NEI Issues & Current Events

NEI Issues & Current Events. George Oliver June 22, 2009 19th Annual RETS – REMP Workshop South Bend, Indiana. NEI Issues & Current Events. NEI Groundwater Protection Initiative NEI Technical Report 08-08 DG-1186 & DG-4013 (aka RG 1.21 & 4.1) Decommissioning Planning

tevin
Download Presentation

NEI Issues & Current Events

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NEI Issues & Current Events George Oliver June 22, 2009 19th Annual RETS – REMP Workshop South Bend, Indiana

  2. NEI Issues & Current Events • NEI Groundwater Protection Initiative • NEI Technical Report 08-08 • DG-1186 & DG-4013 (aka RG 1.21 & 4.1) • Decommissioning Planning • SECY 08-0197 Radiation Protection Standards

  3. NEI Groundwater Protection Initiative • Nuclear Generating Unit Issues 2005-2006 • Indian Point, Braidwood….. • NRC Also Formed “The Liquid Radioactive Release Lesson Learned Task Force • Report September 1, 2006 • 26 Recommendations • Not A Health And Safety Issue • It Was An Issue About Communications And Public Perception (Transparency) • NEI 07-07 Issued 8-31-2007

  4. NEI Groundwater Protection Initiative • What's Happening? • NRC Began Assessment Summer-2008 • GWPI Self Assessments (One Year After Implementation) • NEI Sponsored Peer Assessments • EPRI/NEI Groundwater Protection Workshop September 15-16, 2009 – Charleston, SC

  5. NEI Groundwater Protection Initiative

  6. NEI Groundwater Protection Initiative

  7. NEI Groundwater Protection Initiative • NEI Peer Review Issue Areas • SSC’s Risk Assessments (Objective 1.2) • Remediation Protocol (Objective 1.4) • NEI Notification (Objective 2.2.e) • Note: These Are Detailed Assessments

  8. NEI Technical Report 08-08(New Plants) • Meeting The Operational Requirements Of 10 CFR 20.1406 & Regulatory Guide 4.21 • NEI 08-08 Minimizing Facility Contamination • MINIMIZATION OF LEAKS AND SPILLS • PROMPT DETECTION OF LEAKAGE • MINIMIZE THE POTENTIAL OF THE RELEASE OF CONTAMINATION FROM UNDETECTED LEAKS • REDUCING THE NEED FOR DECONTAMINATION OF EQUIPMENT AND STRUCTURES • REVIEW OF OPERATIONAL PRACTICES

  9. NEI Technical Report 08-08(New Plants) • NEI 08-08 MINIMIZING CONTAMINATION OF THE ENVIRONMENT • SITE CONCEPTUAL MODEL DEVELOPMENT • EARLY DETECTION OF LEAKAGE AND CONTAMINANT MIGRATION • FINAL SITE CONFIGURATION • NEI 08-08 FACILITATION OF DECOMMISSIONING • DESIGN AND OPERATIONAL FEATURES • DECOMMISSIONING RECORDS

  10. NEI Technical Report 08-08(New Plants) • NEI 08-08 MINIMIZING THE GENERATION OF WASTE • WASTE MANAGEMENT • ONSITE STORAGE OF RADIOACTIVE WASTE • Based Largely On NEI 07-07 Objective 1 • NEI 08-08 Is Part Of The Licensing Basis • As The Licensing Basis It Is Not Voluntary

  11. Decommissioning Planning Rules • Federal Register Notice 1-22-2008 • Financial And Monitoring Guidance • Comments Submitted 5-8-2008 • NEI Decommissioning Taskforce

  12. Decommissioning Planning Rules • The Nuclear Industry Shares The NRC Goal Of Preventing Legacy Sites • We Do Not Believe The Proposed Rules Are Required To Prevent Future Legacy Sites • Any Health And Safety Benefits Do Not Justify The Burden Created By The Rules • We Also Believe The Proposed Rules Are A Backfit

  13. Decommissioning Planning Rules • Rules Provide For Adjustment of Financial Assurances Based On Soil Or Groundwater Contamination • Rules Provide For Subsurface Evaluations Based On Decommissioning Criteria

  14. Additional Issues of Interest Decommissioning Planning Rules • NRC Is Reviewing Proposed Final Rules • DG-4014 To Be Issued For Public Comment • A NRC Stakeholder Workshop Is Anticipated Later This Year

  15. DG-1186 & DG-4013 IssuesIndustry & Staff Efforts • Industry Contribution From 30+ Individuals • Many Detailed Technical Comments • Professional & Productive Relationship With Staff • January 15, 2009 Workshop Productive • Emergence Of SECY 08-0197 • 40 Guidance Documents Impacted • An Integrated Approach Is Needed

  16. DG-1186 & DG-4013 IssuesNeed For Integrated Approach • DG-1186 & DG-4013 Duplicate & Inconsistent With Other Guidance • Several Guidance Documents Related To Groundwater • SECY 08-0197 Offers A Real Opportunity • Benefits Of Consolidated Guidance

  17. DG-1186 & DG-4013 Opportunities • The Existing Guidance Should Remain Applicable • The Licensing Basis Is Not Impacted • Clarification Of Solid Radioactive Waste Reporting • Elimination of On Site Radiological Monitoring Programs From DG-4014 • Additional Flexibility • Calculate C-14 Effluents

  18. SECY 08-0197Need For Integrated Approach • Emergence Of SECY 08-0197 • NEI/Industry Supports The Approach Taken By The Commission • Approximately 40 Guidance Documents Impacted • An Integrated Approach Is Needed • Supports Efficient Resource Utilization • Gather Stakeholder Input • Several Year Effort

  19. We Need Your Support! • Completion Of GWPI Peer Reviews • Review Of DG-4014 “Decommissioning Planning” Monitoring • SECY 08-0197 “10 CFR 20, 10 CFR 50, …”