An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. API TR PER15K Report Impact on SC 6 Documents by Kenneth Young PER15K Report - SC6 Meeting 6/30/2010

  2. Scope of Work • Address the issues on the API TR PER15K requirements and bring plan to SC6 on recommended changes to related documents • HPHT Equipment: • Completion and Well Control Equipment • All equipment exposed to HPHT environment • Pressure rating > 15,000 psi or • Temperature rating > 350°F • Pressures and temperatures at seafloor PER15K Report - SC6 Meeting 6/30/2010

  3. Activity • Meeting held ??/??/2010 at Stress Engineering Services in Houston • Attendees: • Sterling Lewis – ExxonMobil • Kris Ohman – Shell • Kenneth Young – Stress Engineering Services • Austin Freeman – Halliburton • John McCaskill – Expro Group • Joel Russo – FMC • David Zollo – FMC • Mahesha Udipi - PER15K Report - SC6 Meeting 6/30/2010

  4. Status • MMS issued 30 CFR 250.807 on 1/11/2010 • Additional requirements for equipment installed in HPHT environments • MMS is drafting an NTL outlining the alternative compliance procedure necessary for MMS approval of HPHT permits • API TR PER15K • Draft technical report issued 5/?/2010 for ballot and comments • Document focuses on evaluation process for HPHT equipment • Design verification analysis • Design validation testing • Materials selection considerations • Manufacturing process controls PER15K Report - SC6 Meeting 6/30/2010

  5. Functional Design Specification • User should provide a Functional Design Specification • Environmental conditions • Temperature, exposed fluids, corrosion/erosion, operational environment • Loads and characteristics • Pressures, temperatures, internal loads, external loads, thermal gradients, temporary conditions, cyclic loading, combined loading, and system analysis and integration • Life cycle requirements • Applicable industry standards PER15K Report - SC6 Meeting 6/30/2010

  6. Technical Design Specification • Manufacturer document Technical Design Specification • Confirms design meets the Functional Design Specification • Environmental conditions • Loads and characteristics • Life cycle requirements • System analysis • Industry standards / regulatory requirements • Design verification analysis • Design validation testing • Manufacturing process specification • Fit-for-service basis • After market activities PER15K Report - SC6 Meeting 6/30/2010

  7. Gap Analysis • API TR PER15K • Is a technical report, thus has no requirements • 30 CFR 250.807 • Must demonstrate equipment is capable of performing in the applicable HPHT environment • Include design verification analysis • Include design validation testing PER15K Report - SC6 Meeting 6/30/2010

  8. Gap Analysis • NTL Draft 3/29/2010 • Material mechanical properties per ASME Div 3 KM-2 • Increased material toughness • Design verification • Elastic-plastic analysis per ASME Div 2 Part 5 • Fatigue analysis per ASME Div 3 • Design Validation • Hydro test per ASME Div 2, Part 8 • Construction • NDE per ASME Div 3, KE-3 • Monitoring of Loads PER15K Report - SC6 Meeting 6/30/2010

  9. Gap Analysis – API Spec 6A • No requirement for User’s Function Design Specification • Pressure rating [4.2.1] • Need higher pressure ratings – 25 ksi and 30 ksi • What pressure increments? 5 ksi increments??? • External loads are not addressed [4.2.1.3] • Need to address system loads • Temperature rating [4.2.2] • Need higher temperature ratings – currently 250°F max • What temperature increments? PER15K Report - SC6 Meeting 6/30/2010

  10. Gap Analysis – API Spec 6A • Exposed Fluid • API partially addresses environment through Material Class [4.2.3] and Annex A • Must comply with NACE MR0175 / ISO 15156 • Service Life • System Analysis PER15K Report - SC6 Meeting 6/30/2010

  11. Gap Analysis – API Spec 6A • Design Methods [4.3] • API 6A currently uses ASME Sect VIII (2004) Elastic Analysis • API 6A does not require a fatigue analysis • Fatigue beyond scope of current document • MMS NTL Requirements • ASME Sect VIII, Div 2, Part 5 – elastic-plastic analysis with design margin based upon plastic collapse (structural instability) • ASME Sect VIII, Div 3 – fatigue life analysis PER15K Report - SC6 Meeting 6/30/2010

  12. Gap Analysis – API Spec 6A • Closure Bolting [4.3.4] • API 6A Sallow = 0.83 Sy at hydro test pressure • ASME Div 3 Sallow = 0.55 Sy all working loads • ASME Div 2 Sallow = 0.25 Sy all working loads • Material Toughness [5.4.1] • API 6A CVN ≥ 20 ft-lb avg • ASME Div 3 CVN ≥ 30 ft-lb avg + KIc as specified • QTC [5.7] • API 6A part thickness but not required to exceed 5” ER • ASME Div 3 equal to min forged Q&T thickness PER15K Report - SC6 Meeting 6/30/2010

  13. Gap Analysis – API Spec 6A • Surface NDE [7.4.2.2.8 and 7.4.2.2.9] • Ferromagnetic materials • API 6A and ASME Div 3 are the same if t ≥ 2 in. • Non-ferromagnetic materials • API 6A and ASME Div 3 are the same if t ≥ 2 in. • ASME requires < 10 rounded indications in 6 in.2 area • Volumetric NDE [7.4.2.3.15] PER15K Report - SC6 Meeting 6/30/2010

  14. Recommendations • Affect on other SC6 documents will follow lead of 6A • SC6, SC16, and SC17 form a collective Task Group to address this issue • Options: • Separate Spec or RP for HPHT equipment • Annex for 6A for HPHT equipment • Including additional inputs, verifications requirements, validation requirements unique to 6A equipment • Address load monitoring and re-inspection requirements • Need agreement on single “best” method to accomplish all the objectives PER15K Report - SC6 Meeting 6/30/2010