New LUMAT board

New LUMAT board. Fabio Giannuzzi - Filippo Giorgi – Mauro Villa Bologna Lucid meeting – 10th December 2013. Key points. Main goals Build new system on solid ground Same algorithms, same functionalities Basic idea: Duplicate ROD data and send them to a new LUMAT

yamin
Download Presentation

New LUMAT board

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. New LUMAT board Fabio Giannuzzi - Filippo Giorgi – Mauro Villa Bologna Lucid meeting – 10th December 2013

  2. Key points • Main goals • Build new system on solid ground • Same algorithms, same functionalities • Basic idea: • Duplicate ROD data and send them to a new LUMAT • Same LUMAT main board • Update only the input mezzanines • From mezzanine with 24+24 LVDs inputs to optical link mezzanines • Provide ROD – Mezzanine protocols for lumi measurement

  3. New LUMAT Board • “Minimal changes” • (V2 Edro - ZDC) • “FTK“ input mezzanine • HW tests to be done systematically Rod A Rod C

  4. Hardware under test in lab • New Lumat board • FTK mezzanines • LUCROD prototype • In sharing with other activities.

  5. Development plan • Ensurefixedlatency serial communicationoverfibers • Decide protocoltouseDone • FTK mezzanineto FTK communication (Xilinx-Xilinx) Done • LUCROD to FTK communication (Altera-Xilinx) Ongoing • FTK-to-FTKbeamsimulationOngoing • Developmentof FTK algofirmwarePlanned • Update ofStratixfirmwaretobestarted • Software integrationtobestarted • Needfixedrequirement: • Ifyouwouldliketoadd/changesomething, pleasesay/writeit down now!

  6. LUCROD-LUMAT Communication LUCROD to LUMAT: • 16 (PMT)+4(fibers) hit bits/BCID (clock tick) • Orbit Signal (marks the BCID=0 in the stream) • Data Valid/Live info • 2 spare signals (handshake, lumi block transition) • Control words (parity and others) in the S-link protocol LUMAT to ROD • Nothing (in principle); could be something like handshake, live info… Total: 24 bits

  7. FTK-to-FTK serial tests Tests done using the same FPGA or 2 different FPGA with the same reference clock (40 MHz) but different transmission clocks Full realistic chain on TX and RX side: TX: 32 bit @ 40 MHz -> dual clock FIFO-> 50 MHz rd clk -> 16 bit data sent at 100 MHz with alignment words RX: received data at 100MHz, removed alignment words ->  32 bit data at 50 MHz -> dual clock FIFO  32 bit @ 40 MHz No loss of sync; no loss of data.

  8. Known problems at the moment • The SFP oscillator is not programmable yet • Minor issue: we can change the oscillator, but it will take some time  deferred • LUCROD prototype receives data on the optical link but it does not send them out  investigating • Manpower is short and over-committed - for many reasons: so do not ask too many changes!

  9. Summary • New LUMAT Card and LUCROD prototype already in our hands • Hardware tests yet to be done systematically • Firmware in the writing phase • LUCROD-LUMAT serial protocol: • Protocol decided; in the implementation phase