1 / 15

Soneva Gili Resort Comments on existing STP

Soneva Gili Resort Comments on existing STP. 27. August 2008. Current sewage system Soneva Gili. STP designed for 80m³, actual load 160m³. Chlorine dosage. Sludge separation. Rotating disc. Buffer tank. Overflow. Waste water. Smell, no clear water, black tank, bio activity?.

skyler
Download Presentation

Soneva Gili Resort Comments on existing STP

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Soneva Gili ResortComments on existing STP 27. August 2008

  2. Current sewage system Soneva Gili STP designed for 80m³, actual load 160m³ Chlorine dosage Sludge separation Rotating disc Buffer tank Overflow Waste water Smell, no clear water, black tank, bio activity? Sewage treated water tank 164m³ Septic tank 80m³ Standard Overflow RO Desalinated water tank 245m³ Fresh water

  3. Septic tank

  4. Rotating disc, sludge separation, chlorine dosage

  5. Chlorine dosage with small buffer tank

  6. