Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


2. 2 Topics Turbine Blading & Steam Path Upgrades Turbine Stop / Control Valve Upgrades Turbine Control System Modernization Generator Improvements

3. 3 Steam Path Improvements More than 20 units in plan for upgrade Efficiency gain Aerodynamic blade profiles Improved inter-stage sealing Reduction of sidewall secondary flow losses Reduction in future O&M costs Extend time between overhauls Reduction of solid particle erosion damage Less coal burned

4. 4 Glen Lyn 6 Series 235MW (GE) HP/IP Nine (9) Units (Subcritical, 1957 - 1961) Integral control valve chest girth weld creep Purchased complete spare in 1990 Exchanged on other 8 units (1991 – 2004) New rotors – replaced “C” grade materials New nozzles, diaphragms (Rows 1,9,10,12) Reassemble non-outage; 4-week reduction Cost = $8 Million (US) first unit installed, approx. Cost = $4 Million (US) subsequent units, approx.

5. 5

6. 6 Glen Lyn 6 Series 235MW (GE) HP/IP Results Restored CV chest with improved girth weld Improved HP efficiency by 1.5% - 2.0% 2.5 MW and 35.28 kcal/kWh (140 Btu/kWh) gain Erosion minimized, reduced repairs Extended inspection intervals to 10-11 years Re-inspections begun in 2001 confirm benefit

7. 7 1300 MW Series (Alstom) HP Six (6) Units (Supercritical, 1973 – 1989) Use of spare rotor/inner casing assembly Replaced all stationary/rotating rows (28) Reuse rotor and re-round inner casing Modified seal strips for steam swirl stability Cost = $6 Million (US) per unit installed, approx. Results Blading Efficiency > 92.0%, increase of 4.7% 20 MW and 28.5 kcal/kWh (113Btu/kWh) Improved rotor stability against steam swirl 3 Units completed - - 1 with premature degradation

8. 8 600,800 MW Series (GE) HP/IP Eight (8) Units (Supercritical, 1967 – 1972) To date, four have been converted New nozzles, diaphragms, seals Reblade spare rotor; reuse shells Cost = $6.5 Million (US) per unit installed, approx. Results 82.8% - 86.3% HP section efficiency 11MW gained on 800MW Series 600 MW Series HP fell short of expectations by up to 3.5% due to overstated recoverable losses by OEM.

9. 9 Effect of Advanced Design Steam Path

10. 10 Big Sandy Unit 1 HP-IP/SFLP One (1) unit, W design (Subcritical, 1963) HP turbine complete and IP/SFLP turbine rotor and inner casing – install 2008 Inefficient original design Internal components subjected to erosion and distortion Creep damage evident No spare blade rings or rotors

11. 11 Original Design Issues Efficiency

12. 12 Existing Maintenance Issues Reliability

13. 13 New HP Section Design

14. 14 New IP/LP Section Design

15. 15 Big Sandy Unit 1 Expectations Anticipated Results Improved reliability and design efficiency HP efficiency +4.1% to 88.9% IP efficiency +3.1% to 94.6% Expect +18 MW at original design steam flow Includes replacement throttle/governor valves Installed cost $18Million (US), approx.

16. 16 LP Turbine Performance Retrofits AEP experience driven by reliability issues Stress Corrosion Cracking on blades, disks and Low Cycle Fatigue on blade attachments Flow limit for L-1 rotating blade causes curtailment LP turbine exhaust limit = 140 mm HgA (5.5 in HgA) Frequently caused summer time curtailments Solution = LP Turbine Upgrade

17. 17 LP Turbine Performance Retrofits Four (4) BB73 W LP steam paths “ruggedized” Improved material properties to resist SCC and LCF Aerodynamic improvements to blades and inlet / exhaust flow guides Improved seal design to reduce leakage Full load capable to 203 mm HgA (8 in HgA) backpressure Improved performance: 3.4MW, 22.4 kcal/kWh (89 Btu/kWh)

18. 18 Stop/Control Valve Upgrades Material Damage Thermal fatigue, creep Reliability Tight shutoff, leaks Maintenance Weld repair to valve body, seats, bolt holes Design Improvement Improve O&M Reduce pressure drop

19. 19 1300 MW Series SV/CV Upgrades Original Design Pressure drop across combined valves = 5.1% Limited steam flow at VWO + 5% overpressure Significant solid particle erosion damage Expensive repairs performed every 2-3 years

20. 20

21. 21

22. 22 1300 MW Series SV/CV Upgrades New Design Separate stop and control valve chambers Actual pressure drop across valves = 2.08% Achieved 32 MW increased generation capability without changing boiler conditions Updating valve actuators to digital controls

23. 23 Turbine Control System Upgrades Converting original MH and analog EH controls to digital Integrated into plant Distributed Control System Reuse or modify hydraulic systems Use fire resistant fluids Expectations Enhanced control Fewer unit trips Faster startup/ramp rates Online testing of turbine valves and protective devices

24. 24 Turbine Control System Upgrades Results Smooth, rapid rollups to synchronous speed CV position and load ramping optimized by stress probe CV stroke ramped according to test throttle pressure Improved reliability during protective device checks Lower peak speeds reached during turbine trip Reduction in boiler tube leaks due to “soft” trips All contribute to improved reliability and performance

25. 25 Generator Improvements Inspection Intervals (typical) Field in-place ( 5 years) Field removed (10 years) Perform routine cleaning, testing, repairs Goal: Achieve high reliability through design life of insulation systems

26. 26 Generator Rewinds Rewinds Offer Opportunity for Improvement Required for reliability and maintenance purposes Efficiency improvements are small added benefit Stator Windings Asphalt stator bar insulation replaced with modern epoxy-mica insulation Potential for increased copper cross-section in original slots Improved cooling gas or water flows reduce operating temperature and extend design life Stator Cores Inspect and test for looseness, hot spots, resonance Several cores replaced (full, partial) Reference papers available in Breakout Session

27. 27 Generator Rewinds Fields Replace retaining rings with 18Mn 18Cr material Improve end turn blocking design and materials Restore/replace copper and replace all insulation Optimize cooling gas flow

28. 28 Summary AEP has been retrofitting turbine generator equipment with efficiency improvements for more than 15 years. Experience with OEM and non-OEM solutions. Economic benefit drives the HP and IP turbine retrofits. Must consider design improvement vs. restoration improvement. Turbine valve design could provide upgrade potential. Turbine control integration can produce thermal benefits. Reliability benefit drives the LP turbine and generator retrofits (typically). Some small efficiency improvements are possible.

29. 29 Breakout Session Two Sessions on Tuesday Afternoon Expert Attendees Steve Molick – Turbine Services Manager Jim Michalec – Staff Engineer, Generators Alex Manukian – Sr. Engineer, Turbines Jim Cable – Sr. Engineer, Turbines, Controls Dan Sculley – TG&PSE Manager

30. 30 Questions