An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Tom Touralias, P.Eng., MBADirector of Engineering & Infrastructure Services 2012 CAPITAL PROJECTS

  2. PUBLIC WORKS

  3. Rourke Line – Phase 2 • Full urban reconstruction / drain enclosure • $4.5 million • Shoreline Road • Full urban reconstruction • $1.4 million • Notre Dame Revitalization – Phase 1 • Finalize Class EA & Design / Utility relocation • $500,000

  4. First Street Storm Pump Station • $750,000 • Sidewalk Repair and New Construction • $350,000 • Trails and multi-use paths • $365,00

  5. BRIDGE REHABILITATIONS VARIOUS LOCATIONS $279,000

  6. CONVERSION OF GRAVEL TO SURFACE TREATED ROADS $269,000

  7. WATER & WASTEWATER

  8. St. Mary’s / Faith Drive • 6” & 12” cast iron watermain replacement • $750,000 • County Rd. 22 / Puce River • 24” crossing of Puce River • $450,000 • Rourke Line • 24” feedermain to future water tower • $600,000

  9. Belle River Water Tower Replacement • 1.25 MIG • Finalize Class EA and Design only • Propose to construct in 2013

  10. Lakeshore Eastern Communities Wastewater Servicing ESR • Commenced in early 2010 • Completion Spring 2012 • Stoney Point, Comber, Lighthouse Cove & Rochester Shoreline • Inflow & Infiltration Reduction Program • $300,000

  11. COMMUNITY SERVICES

  12. Multi-Use Recreation Facility • Design underway (MJMA Architects) • Ice Rinks (2 or 3 tbd) • Gymnasium • Library • Multi-use space • Internal walking track • Tender Spring 2012 / Completion Spring 2014 • Provincial Grant: $17 million • Facility Estimate: $35 - $40 million

  13. Thank you!