1 / 19

Requirements of AIC J. Zmeskal Stefan-Meyer-Institut für subatomare Physik Vienna, Austria

Requirements of AIC J. Zmeskal Stefan-Meyer-Institut für subatomare Physik Vienna, Austria for the Antiproton Ion Collider Collaboration. AIC concept. Measurement of neutron and proton distribution of stable and unstable nuclei, with a new novel method:

vlad
Download Presentation

Requirements of AIC J. Zmeskal Stefan-Meyer-Institut für subatomare Physik Vienna, Austria

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Requirements of AIC J. Zmeskal Stefan-Meyer-Institut für subatomare Physik Vienna, Austria for the Antiproton Ion Collider Collaboration GSI, Dec.3, 2007 PBAR @ FAIR Workshop

  2. AIC concept • Measurement of neutron and proton distribution of stable and unstable nuclei, • with a new novel method: • medium energy antiproton absorption • in a collider mode. This method will allow an independent measurement of proton and neutron radii within the same experiment. GSI, Dec.3, 2007 PBAR @ FAIR Workshop

  3. Collection and deceleration of Antiprotons in CR/RESR • Antiprotons collected in CR: ~ 109 • Stochastic and electron cooling • in RESR form 3 GeV down to 30 MeV • Extraction of antiprotons into E(A)R, • new beam transfer line GSI, Dec.3, 2007 PBAR @ FAIR Workshop

  4. Collection and deceleration of Antiprotons RESR Former ESR e-cooler from production targets CR to NESR/E(A)R GSI, Dec.3, 2007 PBAR @ FAIR Workshop

  5. Antiproton beam parameters • injected antiprotons into CR/RESR: • energy 3 GeV • transvers emittance 5  mm.mrad • momentum spread p ~10-3 • after decelerating and cooling in RESR: • energy 30 MeV • transvers emittance < 2  mm.mrad • momentum spread p ~5.10-5 GSI, Dec.3, 2007 PBAR @ FAIR Workshop

  6. Time evolution of the longitudinal momentum spread of the antiproton beam in the RESR (for 30 MeV pbars) GSI, Dec.3, 2007 PBAR @ FAIR Workshop

  7. GSI, Dec.3, 2007 PBAR @ FAIR Workshop

  8. Antiproton Ion Collider to FLAIR Space for 70 kV electron cooler E(A)R from RESR antiproton transfer line NESR GSI, Dec.3, 2007 PBAR @ FAIR Workshop

  9. Operational sequences Prepare facility for pbar production (5 min) Acceleration of Primary Beam Production and Separation of Secondary Beam Cooling and Accumulation Deceleration in RESR Transfer to E(A)R Prepare facility for RIB production (5 min) Acceleration of Primary Beam Production and Separation of Secondary Beam Cooling and Deceleration Accumulation in NESR Perform AIC Experiment GSI, Dec.3, 2007 PBAR @ FAIR Workshop

  10. COLLIDER Ion optical layout of E(A)R and injection line for AIC Ion optical layout of the interaction region for AIC Beam dynamics simulations Study of Antideuteron production and storage Work packages (I) GSI, Dec.3, 2007 PBAR @ FAIR Workshop

  11. New concept for interaction region (BINP)

  12. New design reports by BINP in 2006/7 Conceptual Design of the Electron-Nucleus and Antiproton-Nucleus Scattering Facility for FAIR project. I.A.Koop, P.V.Logatchov, A.V.Otboev, V.V.Parkhomchuk,V.M.Pavlov, E.A.Perevedentsev, D.N.Shatilov, P.Yu.Shatunov, Yu.M.Shatunov, A.N.Skrinsky, A.A.Valishev. Budker Institue of Nuclear Physics, Novosibirsk, Russia. 2006 The revision of the Interaction Point region in NESR and EAR Petr Shatunov BINP, Novosibirsk, July 2007 Further BINP studies planned for 2007/2008

  13. SCHOTTKY Development of new fast Schottky detection method to follow uncooled ions and use their cooling behavior to extract momentum information Design and prototyping of LN2 cooled pickups, multiple pickups, high. frequency pickups Development of new data analyis methods and DAQ Work Packages (II) GSI, Dec.3, 2007 PBAR @ FAIR Workshop

  14. Work Packages (III) • DETECTORS • Extensive simulations of reaction dynamics • Design and prototyping of luminosity detectors • Design and prototyping of recoil detectors • Design and prototyping of pion detectors GSI, Dec.3, 2007 PBAR @ FAIR Workshop

  15. Support of Design work by BINP through GSI TU Munich and SMI Vienna Towards technical layout of the EAR and interaction zone DFG application for theoretical investigations (H. Lenske, Giessen) and simulations (R. Krücken, TUM): Antiproton-Nucleon and Antiproton-Nucleus interaction in free space and in the nuclear medium Event-generator and full scale experiment simulation Next steps GSI, Dec.3, 2007 PBAR @ FAIR Workshop

  16. AIC - Requirments • beam time per year: 2-3 weeks • Antiprotons for AIC: • number of stored pbars at E(A)R: 109 • filling cycle of E(A)R: 3-5 per day • Antiproton beam parameters: • final momentum spread: 5.10-5 • final transverse beam emittance: < 0.02  mm mrad GSI, Dec.3, 2007 PBAR @ FAIR Workshop

  17. THANKS GSI, Dec.3, 2007 PBAR @ FAIR Workshop

  18. GSI, Dec.3, 2007 PBAR @ FAIR Workshop

  19. pbars to CR RIB to CR E(A)R CR/RESR NESR GSI, Dec.3, 2007 PBAR @ FAIR Workshop

More Related