An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Updates on CENF SB WGCENF Project Meeting 3rd October 2013 M. Calviani for the CENF SB WG team

  2. Updates/progress • Progresses in the CE drawings based on latest discussions about ventilation system and safety aspects • Trench integration progressing taking into account RP constraints • Discussions on-going with HE to maximize vertical movement of the shielding blocks and apply ITER Code of Practice • First proposition based on this new design will come during next few weeks M. Calviani - CENF PTM 3rd October 2013

  3. M. Calviani - CENF PTM 3rd October 2013

  4. M. Calviani - CENF PTM 3rd October 2013

  5. CV aspects • EN/CV provided a first pre-design of the ventilation systems of the various sectors composing the installation • This will be fed into RP/SEE calculations for the total release into atmosphere (expected ~1 uSv/y) • Lacking a complete risks assessment (see later), conservative assumptions have been used to start design of the ventilation system M. Calviani - CENF PTM 3rd October 2013

  6. RP and safety aspects • RP aspects are well under control, and no major showstopper is to be foreseen • Preparation of a summary document note foreseen for the next few weeks • Sky shine effect to be followed • PPS and risks assessment • A small working group will be created (S. Hutchins will lead it) to prepare by end of the year a risks assessment table • Document to be prepared by end of the year M. Calviani - CENF PTM 3rd October 2013

  7. On-going and critical • Target (pre)design is on-going – preliminary results at the next SBWG meeting (+ shielding thermo mechanical analysis) • Possibilities to avoid emptying the He-vessel under consideration  online filtering • Horns design discussions still pending (critical for the powering part, for which people are ready contributing in the design) • ISR evaporator experience will be addressed during next SBWG meeting M. Calviani - CENF PTM 3rd October 2013