1 / 7

Beam plan

Beam plan. Z. Fodor. Beam allocation in 2009 as known 14.4.2009. Start: 26.07.2009 8h Stop:15.11.2009 8h 15 days of running 3 days MD 25 days of running 3 days MD 18 days of running 7 days CREAM

willhampton
Download Presentation

Beam plan

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Beam plan Z. Fodor

  2. Beam allocation in 2009as known 14.4.2009 • Start: 26.07.2009 8h Stop:15.11.2009 8h • 15 days of running • 3 days MD • 25 days of running • 3 days MD • 18 days of running • 7 days CREAM • 3 days MD • 25 days of running • 3 days MD • 10 days of running 93 day for running /Total time not changed, but changed the MDs/

  3. 2M triggers in target • Trigger efficiency 0.5 • 25% for Empty target and calibrations •  5M ev/reaction • Beam setup for new energy 1 – 1.5 days •  8 days/reaction • CEDAR change 2-3 days

  4. Special runs for the calibrationsones per year • Geometry • TOF calibrations /?/

  5. Runs in the configurations • Beam quality • Composition, momentum /?/ • Trigger quality, normalization • Empty target /distributed in the full runtime/ • Beam • Target runs

  6. Topics and order (B) • Setup h-/158 ?? C W 9 days • T2K p/31 C W 6 days • MD 3 days /10-13 Aug./ • T2K p/31 C W 2 days 5M • T2K p/31 replica W 8 days 5M • T2K p/31 10 cm W 4 days 3M • Target change rep  LH 1 days • E scan p/30 LHT W 8 days 5M • E scan p/40 LHT W 2 days • MD 3 days /7-10 Sept./ • E scan p/40 LHT W 6 days 5M • E scan p/20 LHT W 8 days 5M • E scan p/10 LHT W 4 days • CREAM 7 days • MD 3 days /5-8 Oct./ • E scan p/10 LHT W 4 days 5M • Cedar and target change 2 days • Cosmic pi-/158 C N 8 days 5M • Cosmic pi-/350 C N 8 days 5M • E scan p/80 LHT N 3 days • MD 3 days /2-5 Nov./ • E scan p/80 LHT N 5 days 5M • E scan p/158 LHT N 5 days 2M

  7. 30 sec supercycle • 24*60*60 * 10/30 * 65 * 0.5  936 k/day • Could be in during the all weekends before LHC start /Sept.?/ • 36 sec supersycle • 24*60*60 * 10/36 * 65 * 0.5  780 k/day • Probably before LHC start up • 48 sec supersycle • 24*60*60 * 10/48 * 65 * 0.5  585 k/day • After LHC start We have 93 day for beam