Cost Estimating Phase II

Cost Estimating Phase II. Group Members: Gilliland, John Goodell, Christopher Jemison, Jennifer Longden, Katherine Oliveira, Nickolas. Not Included in Estimate:. Alternative A Estimated at $2,650,000. Included in Estimate:. 15500 S.F. of Heated Walkways with drainage

Download Presentation

Cost Estimating Phase II

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Cost Estimating Phase II Group Members: Gilliland, John Goodell, Christopher Jemison, Jennifer Longden, Katherine Oliveira, Nickolas

  2. Not Included in Estimate: Alternative AEstimated at $2,650,000 Included in Estimate: 15500 S.F. of Heated Walkways with drainage 1 Steel Pedestrian Bridge 1500 L.F. of 2’ Retaining Walls 1500 L.F. of Trenching and Electric Utilities Permitting Band Stand (estimate) Landscaping Specific materials costs for bridge

  3. Not Included in Estimate: Alternative BEstimated at $3,040,000 Included in Estimate: 15,000 S.F. of Heated Walkways with drainage 1 Pedestrian Bridge 1’, 2’, 3’, & 4’ Retaining walls 13 Pods 1500 L.F. of Trenching and Electric Utilities Permitting Band Stand Landscaping Some specific pathway materials costs

  4. Not Included in Estimate: Pod DesignEstimated at $620,000 Included in Estimate: 6,500 S.F. of Heated Walkways 325 L.F. of 24” retaining wall 325 L.F. of 36” retaining wall 26 Park Benches (2 & 3 seat) Landscaping Material Specific Costs

  5. Band Stand Design Rough estimate: $200,000

  6. Environmental & Permitting • The application cost for the permits needed is $48,820

  7. Materials List • Included: • Alternative B (without fence, landscaping) • Alternative A (Bridge railing design, landscaping) • Band Stand (Without roof or wall materials) • Not Included: • Pod Design (materials)

  8. Current Materials List

  9. Lumec Luminares • Demonstration

  10. Questions