1 / 3

CAD Model

CAD Model. Team 18. Specifications. Block D (Descent) - Propulsive only. Block E (Ascent). Inert mass fraction=0.2069 Initial mass=14.26 tons Final mass= 5.95 tons. Inert mass fraction=0.1923 Initial mass=Block D +Block E= 32.46 tons Mass final= 17.76 tons. Team 18. Estimated Cost.

waseem
Download Presentation

CAD Model

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CAD Model Team 18

  2. Specifications Block D (Descent) -Propulsive only Block E (Ascent) Inert mass fraction=0.2069 Initial mass=14.26 tons Final mass= 5.95 tons • Inert mass fraction=0.1923 • Initial mass=Block D +Block E= 32.46 tons • Mass final= 17.76 tons Team 18

  3. Estimated Cost • 9.45 tons equals our dry mass • 94.5 million dollars for our dry mass • Plus 1 billion dollars estimated for additional cost • Final estimated cost equals 1.094 billion dollars Team 18

More Related