1 / 44

Schistosomiasis Control in Kwabeng

Schistosomiasis Control in Kwabeng. Social, Environmental, and Engineering Challenges to Reducing Schistosomiasis Incidence in a Rural Town in Eastern Ghana. Tufts University Department of Civil and Environmental Engineering. Project Team. Student Members:

wilmer
Download Presentation

Schistosomiasis Control in Kwabeng

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Schistosomiasis Control in Kwabeng Social, Environmental, and Engineering Challenges to Reducing Schistosomiasis Incidence in a Rural Town in Eastern Ghana Tufts University Department of Civil and Environmental Engineering

  2. Project Team • Student Members: • Casey Caldwell, Robert Curry, Charline Han, Daron Kurkjian, Kelly Sanborn, and Katie Shuman • Faculty Advisors: • John Durant and David Gute Tufts University, Dept. of Civil & Environmental Engineering

  3. The Problem • Schistosomiasis is water-borne parasitic disease that is contracted by coming into contact with contaminated water • We hypothesized that hydraulic alterations to the river in Kwabeng have increased the incidence of schistosomiasis Source: Rob Curry Tufts University, Dept. of Civil & Environmental Engineering

  4. Life Cycle of Schistosomiasis Source: http://www.payer.de/entwicklung/entw2039.gif Tufts University, Dept. of Civil & Environmental Engineering

  5. Long Term Project Objective • Decrease, if not eliminate, the incidence of schistosomiasis in Kwabeng, Ghana • Promote better management of water resources in Kwabeng • Assess the transportability of our approach to other affected communities Tufts University, Dept. of Civil & Environmental Engineering

  6. First Year Project Objectives • Research the nature and complexity of the problem • Establish baseline data for Kwabeng • Create relationships with community members • Design a matrix to determine the best possible solutions Tufts University, Dept. of Civil & Environmental Engineering

  7. Research Methods in Kwabeng • Gathered water data • Velocity, Temperature, pH, Dissolved Oxygen, Specific Conductivity Source: Rob Curry Tufts University, Dept. of Civil & Environmental Engineering

  8. Research Methods in Kwabeng • Identified presence of schistosomiasis in water and in children • Collected snails • Identified schistosomes in snails • Conducted school surveys to determine incidence of infection in children, along with river use habits Tufts University, Dept. of Civil & Environmental Engineering

  9. Snail and Velocity Correlation Tufts University, Dept. of Civil & Environmental Engineering

  10. Research Methods in Kwabeng • Met with community members and leaders • Gathered community acceptance and historical data for the town • Helped establish a committee to continue project efforts in Kwabeng Source: Katie Shuman Tufts University, Dept. of Civil & Environmental Engineering

  11. Research Methods in Kwabeng • Made maps of the before and after mining company changes • Used a GPS unit, measuring tape, and compass • Digitized the maps for use in GIS Tufts University, Dept. of Civil & Environmental Engineering

  12. Tufts University, Dept. of Civil & Environmental Engineering

  13. Tufts University, Dept. of Civil & Environmental Engineering

  14. Tufts University, Dept. of Civil & Environmental Engineering

  15. Tufts University, Dept. of Civil & Environmental Engineering

  16. Identifying Interventions • Identified three types of interventions • Reduce number of snails in the river • Prevent people from exposure to parasites • Reduce the population of parasites in snails Tufts University, Dept. of Civil & Environmental Engineering

  17. Selection Criteria • Cost • Relative cost taking into account capital cost and O & M • Feasibility • How possible the intervention technology is in Kwabeng • Access to equipment • Human health and safety concerns • Community Acceptance • How well the proposed solution resonates with the community • Cultural, political and economic implications Tufts University, Dept. of Civil & Environmental Engineering

  18. Selection Criteria Continued • Efficacy • Success rate in decreasing the incidence of schistosomiasis • Can the intervention stand alone • Has it been successful in other areas • Sustainability • Longevity of the intervention Tufts University, Dept. of Civil & Environmental Engineering

  19. Tufts University, Dept. of Civil & Environmental Engineering

  20. Numbering System • Cost: • 1 = most expensive 5 = least expensive • Feasibility: • 1 = least feasible 5 = most feasible • Community Acceptance: • 1 = not supported 5 = very supported • Efficacy: • 1 = not effective 5 = very effective at decreasing infection • Sustainability: • 1 = not sustainable 5 = indefinitely sustainable Tufts University, Dept. of Civil & Environmental Engineering

  21. All Possible Rated Interventions Tufts University, Dept. of Civil & Environmental Engineering

  22. Snail Control: Reducing the amount of snails in the river Tufts University, Dept. of Civil & Environmental Engineering

  23. Tufts University, Dept. of Civil & Environmental Engineering

  24. Biological Controls • Adding Terrestrial Plants for Shade • Shade reduces aquatic plant life in river, habitat of the snails • Competing land requirements from farmers near banks of river • Correlation between high shade and low/no snail population • Harvesting Aquatic Plants • High labor demand • Competing growth surfaces reduce efficacy • Continual removal of aquatic plants will lower biological productivity of river • Kwabeng community view option as drastic Source: http://www.kauai-vacation-rentals.com/shadesofgreen/100shades.htm Tufts University, Dept. of Civil & Environmental Engineering

  25. Biological Controls • Increase Snail Predator Population • Fishing of beneficial predators would limit snail reduction gains • Ecological equilibrium would require constant addition of fish to effectively reduce snail populations • Risk of unintended consequences of species introduction • Population monitoring costs high • Increase Direct Snail Competitors • Competitive species could be local foods (certain snail species) • Ecological equilibrium between species will require excessive competitor population Tufts University, Dept. of Civil & Environmental Engineering

