Presentation
This presentation is the property of its rightful owner.
Sponsored Links
1 / 13

Presentation at the SAME/Little Rock/Tulsa U.S. Army COE Future Work & Partnering Symposium by PowerPoint PPT Presentation


  • 71 Views
  • Uploaded on
  • Presentation posted in: General

Presentation at the SAME/Little Rock/Tulsa U.S. Army COE Future Work & Partnering Symposium by Shirley H. Reed Deputy for Small Business Vicksburg District Corps of Engineers April 27-29, 2009. VICKSBURG DISTRICT. Civil Works Construction Advertising Schedule.

Download Presentation

Presentation at the SAME/Little Rock/Tulsa U.S. Army COE Future Work & Partnering Symposium by

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Presentation at the same little rock tulsa u s army coe future work partnering symposium by

Presentation

at the

SAME/Little Rock/Tulsa U.S. Army COE Future Work & Partnering Symposium

by

Shirley H. Reed

Deputy for Small Business

Vicksburg District

Corps of Engineers

April 27-29, 2009


Presentation at the same little rock tulsa u s army coe future work partnering symposium by

VICKSBURG DISTRICT

Civil Works Construction Advertising Schedule

1 May 2009 to 30 September 2009


Presentation at the same little rock tulsa u s army coe future work partnering symposium by

LEGEND:

LEGEND:

Division HQ location

Division HQ location

District HQ location

District HQ location

Division boundary

Division boundary

District boundary

District boundary

State boundary

State boundary

Civil Works

Divisions & Districts

North

Alaska

Atlantic

Seattle

Great Lakes &

Ohio River

Walla

New England

Walla

Northwestern

Portland

St. Paul

Buffalo

Detroit

New York

Philadelphia

Rock

Baltmore

Chicago

Pittsburgh

Island

Omaha

Sacramento

-

Hunting

San

ton

Cincinnati

Francisco

Kansas City

Norfolk

St.

South Pacific

Louis

Louisville

Wilmington

Nashville

Little

Tulsa

Los

Rock

Memphis

Angeles

Southwestern

Albuquerque

Charleston

Atlanta

Honolulu

Vicksburg

-

Savannah

Ft. Worth

Mobile

Pacific

Jacksonville

Dallas

Ocean

Division

South

New Orleans

Galveston

Atlantic

Mississippi

Valley


Presentation at the same little rock tulsa u s army coe future work partnering symposium by

Yellowstone

Missouri

Mississippi

Platte

Ohio

Arkansas

Tennessee

Canadian

Red

41% of U.S. Flows Through the

“Body of the Nation”

Mississippi River Drainage Basin

4


Presentation at the same little rock tulsa u s army coe future work partnering symposium by

The Vicksburg District


Presentation at the same little rock tulsa u s army coe future work partnering symposium by

Major Missions


Vicksburg district by the numbers

68,000 square miles

300 miles of Mississippi River

8 ports

12 locks with 9 dams

10 flood control reservoirs

3 hydraulic power generation plants

478 flood control structure

10 flood control reservoirs

21 pumping plants

1,960 miles of levees

1,252 miles of navigable channel

1,709 miles of shoreline

135 recreation areas

3,215 camp sites

2,028 picnic sites

Vicksburg District by the Numbers


Fy 09 small business accomplishments as of april 2009

TargetAccomp.

       Small Business32.0 50.9

       Small Disadvantaged Business18.0 8.1

       HUBZone Small Business10.0 36.9

      Woman-Owned Small Business 5.8 6.6

       Service-Disabled Veteran Owned 3.0 3.5

       HBCU/MI13.4 0.0     

FY 09 Small Business Accomplishments(as of April 2009)

Program Execution (as of APR 2009)


Vicksburg district projects for fy 2009

Channel Improvement

Vicksburg District Projects for FY 2009

Advertising

Date *

Estimated

Value

Description of Work

Project and Item

FY 09 Stone Repairs

Riprap - Various Locations

May 09

$500K - $1.0M

Mississippi River Levees

Item 468-L

Levee Enlargement and Berm

Aug 09

Over $10.0M

River Museum and

Interpretive Center

Exhibit Building

Over $10.0M

Sep 09

* Schedules may change based on availability of funding and other factors.


Vicksburg district projects for fy 20091

Mississippi Delta

Vicksburg District Projects for FY 2009

Advertising

Date *

Estimated

Value

Project and Item

Description of Work

Headwaters Project

RP-05-03, Hickahala Creek

Riser Pipe

Apr 09

$500K - $1.0M

RP-04-04, Yalobusha River

Riser Pipe

Apr 09

$500K - $1.0M

RP-05-02, Yalobusha River

Riser Pipe

Apr 09

$500K - $1.0M

RP-05-03, Hickahala Creek

Riser Pipe

Apr 09

$500K - $1.0M

BS-05-01, Black Creek

Bank Stabilization

Apr 09

$100K - $500K

LD-04-02, Yalobusha River

Low Drop Grade Control Structure

Apr 09

$500K - $1.0M

BS-05-03, Yalobusha River

Bank Stabilization

Apr 09

$1.0M - $5.0M

RP-04-05, Hichahala/Senatobia Creek

Riser Pipe

May 09

$500K - $1.0M

LD-04-05, Hickahala/Senatobia Creek

Low Drop Grade Control Structure

Jun 09

$500K - $1.0M

Riser Pipe

RP-04-03, Yalobusha River

Jun 09

$500K - $1.0M

CI-03-01, Toby Tubby

Channel Improvement

Jul 09

$5.0M - $10.0M

BC-04-01, Hickahala/Senatobia Creek

Box Culvert

Jul 09

$500K - $1.0M

* Schedules may change based on availability of funding and other factors.


Vicksburg district projects for fy 20092

Vicksburg District Projects for FY 2009

Advertising

Date *

Estimated

Value

Description of Work

Project and Item

J. Bennett Johnston Waterway

Lake St. Agnes

Revetment

May 09

$1.0M - $5.0M

Red River Below Denison Dam

Roads on Levee Crown Phase III

Gravel Surfacing

May 09

$1.0M - $5.0M

* Schedules may change based on availability of funding and other factors.


Vicksburg district projects for fy 20093

Red River Emergency

Vicksburg District Projects for FY 2009

Advertising

Date *

Project and Item

Description of Work

Estimated

Value

Bois D'Arc Revetment Phase III

Revetment

May 09

$1.0M - $5.0M

Ouachita River Levees

Monroe to Sandy Bayou Phase III

Gravel Surfacing

May 09

$500,000 to $1.0M

Operation and Maintenance

DeGray Lake

Oil Containment

Jun 09

$100K - $500K

Sardis Lake

Field Office Building

Jun 09

$1.0M - $5.0M

* Schedules may change based on availability of funding and other factors.


Presentation at the same little rock tulsa u s army coe future work partnering symposium by

Search for contracting opportunities with the Vicksburg District at:

http://www.mvk.usace.army.mil/offices/contract/

7261


  • Login