1 / 3

INSPECCIÓN PLAN DE ASFALTADO

INSPECCIÓN PLAN DE ASFALTADO PARROQUIA EL VALLE DESDE LA CALLE 1, DE MC DONALDS HASTA LA CALLE 16, IGLESIA ANTES DEL PUENTE VIERNES 11/03/2011 9:30 P. M. PLAN DE ASFALTADO DE LOS CORREDORES VIALES DEL DISTRITO CAPITAL. METAS 2011 Cobertura: 32 Avenidas 120 Kms.

thimba
Download Presentation

INSPECCIÓN PLAN DE ASFALTADO

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. INSPECCIÓN PLAN DE ASFALTADO PARROQUIA EL VALLE DESDE LA CALLE 1, DE MC DONALDS HASTA LA CALLE 16, IGLESIA ANTES DEL PUENTE VIERNES 11/03/2011 9:30 P. M.

  2. PLAN DE ASFALTADO DE LOS CORREDORES VIALES DEL DISTRITO CAPITAL METAS 2011 Cobertura: 32 Avenidas 120 Kms. Inversión: Bs. 47.376.915,00 Toneladas de asfalto: 60.000 Ton. Cantidad de Baches: 8.000 Baches Bocas de Visita Niveladas: 1200 Bocas de Visita AVANCES 2011 15.000 Toneladas de asfalto con 9 cuadrillas 1950 Baches 180 Bocas de Visita Niveladas

  3. PLAN DE ASFALTADO DE LOS CORREDORES VIALES DEL DISTRITO CAPITAL 11/03/2011 PARROQUIA EL PARAÍSO: CALLE G DE VISTA ALEGRE, ESCARIFICADO, HORA DE INICIO 6:30PM PARROQUIA EL RECREO:CALLE SANTIAGO DE CHILE, CALLE BUENOS AIRES, CALLE RIO DE JANEIRO Y CALLE LOS GERANIOS , COLOCACIÓN DE 410 TON DE ASFALTO, HORA DE INICIO 11:00AM PARROQUIA EL VALLE: DESDE LA CALLE 1, DE MC DONALDS HASTA LA CALLE 16, IGLESIA ANTES DEL PUENTE, COLOCACIÓN DE 310 TON DE ASFALTO, PINTURA DE POSTES Y BROCALES, DEMARCACIÓN VIAL, HORA DE INICIO 9:30PM PARROQUIA SAN PEDRO:FRENTE A LA PLAZA LAS TRES GRACIAS COLOCACIÓN DE 120 TON DE ASFALTO, DEMARCACIÓN VIAL, HORA DE INICIO 6:00PM Colocación de 820 Toneladas de Asfalto 4 Frentes de trabajo 11/03/2011 Total Acumulado: 15820 Toneladas

More Related