  26. Chemical Controls • Herbicide • Ineffective long term solution • Risk to farmers who irrigate from river water • Town water supply impacted • Molluscicide • Requires 8 hour contact time with river • Temporary solution • If implemented incorrectly could increase chemical resistance of snails • Towns water supply impacted Tufts University, Dept. of Civil & Environmental Engineering

  27. Increasing the River Velocity • Increase slope channel • Effective, but impractical • Major earth moving needed • Water supply weir would need to be removed • Changes to the water supply system drastic • Reduce Cross-Sectional Area • Entire river would need width contraction – high expense • Maintenance against erosion could be high, with seasonal storm and flood events • Community skeptical of option Tufts University, Dept. of Civil & Environmental Engineering

  28. Increasing the River Velocity • Increase Input Through River Restoration • Rejoin the Awusu and the Abodusu Rivers • Partnership with Mining Co. necessary • Earth moving equipment in hands of Mining Co. • Experience in river alterations • Highly effective • Desired by many in community Source: Charline Han Tufts University, Dept. of Civil & Environmental Engineering

  29. Alternatives to Using the River Tufts University, Dept. of Civil & Environmental Engineering

  30. Public Showers • Construction, operation, and maintenance costs • Adults would be willing to pay a small fee, but children would have to be free. • Attendant needed for maintenance and up keep. • Need cooperation with Ghana Water Ltd. • Does not prevent river use • Must be coupled with other interventions Tufts University, Dept. of Civil & Environmental Engineering

  31. Public Wells • Construction, operation, and maintenance costs • Don’t know depth to water table • Small fee for usage (1-2¢) • Community is resistant to using wells because they are usually hand dug and the water does not come from the river • Does not prevent river use • Must be coupled with other interventions Source: Charline Han Tufts University, Dept. of Civil & Environmental Engineering

  32. Tufts University, Dept. of Civil & Environmental Engineering

  33. Public Taps • Construction, operation, and maintenance costs • Many taps already in town • Small fee for usage (1-2¢) • Does not prevent river use • Must be coupled with other interventions Tufts University, Dept. of Civil & Environmental Engineering

  34. Recreation Area • Construction cost and constructability. • Are supplies available in Ghana? • Will Children use it? • Does not prevent river use • Must be coupled with other interventions Tufts University, Dept. of Civil & Environmental Engineering

  35. Expand Household Distribution System • Implementation costs high as are recurring costs • Not everyone has a “house” • Requires cooperation of Ghana Water Ltd. • Does not prevent river use • Must be coupled with other interventions Tufts University, Dept. of Civil & Environmental Engineering

  36. Schistosome Control: Reducing parasite population in snails Tufts University, Dept. of Civil & Environmental Engineering

  37. Medical Treatment-Increase Staff for Existing School Visit Treatment System • Currently one nurse conducts school visits to evaluate children’s health • Students are required to self-assess illnesses • Town clinic run by Ghana Health Services, therefore requires cooperation • Community questions current system’s accountability and supports increased assistance • Long term monitoring needed Tufts University, Dept. of Civil & Environmental Engineering

  38. Medical Treatment-Monthly Free Schistosomiasis Screening and Drug Distribution Days • Salary of nurse, MDs, and lab techs • Cost of Praziquantel (most common drug used for treatment) • Reinfection rate a concern • Medication does not confer immunity • Reduces egg return to the river, thus breaking life cycle Tufts University, Dept. of Civil & Environmental Engineering

  39. Latrines - Reducing Egg Return to River from Humans • Construction, operation, and maintenance costs • Small income generated because adults would pay to use latrines • Latrines already exist in town and are not widely used because of their cost to the users • Finite life span, therefore lacks sustainability • Reduces egg return to the river, thus breaking life cycle Tufts University, Dept. of Civil & Environmental Engineering

  40. Town-wide Education Campaign • Two target populations: children and adults • Cost of educated health personnel • Behavioral changes are often difficult to implement and sustain • Constant reeducation necessary • Preventing schistosomiasis is not presently a priority in Kwabeng Source: Charline Han Tufts University, Dept. of Civil & Environmental Engineering

  41. No Action Alternative • Side effect of schistosomiasis is anemia, which makes people feel weak and decreases worker productivity • Community is invested in working with us to find a solution • Hypothesis that incidence rates on the rise Tufts University, Dept. of Civil & Environmental Engineering

  42. Conclusions and Recommendations • Top three interventions • Increase river velocity by river restoration • Town-wide education campaign • Monthly schistosomiasis screening and treatment days • Interventions can be used in conjunction with each other • Lower scoring interventions can be used to supplement main intervention Tufts University, Dept. of Civil & Environmental Engineering

  43. Future Work • Ongoing • Locate sources of funding • Identify international partners • Year 2 – In depth data collection on the recommended interventions and selection of the best intervention • Year 3 – Design of selected intervention • Year 4 – Implementation • Year 5 – Monitoring and evaluation Tufts University, Dept. of Civil & Environmental Engineering

  44. Acknowledgements • Professors John Durant and David Gute • Kwabena Kyei-Aboagye • Dr. Kwame Boadu • Kwabeng District Superintendent of Schools • Professor Manu, University of Ghana • Provost Bharucha • Tufts University Center for Children • Department of Civil and Environmental Engineering Tufts University, Dept. of Civil & Environmental Engineering

More Related