-modal interchange • Site chosen due to good bus links • Easy access to the railway from north Oxford • Avoids traffic delays getting to the main Oxford station

  22. Water Eaton Parkway –the site • Next to the bus park & ride terminus • In green belt, but on brownfield land • Derelict grain silos will be demolished • Stone sidings will be relocated • We believe the station is a better use for the site than the proposed waste depot • We are NOT proposing any other development at Water Eaton

  23. Water Eaton Parkway - facilities • Mainline station • Fully staffed • Coffee shop and news-stand • Level access throughout • Multi-modal train/bus/car/cycle interchange • Express buses to city centre and the hospitals • Local buses to Banbury Road, Kidlington, Airport and villages • Cycleway • 100 covered spaces for bikes, with room for more • 850 extra parking spaces for rail users • Low-profile buildings in traditional style, to minimise green belt impact

  24. Relocated stone sidings Water Eaton Parkway - layout Railway car parking A34 A4165 2 platforms 2-level station building Pick-up/ drop-off Local bus stops and bus layby Existing bus park & ride Pedestrian crossing and step-free ramp Pedestrian promenade to bus terminal Covered cycle parking Remodelled road junction

  25. Water Eaton Parkway – road access • Extensive surveys and computer simulations undertaken • Existing queues on Banbury Road are due to inefficient junction layout at Water Eaton • We will completely remodel this junction • Eliminates the tailbacks • Gives capacity for growth to 2026 and beyond • Bus lanes maintained • Over 60% of Oxford-area passengers will use bus, bike or foot to get to the station • Bicester commuters taking the train will also reduce road congestion

  26. Oxford Northern Gateway • We are NOT associated with the Northern Gateway project • Our business case is not dependent on it • We rejected building a station at Peartree • Adverse impact on the local community, highways and the environment • IF Northern Gateway goes ahead, we may be able to provide pedestrian and cycle links to Water Eaton Parkway • This would help reduce car use arising from the development

  27. Environment • Exhaust emissions: • Chiltern Clubman trains have modern diesel engines with lower emissions than those currently used on the Oxford line • We are designing all new and rebuilt structures to enable electrification in future • Effluent: • All Chiltern trains have toilet retention tanks, we do not dump waste on the track • Wildlife: • We are undertaking further bat surveys, as these are seasonally-dependent • Agencies: • We are working closely with Natural England and the Environment Agency

  28. Building the line • Detailed design process under way • Oxford-based companies playing a key role • Construction will commence once TWA Order granted • Work will take 12 months • We are hoping to reduce this further • Time taken at any one location will be much shorter • Work will basically progress east-west • Almost all work will be done during daytime and on weekdays • Much of the work is low-impact, e.g. installing cables or fitting out buildings • Bicester Town – Oxford trains will be replaced by buses for up to 9 moths • Temporary construction compound at Peartree • Landscape will be restored after use • Code of Construction Practice agreed with contractor • 24-hour hotline

  29. Transport & Works Act • TWA Order will give: • Statutory authority to build and operate the new connecting line at Bicester • Powers to close level crossing and divert paths and highways • Deemed planning permission for new and rebuilt stations • Compulsory purchase powers • Transport & Works Act application submitted 6th January 2010 • Objection period closed 17th February • Public Inquiry confirmed • Expected to be early October • Objectors and expert witnesses have right to appear at the Inquiry • Inspector may make recommendations, e.g. on mitigations • Secretary of State’s decision expected spring-summer 2011 • Will not be affected by the election

  30. Putting the record straight • Trains will run at 100mph past local houses - NO • Passenger trains will run 24 hours a day - NO • Risk of subsidence - NO • Thousands more cars on the A34 and local roads - NO • Closure of Park & Ride at Water Eaton - NO • Poorly integrated and reduced bus services - NO • Effluent discharged onto tracks - NO • Heavier freight trains - NO

  31. What it’s all about Beating the motorway jams!