Space Telescope- European Coordinating Facility Presentation to the ESO/ESA Annual Review 15.03.04

Space Telescope- European Coordinating Facility Presentation to the ESO/ESA Annual Review 15.03.04 Bob Fosbury Pt 1 (am); Pt 2 (pm). Advanced Calibration and Analysis Bob Fosbury (Rosa, Hook, Bristow, Fiorentino, Kerber, etc.). Advanced Calibration — 2 examples. Dispersion Model E140H.

zahi
Download Presentation

Space Telescope- European Coordinating Facility Presentation to the ESO/ESA Annual Review 15.03.04

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Space Telescope- European Coordinating Facility Presentation to the ESO/ESA Annual Review 15.03.04 Bob Fosbury Pt 1 (am); Pt 2 (pm)

  2. Advanced Calibration and Analysis • Bob Fosbury • (Rosa, Hook, Bristow, Fiorentino, Kerber, etc.)

  3. Advanced Calibration — 2 examples Dispersion Model E140H • good • solution • ~ 0.4 pix • for • 423 lines • while • iterating • on • engineering • guesses •  ~ 3 pix • for • 423 lines STIS - Wavelengths from Model Physical Instrument Model describes configuration of optical elements (Ray trace, optimised by Simulated Annealing) Generic Spectrograph Model successfully applied to FOS, STIS (HST) and UVES (VLT) Example: For STIS 2-D Echelle (Rmax~100,000) 115 – 1100 nm, 7 years of ops predictive accuracy 0.4 pix across 2048 * 2048, includes distortion of up to 2 px at edges

  4. STIS-CE: CCD Readout Model Physical model of the CCD readout process (charge trapping and trailing) Improved (Spectro-)photometry: up to 10% Allows correction of the entire 2-D image array, applicable to spectroscopy, not just extracted stellar fluxes Developed for STIS but portable to other detectors

  5. STIS-CE Lamp Project • Measured HST (FOS, STIS) calib lamps FOR THE 1st TIME ! • Spectra of Pt/Cr-Ne lamp at NIST: 110 – 320 nm • List of > 5000 lines,  accurate to < 1/1000 nm, intensities • STIS: flight lamp Pt/Cr-Ne • lab data used, Pt-Ne available Echelle,  c  2513 Å # of lines: Pt-Ne 258 # of lines: Pt-Ne 258 vs Pt/Cr-Ne 1612

  6. Advanced Calibration - STIS CE Project • “ … I think the POA-CE programme shines light on what an incredible scientific machine HST is … I am confident, that ST-ECF’s programme to provide the ultimate calibration for HST data will be seen by the entire astronomical community – a thankful community – for the obvious jewel it is …” • Malcolm B. Niedner, HST Deputy Senior Project Scientist, NASA/GSFC • cit from “Guest Editorial” , STECF Newsletter 35, p 2 (Jan 2004)

  7. JWST Heritage • ECF staff participation since 1995 • (Rosa, Albrecht, Cristiani, Fosbury, Freudling, Kuntschner) • Membership of NASA Ad Hoc Science Working Group (ASWG -> June 2000) • Membership of ESA Study Science Team (SST) • Contributions to and production of successful NGST proposal to ESA in Jan 2000 • Various NGST/JWST outreach materials • Including the ESA logo

  8. Attendance at ESA-funded industrial consortium meetings for NIRSpec • Seven ECF NIRSpec Instrument Science Reports • Co-authorship with STScI of ‘NIRSpec Operations Concept’ (June 2003) • Current work on NIRSpec Ground Calibration Concept and on Target Acquisition Procedures

  9. pm — future planning

  10. Future plans • Format of discussion • Introduction & background • Near-term (-> 2006) • Long-range (-> 2012) • Discussion • Bob Fosbury

  11. Introduction and background • ECF skills base • Research Astronomers (ESO Faculty members) = Instrument Scientists: 8 (+2 = 1 on leave, 1 VO EC funded) • S/W: 8 • Outreach/graphics: 2 • Admin/operator: 2.25 • Familiarity with Hubble and ESO operations and archives

  12. Links and collaborations • ESO: Archive/VO, Faculty, Instrument Science, Large Programmes (eg. GOODS), Outreach • ESA: Outreach, JWST, EC issues, Archives, VO • STScI: Archive, Instrument Science, HST, JWST, TAC support, Outreach, HDF/GOODS/HUDF

  13. Near-term plans • Instrument Science • Continued support of slitless spectroscopy (NICMOS, ACS) with STScI • Application of Advance Calibration methodologies, currently applied to STIS • JWST NIRSpec Calibration with ESA project, STScI, industry • Exploitation of ECF heritage • Support of large science programmes (eg. Drizzle, astrometry) with STScI, ESO, community

  14. Archive/VO • Operation and development of European HST (and ESO) archive in collaboration with ESO • In coordination with VO developments and, in collaboration with STScI and CADC, provide improved scientific data products, eg. the extension of the WFPC2 ‘association concept’ to ACS • Interface between large science programmes (eg. GOODS) and VO to design appropriate high-level data products, eg. for multi-object spectroscopy

  15. Outreach • Continue HST/JWST outreach • Set up ‘Audio/Visual Products Lab’ (with part-external funding) • Closer integration with ESO • Closer integration between outreach and VO methodologies & mechanisms: they have many similar requirements!

