An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Off detector electronics status Vicente González Department of Electronic Engineering University of Valencia ATLAS Upgrade Week – Nov. 2010 - CERN

  2. Outline • Architecture baseline • R&D activities • Optical link card • GBT implementation • Xilinx • Altera • FPGA-DSP PU ATLAS Upgrade Week, 8 - 11 November 2010

  3. Architecture baseline LINKS WITH Front-End • One FE motherboard (12Ch) would be read-out by 12 GBT links. • 16 SNAP12 connectors for Slice. LINKS to ROS • Through backplane and a Transition Module with the standard defined by ROS. ROD PROCESSOR • Pipeline- Event buffer • Transmission to Pre-Processor • DQ check • Reconstruction PREPROCESSING • Pre-Processor in a different device (FPGA) with links to L1Calo. • InputStage – PreProc high speed links through the motherboard. ATLAS Upgrade Week, 8 - 11 November 2010

  4. Architecture baseline • The ROD Processing block may contain additional functionalities. In any case they should be placed either within the ROD PreProcessor or ROD-Processor. • High speed links for data reception • Gain selection • Pipeline L1A receptionEvent Buffer • CELL Energy computation ATLAS Upgrade Week, 8 - 11 November 2010

  5. R&D activities • July 2008 TileCal week • We defined 3 phases for our R&D for Upgrade (re-scheduled start 2010 due to funding) • Phase I: Technology analysis • Optical connectors and links, serdes (GBT, FPGA) • Data processing using FPGA with DSP units (Xilinx and Altera) • ATCA interface • Phase II: Design, implementation and test of custom PCBs of reduced ROD system functionalities with chosen technologies • Phase III: ROD prototypes ATLAS Upgrade Week, 8 - 11 November 2010

  6. Optical Link Card • Altera Stratix II GX based Mezzanine Card • 1 input SNAP12 connector • 1 output SNAP12 connector • 1 SFP I/O connector (2 Gbps) • Stratix II GX FPGA • Fully compatible connector • ROD PU • OMB ATLAS Upgrade Week, 8 - 11 November 2010

  7. Optical Link Card • Present status • Full electrical test completed: OK! • Optical test undergoing (standalone) • Firmware to test Stratix II GX transceivers • Internal loopback: • Use Built-In Self-Test with loopback configuration • BER Test • Physical loopback: • Implement PRBS7 & PRBS23 generator in OLC • Increase data rate 625, 1250, 2500, 3125 to 6250Mbps • BER Test • Loop and speed tests • GBT (already tested with development boards) ATLAS Upgrade Week, 8 - 11 November 2010

  8. Optical Link Card SMA • Bit Error Rate & Signal Integrity Test (Next week, Anritsu) • OLC-T (OLC Tester) • 4 layer (2 signal + 2 power plane) • 2 SNAP12 • 24 SMA connectors • 3.3V power supply • Next: integration in OMB and/or ROD • Still working: G-Link implementation in Stratix II GX • Problems with operation frequency in Stratix II • Tests: • Data injection from ROD/OMB • Data processing in FPGA • Future: Data from FE boards ? 3,3V MP1800 12x6.25Gbps OLC SNAP12 ATLAS Upgrade Week, 8 - 11 November 2010

  9. GBT implementation - Xilinx • GBT protocol studies in Xilinx Virtex 5/6 FPGAs • Instantiation on Virtex 5 (XC5VFX70T-1FFG1136) • Limit on 10 links • Most limiting parts • RS Decoder on FPGA Slices and LUT • DeMux on BRAM (optimized) • Ongoing work • BER tests • Instantiation studies on Virtex 6 • Work starting in LIP (Lisbon) ATLAS Upgrade Week, 8 - 11 November 2010

  10. GBT implementation - Altera • GBT protocol implementation studies in Stratix II and IV • Instantiation on Stratix II GX (EP2SGX90FF1508C3) • 12 transceivers with no problems • Ongoing work • GBT optimization studies ATLAS Upgrade Week, 8 - 11 November 2010

  11. GBT implementation - Altera • Stratix IV resource utilization – first results • We don’t expect problems in terms of resources • Next step: • Test compatibility Stratix IV- Stratix II O/F GBT communication ATLAS Upgrade Week, 8 - 11 November 2010

  12. FPGA-DSP PU • Evaluate the translation of DSP code from ROD PU to FPGA code • Current ROD uses mezzanine boards DSP based. • Design PU pin-to-pin compatible but FPGA based for ROD or OMB. • Goals • Gain experience and evaluate the limitations of FPGA. • Study the introduction of more advanced algorithm for Phase I Upgrade in TileCal RODs • Applicable to phase II upgrade. ATLAS Upgrade Week, 8 - 11 November 2010

  13. Conclusions • We have a first functional board to test optical I/O with SNAP12 connectors • Integrable in ROD and OMB • We have identified the limitations of GBT code • Max. Number of links in Xilinx and Altera • Expect to complete OLC card tests by end of year • Production of two more boards • Proceed with GBT tests in OLC begining 2011 • Integration with OMB and ROD • FPGA PU implementation to test algorithm translation • Upgrade Phase I anf Phase II ATLAS Upgrade Week, 8 - 11 November 2010

  14. Thank you for your attention ATLAS Upgrade Week, 8 - 11 November 2010

  15. Backup Slides ATLAS Upgrade Week, 8 - 11 November 2010

  16. ROD Functional blocks • Input Stage: • Data rate for a 12-PMT motherboard: 12pmt×2redundant×2gains ×12bits ×40MHz = 23.040 Gbs. ( ~12 GBT) – SANP12 • TileCal Slice: 154ch ~13 motherboards ~13 SNAP12 • The link structure will depend on the architecture and the protocol selected for the data transmission. • Pipeline and Derandomizer. • The pipeline length defined by the latency selected. • Implementation of pipelines in FPGA memories seems not to be a constraint for the different possibilities being discussed. • Trigger Preprocessor. • Pulse identification and feature extraction for the L1Calo system. • Link to L1Calo. • ROD Processor. • The ROD processor represents the present Read-Out Drives functionality. • Configuration and Control. • Standard for communication with the boards for configuration, monitoring, communication between boards. • The ATCA standard seems to be the natural replacement for present VME system although the final choice of the standard should be made on an ATLAS level. ATLAS Upgrade Week, 8 - 11 November 2010

  17. ROD Processor functionalities • Data synchronization  L1A, BCID, Ttype reception. • Dead-time / Busy logic. • Data reconstruction at L1 rate. • Energy, Phase, QF. • Optimal Filtering in DSP-like FPGA slices. • More sophisticated algorithms should be studied. • Energy Calibration to different Units. • Histogramming and Monitoring. • Data Quality check. • Level 2 trigger algorithms • MuTag, Total ET • Raw data (compression?) for offline reconstruction. • Communication with ROS. ATLAS Upgrade Week, 8 - 11 November 2010

  18. GBT resources in Virtex 5 ATLAS Upgrade Week, 8 - 11 November 2010

  19. GBT implementation - Altera • Stratix IV resource utilization – preliminary ATLAS Upgrade Week, 8 - 11 November 2010