1 / 5

Dal Disaster Recovery alla Business Continuity “Prepare for the worst, don't hope for the best”

Dal Disaster Recovery alla Business Continuity “Prepare for the worst, don't hope for the best”. Villa d’ Este Cernobbio 28 ottobre 2008 Convegno organizzato da:. Con la partecipazione del British Standard Institute. Sponsor:. Argomento: Business Continuity Management.

slade-dale
Download Presentation

Dal Disaster Recovery alla Business Continuity “Prepare for the worst, don't hope for the best”

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Dal Disaster Recovery alla Business Continuity“Prepare for the worst, don't hope for the best” Villa d’ Este Cernobbio 28 ottobre 2008 Convegno organizzato da: Con la partecipazione del British Standard Institute Sponsor:

  2. Argomento:Business Continuity Management • Definizione: dare una risposta ad eventi improbabili che consenta di mantenere attivi i processi essenziali per la sopravvivenza dell’azienda e soddisfare i requisiti di legge e le norme imposte nei paesi in cui si opera. • Premessa: ilcosto di lunghi periodi di inattività si può rivelare devastante. Studi hanno dimostrato che in seguito ad un disastro il 70% delle aziende che non sono state in grado di accedere ai propri dati entro i successivi cinque giorni sono fallite. • Tesi del convegno: un investimento nel dotarsi di un sistema di Business Continuity Management produce un miglioramento della redditività e mette al riparo l’azienda da rischi inaccettabili.

  3. Agenda • 9.00 - 9.30 Accoglienza e registrazione Sala Torlonia • 9.30 – 10.30 Benvenuto e Agenda , Presentazione di Digipoint, Introduzione al tema • dr. Renato Zerbini BDM Digipoint Lead Auditor ISO/IEC 27001 • 10.30-11.00 La Norma BS 25999 per il Business Continuity Management dr. Stefano Bonetto British Standard Institute • 11.00 - 11.15 Coffe Break • 11.15 - 11.45 Symantec dr. Roberto Savastano • 11.45 - 12.15 Fujitsu Siemens dr. Fabio Cesari • 12.15 - 12.45 NetApp ing. Francesco Tripodi • 12.45 - 13.15 Plasmon Data ing. Carlo Restelli • 13.15 - 15.15 Lunch Ristorante Veranda • 15.15 - 16.30 Come realizzare nella propria azienda un sistema di Business Continuity Management migliorando la redditività e con un investimento contenuto: approccio, guideline, metodi, strumenti, tecnologie, costi, ritorno degli investimenti. Q/A Panel relatori • 16.30 - 16.45 Coffe Break • 16.45 – 17.15 Presentazione del Busines Continuity Pakage: Consulenza, Servizi, Hw e Sw. R.Zerbini • 17.15 - 17.45 One to one con i relatori • 17.45 - 18.00 Sintesi e chiusura dei lavori

  4. Location Situato sulle sponde del Lago di Como, l'Hotel si trova tra i più importanti crocevia tra l'Italia ed il Nord Europa.60 minuti da Milano, 50 minuti dalla Fiera Milano - Rho. Indirizzo: Via Regina, 40 - 22012 Cernobbio Come arrivare Auto privata:L'uscita Como Nord dell'Autostrada A9 Como-Chiasso si trova a 5 Km dall'Hotel. Una volta usciti dall'autostrada seguire le indicazioni Cernobbio dove si troveranno le indicazioni per Villa d’Este. Il parcheggio gratuito è all’interno del parco di Villa D’Este. Treno: Da Milano Centrale ( partenza ore 8.25 ) Como S.Giovanni (arrivo ore 9.07).Il trasferimento dalla stazione di Como all'Hotel richiede, in taxi, circa 10 minuti.Da Milano Stazione Nord (partenza ore 8.00) Como Lago (arrivo ore 8.55) Il trasferimento dalla stazione di Como all'Hotel, Bus 6 per Maslianico, (partenza 9.18 arrivo a Cernobbio ore 9.33). I treni provenienti dalla Svizzera e diretti a Milano Centrale prevedono la sosta alla stazione di Como San Giovanni.

  5. Per iscriversi inviare una mail a: marketing@digipoint.it con oggetto: iscrizione aggiungere: ruolo aziendale, nome cognome azienda

More Related