Alpha Magnetic Spectrometer-02 ISS Digital Data Recording System (DDRS)

Alpha Magnetic Spectrometer-02 ISS Digital Data Recording System (DDRS) ISS DDRS Project / ESCG Team. Agenda. Background Objectives Description Interface Diagram. BACKGROUND. From: http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/archives/sts-91.html

truman
Download Presentation

Alpha Magnetic Spectrometer-02 ISS Digital Data Recording System (DDRS)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Alpha Magnetic Spectrometer-02 ISS Digital Data Recording System (DDRS) ISS DDRS Project / ESCG Team

  2. Agenda • Background • Objectives • Description • Interface Diagram ESCG

  3. BACKGROUND From: http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/archives/sts-91.html • The Alpha Magnetic Spectrometer (AMS) flew for the first time on STS-91and was powered up on Flight Day 1. • Data originally planned to be sent to ground stations through Discovery's KU-band communications system was recorded onboard because of a problem with the KU-band system. • Data that could not be recorded by ground stations was recorded onboard throughout the mission. • Less than <5% of the AMS-1 data made it to the ground by S-Band. • On the last STS mission, Shuttle Ku Band was out of commission. ESCG

  4. OBJECTIVES • Nominally: Provide a recording of the science data as close to the source as possible. • Contingency: Provide a means for the ISS crew to observe operational data of AMS-02. • Contingency: Provide a means for the ISS crew to command the AMS-02 payload. • ISS DDRS command path to AMS-02 is via High Rate Data Link. In the event ISS data systems or ground commanding are unavailable AMS-02 can be completely operated from this alternate interface. ESCG

  5. AMS-02 ISS DDRSDescription • ISS Digital Data Recording System description: • Based on a NASA provided T61p ISS laptop, dedicated for AMS use • Would provide primary on-board data recording (24/7) • Would provide play-back capability to downlink lost or corrupted data • Uses ISSLAN Joint Station Lan (JSL) connection • Crew hard-disk change-out minimized by over-writing data on the AMS disk once it is verified on the ground - only used to prolong H/D life. • Ensures data integrality if the event of ISS data systems and/or payload outages. • Allows for contingency crew monitor of payload status and contingency crew commanding of payload systems via “Fn” keystrokes, based upon procedures, flight notes or A-to-G voice-loop. • AMS02 ISS DDRS is a CB / STS-134 crew request. ESCG

  6. EXPRESS RACK 6 AMS-02 ISS DDRS Interfaces Enhanced A31p 16V DC Power Cable SEG33116459-301 DC Power 28V DC Cable Assembly SEG39129264-305 PS28 Cable Assembly SEG33114659-301 A31p 28V DC Power Supply SEG33116428-301 PS28 Junction Box SEG33114658-301 MDL 3 J1 - 28VDC 16 VDC Power (P1) J4 J5 J2 J1 P1 P1 P2 P2 P2 P1 P2 P1 28 VDC, 20 AMP Adaptor Cable Assy SEG33112598-301 PS28 Power Strip Assembly SEG33114657-301 MDL 3 P1 AMS Network Cable SEG39138002-801 (Length: 9 ft) Alternate length: 40 ft; SEG39138002-802) RJ45 - Network J2 – DATA (Network) AMS Hard Drive Adapter SEG33120741-301 AMS Network Jack Assembly SEG39137984-301 AMS Hard Drive SEG39137974-801 P1 P1 P2 AMS Transmitter Adapter SEG39136090-301 AMS USB Cable SEG39137981-801 USB USB Tx UIP Nominal configuration: AMS HRDL Cable SEG39136091-301 (Length: 8 ft) P7 J7 - HRDL AMS LAPTOP SEG33120761-301 Alternate configurations; not part of AMS Cable Kit: AMS Short Extension Cable SEG39138001-301 (Length: 6 ft) AMS Long Extension Cable SEG39138001-302 (Length: 40 ft) P1 P2 P2 AMS Receiver Adapter SEG39136090-302 AMS USB Cable SEG39137981-801 USB USB Rx Desk Top Plate Assembly SED33108703-304 Multi Use Bracket Assembly SEG33107631-301 AMS Cable Kit SEG39137975-301 Location Assumption: MDL 3, Locker 8, Drawer 2, Seat track AMS-02 ISS DDRS INTERFACES Part Names reflect OpNom RED = Assumptions or To Be Determined Blue = AMS-02 ISS DDRS Project deliverables ESCG

  7. BACKUP SLIDES ESCG

  8. ISS DDRSInstallation Concept ESCG

  9. ISS DDRSInstallation Concept SEG33116459-301 SEG33120761-301 SEG39138002-301 9 ft SEG39136090-301 / -302 SEG33112598-301 SEG39137981-801 (2X) 3ft SEG33107631-301 and SED33108703-304 SEG39136091-301 6ft SEG33114659-301 SEG39129264-305 SEG33116428-301 SEG33114658-301 ESCG

  10. Documentation Updates • G5787B - T61p GCAR • add new components: alternate HDDs, cables, adapters. • CRCP to provide checklist to T61 Interface • JSC 64268 - T61p PTRS – no changes • JSC 64267 - T61p IRD – no changes; Memo documenting how ISS DDRS HW meets Section 4. • MATL-08-016-USA_R1 - Materials Analysis – update to apply to new HDDs & Cables ESCG

  11. AMS-02 ISS DDRS Requested Certification Hardware ESCG

  12. AMS-02 ISS DDRS GFE Provided Parts/Materials ESCG

  13. Deliverables: Hard Drive Assumptions • AMS Hard Drive (SEG39137974) (7 of -801; 3 of -802) • COTS; 500GB or more • Acceptable alternate to (160 GB) SEG33120738-301 • Conformal coating to protect exposed circuitry on AMS drives • Compatible with Windows XP, AMS software • Compatible with SKG33120762 Firmware/Bios Configuration • Certification by similarity: EMI; no vibe, no thermal • Ionizing Radiation testing – Engineering eval only (Preferred HD + 2 alternate HDs) • GCAR functional testing: with T61p at SCTFlab • TPS: Sharp edges, burrs, labeling, cleanliness • AMS data & S/W is stand-alone and not part of the HD cert effort ESCG

  14. AMS-02 ISS DDRS - Certification Certification Approach: • Modify existing T61p laptop Government Certification Acceptance Request: • Existing T61p GCAR is Criticality (Crit) 1 • AMS-02 ISS DDRS added to T61p GCAR as Crit 3 H/W and Crit 3 function • AMS-02 ISS DDRS delivered per AMS process: DD-250 and JR-1027 ADP • Testing: • EMI testing: (ISS levels: emissions and susceptibility) • USB Adapters • HDD may be by similarity, memo • Ionizing radiation susceptibility – mission success - engineering eval testing only • Early engineering evaluation functional at SCTF SVF • Interface Verification Testing @ KSC test-bed with AMS Payload • Analysis • Materials analysis memo (flammability, out-gassing, toxicity) ESCG

  15. ISS DDRS Design Statususb/HRDL Adapters SEG39136090-301 / -302 • Purpose: Converts HRDL fiber signal to USB (one each transmit and receive). • Design: Aluminum extruded housing, conformal coated PCB. • Materials: IVA compatibility assessment to be performed. Labels will differentiate Transmitter & Receiver ST Fiber Connector USB Connector ESCG

  16. ACRONYMS ESCG