Multi function phased array radar mpar
Download
1 / 8

Multi-function Phased Array Radar (MPAR) - PowerPoint PPT Presentation


  • 129 Views
  • Uploaded on
  • Presentation posted in: General

Multi-function Phased Array Radar (MPAR). Concept of Operations (CONOPS) Status. Accomplishments. Working Group convened on 24 July at Silver Spring Validated/Refined CONOPS Purpose Established document outline Tailored from FAA’s SEM

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha

Download Presentation

Multi-function Phased Array Radar (MPAR)

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Multi-function Phased Array Radar (MPAR)

Concept of Operations (CONOPS) Status


Accomplishments

  • Working Group convened on 24 July at Silver Spring

  • Validated/Refined CONOPS Purpose

  • Established document outline

    • Tailored from FAA’s SEM

  • Identified Scope (system verses agency service provider)

  • Defined contents of Sections/Subsections

  • Began assigning authors and writing sections/subsections


CONOPS Purpose

  • Internal

    • Guide for phased array radar R&D

    • Tool to request funding for R&D

    • Provides framework for the development and/or validation of future system requirements, architecture, and performance

  • External

    • Tool to spread phased array technology awareness to potential stakeholders/users

    • Tool to establish agency/industry partnership in the establishment of an R&D program


Outline/Content/Scope - Decisions

  • Document will be bound by the system interfaces (i.e., subsystems and internal/external interfaces)

    • Concept will discuss data/products that are produced and disseminated from the system and the input controls

    • Generic references will be made to End-users/Service Providers, however, details will be provided in addendums as required at a later date.

  • Attempt will be made to make the document non-system specific where possible. However, to extol the benefits of the technology, it will sometimes be necessary to talk specifics

  • “Living” document that will be modified to support the program phase


CONOPS Scope

Extended Scope

Other Agency

Enterprise

Services

Data Processing

Systems

Data Processing

Systems

Decision Support

Tools

Radar Control,

Logic & Processing

SWIM

GIG

Enterprise

Services

Decision Support

Tools

Data Processing

Systems

Decision Support

Tools

Automation System

(ADS-B Track correl.)

Numerical Weather

Prediction

Data Assimilation

Decision Support

Tools

Decision Support

Tools

Decision Support

Tools


Issues/Questions

  • Limited resource availability within working group

  • Funding – available to support CONOPS development (e.g., SMEs)?

  • Effort is larger than originally planned (CONOPS effort for system of this scale can require 5-10 people for a year)

  • Function allocation unknown (e.g., will the system be required to track cruise missiles or detect wake vortices)


Plans

  • Continue assignment of subsections

  • Continue populating subsection

  • Identify resource needs (e.g., SMEs) and authors

  • Continue developing operational scenarios

  • Schedule next Working Group meeting (November?)


Schedule

  • Document

    Working Draft - October 2007

    Preliminary – January 2007

    Final - ?

  • Working Group Meeting

    • October/November 207


ad
  • Login