1 / 6

Marina Reservoir Recirculation Scheme (MRRS)

Marina Reservoir Recirculation Scheme (MRRS). Project Status Consultants: CDM Detailed Design stage Scope of construction works Discharge structures & pipelines Pumping facility and pipeline Modification of existing Waterworks Spillway and channels.

tex
Download Presentation

Marina Reservoir Recirculation Scheme (MRRS)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Marina Reservoir Recirculation Scheme (MRRS) • Project Status • Consultants: CDM • Detailed Design stage • Scope of construction works • Discharge structures & pipelines • Pumping facility and pipeline • Modification of existing Waterworks • Spillway and channels

  2. Marina Reservoir Recirculation Scheme (MRRS) Tenders Schedule 1. Construction of Discharge Structures for Eastern & Central Pipelines Expected Tender Calling Date : Jul 2008 2. Construction of Pumping Facility and Pipeline near Whampoa Canal Expected Tender Calling Date : Aug 2008 3. Construction of Spillway and Channels at Upper Pierce Reservoir Expected Tender Calling Date : Sep 2008 4. Modification of Chestnut Avenue Waterworks Expected Tender Calling Date : Oct 2008

More Related