Sundry. Higgs: Aiming for publication ~ 31 Jan CMS and ATLAS plan for 3 papers (H  4l, H  2  , combination) CMS aiming for PRL, ATLAS aiming for PLB  mgt. to make this coherent Combination between CMS/ATLAS to take place after results final. Probably around ~ Moriond …

tgreenawalt
Download Presentation

Sundry

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Sundry • Higgs: Aiming for publication ~ 31 Jan • CMS and ATLAS plan for 3 papers (H4l, H2, combination) • CMS aiming for PRL, ATLAS aiming for PLB  mgt. to make this coherent • Combination between CMS/ATLAS to take place after results final. Probably around ~Moriond… • Wed: General Meeting pw is CMS2012 (not GUT…) • Source of vacuum problem at 18 m from CMS found… • Radiography found bad mechanical connection btw RF fingers and insert • Next couple of pages have pictures • Plan: replace the connection under “Neon overpressure” • This procedure should lead to quick turnaround in vacuum recovery • If all goes well, ~1 week delay in startup • If all goes badly (need to bring beam pipe to air) delay until ~1 June... • Work ongoing to understand luminosity at CMS • HF gain drift corrections likely to increase luminosity by 8%... G. Rakness (UCLA)

  2. This and following 2 pages from Austin Ball (CERN) presentation at… https://indico.cern.ch/conferenceDisplay.py?confId=169383 RF fingers & spring very fragile RF fingers spring flange

  3. Connection should look like this bellows flange spring RF insert RF fingers

  4. X-rays on 20-12-2011, 18 m right (z-) Vertical view Overlap of ~ 6 mm, RF fingers INSIDE RF insert. Estimated aperture reduced to 36 mm Non Conform flange RF insert RF fingers… INSIDE RF insert…

  5. Documenting CSC synchronization procedures In progress at… https://twiki.cern.ch/twiki/bin/view/CMS/CSCsynchronizationDocuments • History and overview • What does it mean to be synchronized? • Procedure to determine the online synchronization parameters of the CSC • Parameters which must be set prior to measurements • Specify trigger primitive conditions • Set the Time-Of-Flight (TOF) parameters • Delay the signals to CFEB • Measure ALCT-TMB communication parameters • Measure the BC0 parameters • Measure the L1A delay parameters • Global and Local trigger paths • Measure the L1A receipt for CFEB, ALCT and TMB readout • Measure the DAV parameters • Align CLCT with ALCT • Set CFEB TOF values • Measure CFEB-TMB communication parameters • Greg, really clean up the rest of this crap, and finish this documentation... • If something changes, where in the procedure do you have to start? • Some details about the CSCTF Sector Processor • Additional links G. Rakness (UCLA)

  6. Preparing for CMS running in 2012 • I have assembled the list of Ops Managers • https://twiki.cern.ch/twiki/bin/view/CMS/OnlineWBContactList and https://twiki.cern.ch/twiki/bin/view/CMS/OnlineWBContactListDetails1 • These are the folks I’ll contact when there is a problem • Example: For CSC, this is Misha and Evaldas • 30 Jan: First CMS Run Meeting of 2012… G. Rakness (UCLA)

  7. Global schedule for 2012 • 16 Jan: Water cooling back • 17 Jan: Power on sub-detectors • … shifters still needed to allow 24/7 operation… • 19 Jan: Able to turn on CSC HV • 23-27 Jan: Test DDU/DCC firmware • Jason will be at CERN during this week… • 30 Jan-3 Feb: New ALCT firmware/measure timing • I’ll be supervising Misha to do this job • ~8 Feb: Begin testing SEU recovery (?) • 15-16 Feb: Mid-week global run • 22-23 Feb: Mid week global run • 23 Feb: Magnet on (?) • 27 Feb - 7 Mar: continuous cosmic running • 9 Mar: begin commissioning with beam • 30 Mar: stable beams (?) G. Rakness (UCLA)

  8. To do • Reading • ARC for Contact Interactions this week • More Run Coordination stuff • Prepare short talk for upgrade meeting next week • Think about how to track problems in subsystems • Documentation • ALCT/CLCT muonic timing • Analysis • Finish neutron note with Jay • Re-sort gain values into backward/forward chambers types for Armando and Oleg • Contact Antony about dE/dX progress… G. Rakness (UCLA)