1 / 5

November 2011

Installation Information. Briefing for Venues. November 2011. CAPTIVE MEDIA. Installation. Each unit is connected via two cables ducted from the back of the casing and through the wall panel into the wall space

Download Presentation

November 2011

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Installation Information Briefing for Venues November 2011 CAPTIVE MEDIA

  2. Installation • Each unit is connected via two cables ducted from the back of the casing and through the wall panel into the wall space • 12v DC for power – via a power adaptor (safely secured) to a metal clad, RCD protected socket • Cat 5e data cable for internet connectivity – to an internet router (all cables numbered at both ends) • All in line with current NIC EIC regulations and Cat5e standards. • The site self-survey will establish the most suitable connection points and appropriate cable runs, which will be hidden wherever possible. • It will also confirm whether any pre-work is required (e.g. to hide cables where not wall cavity exists, or where a non-standard urinal is in place – see next page). Installation quotations are based on the site survey. At your request Captive Media can conduct the site survey. • Captive Media works with a long-established, national IT installation company to ensure the install is done to spec, and to guarantee service cover, with remote monitoring, 24/7 helpdesk and next-day call-out. They can also audit your existing IT infrastructure, if you choose. • No on-site commissioning is required. The units will start to play games and PTV content as soon as they are connected. • A typical 3 or 4 unit install is complete within a day – all that is required is uninterrupted access to the washrooms and any areas for cable runs. Isolated, wall mounted ‘power brick’ ~ 240v AC Mains connection point: 20 A RCD Switched Spur Internet connection point Cat 5 data cable 12 v DC Wall space

  3. 5 – point installation requirement checklist  5 ticks? We’re all set!

  4. Unit Dimensions and Positioning

  5. Technical Specifications

More Related