  16. ESA/ESO science coordination • Opticon (EC) – ESA contact point • ESA/ESO science working groups • technical secretariat • Coordinated observing time allocation, eg. ESO/XMM-Newton • Large ground/space ‘legacy’ programmes (eg. GOODS)

  17. Proposed Science Coordination Activities • (more detail) • ESA/ESO joint working groups on future project planning, eg. Extra-solar planets: simulation, modelling, technical coordination • Building AVO science cases • Monitor/support relevant science advisory bodies (Alma, Herschel, XMM, JWST) • XMM-ESO • TAC support, membership (done for HST) • Feasibility checks for joint proposals • Spectroscopic instrumentation • Euro3d • Instrument Modeling of ground and space spectrographs based on existing work (Fourier model of NIRSPEC/JWST, FOS/STIS models)

  18. Long-term plans • 2 Broad Objectives • Flow-down specific tasks • -> Projects • Assess scale • Discuss choices

  19. Objective 1 • To capture the experience of operating large facilities on the ground and in space • Use this knowledge to help maximise the scientific return from current and future facilities • Examples: • The successful adaptation of the HST operational model to ESO VLT • The co-evolution of the HST and ESO archive • The use of advanced calibration methodologies for HST and VLT instruments

  20. Objective 2 • To make the public more aware of European achievements in astronomy — especially by ESA and ESO — and thus • Boost the image of science in Europe and attract funding and the best students into the subject • Examples: • HEIC News and Video releases • ESO/ESA Educational Exercises • Development of extensive graphical and distribution infrastructure

  21. Flowdown 1a • Understand the instrument • Calibrate it properly • Feed high quality science-ready data products to users and to the archive • Call this INSTRUMENT SCIENCE (IS)

  22. Implications 1a • Close participation in the instrument design and development process • Early development of instrument modelling and pre-operational calibration • Need a strong astronomical research base to give appropriate experience and generate peer respect

  23. Flowdown 1b • Make the Archive the link between the instruments and the broad spectrum of users • Major effort Common interest Major effort IS Archives VO

  24. Implications 1b • The VO absolutely depends on the Archive containing high quality and well-described data products • The IS process can be described and characterised by a ‘template’ — the ECF cannot, at its current scale, perform this process for more that a very small number of instruments at any one time

  25. Scale of effort • Instrument Science • Small project, eg. ACS grism mode • 3 FTE (astronomer + s/w engineer) for 2 years • Medium project, eg. STIS • 4 FTE for 3 years • Large project , eg. KMOS, MUSE, NIRSpec • 10–14 FTE for 5 years (based on previous JWST Sci Ops study - Fosbury/Macchetto)

  26. Scale of effort • Archive/VO • (see AVO/ Euro-VO slides)

  27. What’s Next for AVO? • We need to move towards EURO-VO: • Start providing simple but powerful tools to facilitate exploitation of multiwavelength data (e.g. image alignment and registration tool) • Work with (not for) the data centres to increase interoperability [inter-archive tools] and promote high-quality, “science-ready” products; AVO needs these to be successful (see last demo)! • Make progress in turning ESO/ST-ECF archive “VO-compliant” • Funding situation not clear

  28. VO connecting all European astronomical data centres and providers The Future Grid+Net

  29. Persistent • Data Standards • User support • IVO link • Distributed • R&D • VO Technologies for new projects and facilities 2005+

  30. EURO-VO Resources - 4 Years • Data Centre Alliance • UK, France, Germany, Italy, Netherlands, Spain, ESO, ESA [initially 15 Centres] • 2 FTE per centre + 100 kEuro/yr upgrades • Facility Centre • 4 support scientists (registries, outreach, project support = ASTROVIRTEL II) • Technology Centre • 11 FTE development staff • TOTAL: 15.5 Million Euro • EC: 8 Million Euro

  31. ESO/ST-ECF Science Archive Facility holdings

  32. EURO-VO Startup • EURO-VO component proposals to FP6 in 2003 failed • Next proposal opportunity in mid 2005 • EURO-VO is too important to be left TOTALLY to the EC competitions • EURO-VO partners will sign MOU in July 2004 to start project and bridge the gap between the end of AVO (Nov. 2004) and the beginning of EURO-VO • ESO will contribute 4 new FTEs for 18 months starting in July 2004 for EURO-VO DCA and VO-TECH work program • VO-TECH proposal to FP6 design studies submitted in March 2004 for ~ 5 Million Euro

  33. Flowdown 2 (Outreach) • Forge appropriate links with ESO • Continue core activities • Strengthen distribution networks and links with journalists • Develop greater capacity for visualisation of astronomical results (AV-lab) • Develop Educational Products with ESA and ESO

  34. Scale of effort • Outreach • Outreach scientist/Group head 1 FTE • Graphics designer 1 FTE • Admin/proofing/distribution 0.5 FTE • AV-lab staff (‘External’ funding) • Image specialist 1 FTE • Graphic designer 1 FTE • Education specialist 1 FTE • Journalist/Teacher associates 2 x 0.5 FTE

  35. Discussion • Structure • Do we agree on the 2 main goals? • What process do we employ to select projects? • How are these projects endorsed by management? • How do we get resources for the ESA VO efforts?