Main modifications during the coming Christmas TS and implications for start-up

Main modifications during the coming Christmas TS and implications for start-up. Etienne CARLIER TE/ABT/EC 09/12/2011. Outline . Injection Beam dump MKQA TCDQ. Injection. Shot-by-shot logging Move from measurement and logging databases to SDDS Add Ip and DUMP switches signals

stella
Download Presentation

Main modifications during the coming Christmas TS and implications for start-up

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Main modifications during the coming Christmas TS and implications for start-up Etienne CARLIER TE/ABT/EC 09/12/2011

  2. Outline • Injection • Beam dump • MKQA • TCDQ

  3. Injection • Shot-by-shot logging • Move from measurement and logging databases to SDDS • Add Ip and DUMP switches signals • Check possibility to implement mountain range representation within IPOC viewer • Re-organise signal distribution (same sampling rate for TMR and MAIN switch signals) • Deploy IPOC for triggering signals • MAIN & DUMP triggers, RCPS triggers, Injection Prepulse • Erratic trigger, No trigger, AGK window

  4. Injection (cont.) • Add cooling unit under thyratron heater crates • Replace Pulse Inverter (PI) with Fast Pulse Adapter (FPA) modules  Fine synchronization to be re-checked • Reduce AGK window by 50ns (Reduction IQC thresholds for bunches 1)  Fine synchronization to be re-checked • Replace LECROY scopes with TEKTRONIX • Embedded web server instead of Windows-XP

  5. Injection (cont.) • Add “userPermitted” and “allUserPermitted” settings in MCS • Add “sparkTimer” status in “isSoftStartPermitted” flag • Review OFF status generation in state machine • Integration PMdata within FESA classes for all data needed by IQC • Numbering timing modules in UA as in drawings

  6. Injection (cont.) • Test magnet PT100s • Maintenance KITS software  To be tested before first KISS • Replacement primary circuit breaker in PDC • Check interlock thresholds (MOVD, KFMD…)  To be tested before first KISS

  7. Beam Dump • Maintenance HEINZINGER PNCcap35000-10pos power supplies • Replacement HV voltage output transformer • Replacement METALUX resistor in HV output voltage divider  Full MKD/MKB recalibration needed • Increase re-trigger delay from 100us to 200us • Upgrade TSU • Firmware • AGK window length • 1.2V internal voltage filtering  Revalidation with beam needed (machine setup)

  8. Beam Dump • Replace output circuit (faster) for TSU BIS input circuit (BOOT module)  Channel to be re-tested with MP before machine closure • Implement redundant triggering signal for generator IPOC • Repair faulty ROGOWSKI amplifier • Install local control panels in MKB area

  9. Beam Dump • Integration PMdata within FESA classes for all data needed by XPOC  Re-commissioning of XPOC system • Improve filtering on MKB signals (wavelets???) • Implement new Energy Scan function • In PLC • In FESA (TBC) • Resynchronize generator level CPU with UTC

  10. Beam dump • Implement • BRF enable/disable property • MKB ready/not_ready property • RBAC roles for these to property  Functionality and protection to be tested

  11. MKQA • Upgrade triggering system for Aperture mode  Life test before machine closure • Recalibration of Aperture mode voltage dividers • Review OFF status generation in state machine

  12. TCDQ • Replacement 12 bit ADC with 16 bit ADC • Implement beta* interlocking function  Full re-validation without beam • Modify measurement to logging database data transfer criteria • Recalibration beam 2 ???  Alignment to be re-checked with beam