1 / 8

First R esults of Thunderstorm Forecast Verification in Terminal Aerodrome Forecast s in Croatia

First R esults of Thunderstorm Forecast Verification in Terminal Aerodrome Forecast s in Croatia. Jadran Jurković and Igor Kos Croatia control Ltd, MET Division Croatian-USA Workshop on Mesometeorology 18-20 June 2012. Croatia Control Ltd. Introduction.

Download Presentation

First R esults of Thunderstorm Forecast Verification in Terminal Aerodrome Forecast s in Croatia

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. First Results of Thunderstorm Forecast Verification in Terminal Aerodrome Forecasts in Croatia Jadran Jurković and Igor Kos Croatia control Ltd, MET Division Croatian-USA Workshop on Mesometeorology 18-20 June 2012 Croatia Control Ltd.

  2. Introduction • Part of Quality management system (ICAO Annex 3) • Forecasts Improvement • Understand correct, miss, false alarm events • Verification of special problems • Convection (TS) • Fog (reduced visibility) • Wind (especially bora events) • Thunderstorm (TS) • Mesoscale phenomenon (deep and moist convection) • Month with max. frequency of days with TS has 12-25% • Impact on aviation First Results of Thunderstorms Forecast Verification in TAF in CroatiaCroatian-USA Workshop on Mesometeorology 18-20 June 2012 Croatia Control Ltd.

  3. Verification- a larger view = ≠ REAL STATE OF ATMOSPHERE FORECASTER’S PICTURE WEATHER FORECAST OBSERVED WEATHER • TAF(T=9/24 ∀3/6h) • Surface wind • Direction • Speed • Gusts • Visibility • Present weather • Cloud • Amount • Height of cloud base • [TCU/CB] Change groups -BECMG -FROM -TEMPO -PROBABILITY 30/40 • TAF • Surface wind • Direction • Speed • Gusts • Visibility • Present weather • Cloud • Amount • Height of cloud base • [TCU/CB] Change groups -BECMG -FROM -TEMPO -PROBABILITY 30/40 • METAR • Surface wind • Direction • Speed • Gusts • Visibility • Runway visual range (RVR) • Present weather • Cloud • Amount • Height of cloud base • [TCU/CB] • T i Td • Atmospheric pressure • Recent weather • Wind shear • State of the runway • Trend forecast • METAR (∀30min) • Surface wind • Direction • Speed • Gusts • Visibility • Runway visual range (RVR) • Present weather • Cloud • Amount • Height of cloud base • [TCU/CB] • T i Td • Atmospheric pressure • Recent weather • Wind shear • State of the runway • Trend forecast • Input • Forecaster • skill, experience, education • Available toolsand materials • Models • quality, interpretation, availability • Observation system • Climatology • Technical details • Criteria for weather elements, format • System supervision • Education system • Customer requirements VERIFICATION First Results of Thunderstorms Forecast Verification in TAF in CroatiaCroatian-USA Workshop on Mesometeorology 18-20 June 2012 Croatia Control Ltd.

  4. Approach • Method similar to Austrocrontrol’s Mahringer (2008) • TAF, two basic principles • forecast for time periods • contains a range of forecast conditions • Each hour • Example for TS TAF LDSP 230500Z 2306/2406 11010KT 9999 FEW050 TEMPO 2308/2320 RA PROB30 TEMPO 2310/2406 TSRA FEW030CB BKN040 BECMG 2311/2313 18012KT BECMG 2316/2318 VRB02KT= First Results of Thunderstorms Forecast Verification in TAF in CroatiaCroatian-USA Workshop on Mesometeorology 18-20 June 2012 Croatia Control Ltd.

  5. Data • Forecasts for 6 airport in Croatia • Inland: Zagreb (LDZA), Osijek (LDOS) • Onshore: Pula (LDPL), Zadar (LDZD), Split (LDSP), Dubrovnik (LDDU) • Period 2009-2011 • ~500,000 forecasted hours • Contingency tables for each airport First Results of Thunderstorms Forecast Verification in TAF in CroatiaCroatian-USA Workshop on Mesometeorology 18-20 June 2012 Croatia Control Ltd.

  6. Results • Bias • Proportion correct (PC) First Results of Thunderstorms Forecast Verification in TAF in CroatiaCroatian-USA Workshop on Mesometeorology 18-20 June 2012 Croatia Control Ltd.

  7. Results • PC - better for inland airports and LDPL • Climatology • Bias similar results • LDPL smallest bias-local characteristics First Results of Thunderstorms Forecast Verification in TAF in CroatiaCroatian-USA Workshop on Mesometeorology 18-20 June 2012 Croatia Control Ltd.

  8. Conclusions • Verification has been initiated • Frequency of hours with TS ~1-1.5% • Better scores when forecast TS period is shorter • Less bias at inland airports due to pronounced daily and yearly maxima • Localfeatures • Future work (in progress): • Details for every miss and false alarm event • Synoptic situations • Lead time and duration THANK YOU jadran.jurkovic@crocontrol.hr, igor.kos@crocontrol.hr Acknowledgement to Ms. Laurette Rako for helping with translation First Results of Thunderstorms Forecast Verification in TAF in CroatiaCroatian-USA Workshop on Mesometeorology 18-20 June 2012 Croatia Control Ltd.

More Related