1 / 11

Energy Systems Research & Testing Activities at INEEL

Energy Systems Research & Testing Activities at INEEL. Greg Mines. March 2003. Energy Systems Research & Testing. Objective: Develop technologies that increase economic viability of power generation Research oriented towards increasing component & process efficiency

tawny
Download Presentation

Energy Systems Research & Testing Activities at INEEL

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Energy Systems Research & Testing Activities at INEEL Greg Mines March 2003

  2. Energy Systems Research & Testing Objective: • Develop technologies that increase economic viability of power generation • Research oriented towards • increasing component & process efficiency • decreasing capital and operating costs • Surface conversion equipment and processes Aligned with DOE’s programmatic goal of reducing the levelized cost of power

  3. Increasing Conversion Efficiency Importance: • Large quantities of fluid • Cost/value associated with fluid Impact: • More equipment intensive • Plant $/kW may not decrease significantly • Total project $/kW will decrease • Cost of power will decrease

  4. Current INEEL Research Tasks • Enhanced Air Cooled Condenser Performance • NCG Removal from Binary Plants • Steam Quality Monitor • Thermal Spray Coatings – Internal Surfaces • On-line Bio-film Monitor • Natural H2S Abatement - Microbial Sulfur Oxidation • Development of Power Plant Costs • Improving Existing Plant Performance

  5. Enhance Air-Cooled Condenser Performance • Binary plant air-cooled condensers • Installed: 20-35% of plant cost • INEEL investigating use of vortex generators • Bench scale test results • 30-40% higher air heat transfer coefficients • expect 10-20% higher “U” – same fan power • CRADA agreement – McElroy Manufacturing • Initiate field test of prototype - 2005

  6. Non-Condensable Gas Removal – Binary Plants • NCG’s not associated with binary plants • accumulate in condenser • reach threshold - operators vent • Membrane separation process for continuous removal: • 1% ncg level • increase power by 2 – 4% • WF emissions <100 lb annually • Field testing underway (SBGeo, Mammoth) • Collaborate with Membrane Technology Research • Complete extended field testing - 2004

  7. INEEL ESR&T Funding YearFunding FY-98 $ 787K FY-99 $1,157K FY-00 $1,274K FY-01 $1,340K FY-02 $1,195K FY-03 $1,059K

  8. Technology Transfer • Meet on regular basis with industry • Results are reported and presented at industry attended meetings (GRC, ASME) • Where appropriate pursue intellectual properties • patents • licenses for technologies

  9. Accomplishments • Increased conversion efficiency (power output) • 2 to 4% with continuous ncg removal • up to 8% with mitigation of off-design operation • 2 to 5% with improved air–cooled condenser design • In-plant validation of improved process monitors • steam quality and hydrogen sulfide (ppm) • bio-film monitors

  10. Accomplishments (cont’d) • Decreased costs • decreased capital cost associated with 10-20% increase in air-cooled condenser performance • CRADA to develop “tooling” for condenser modifications • developed method of applying thermal spray coatings to internal surfaces (pipes, valves); <50% cost of exotic materials

  11. Future • Commercial ncg removal technology - 2004 • Bio-film monitors incorporated into plant - 2004 • Field test of prototype condenser - 2006 • Tooling commercially available to fabricate condenser tubes with fin enhancements - 2006 • ASTM specification for applying thermal spray coatings - 2006 • Continuous H2S and HCl (ppb) monitors - 2007

More Related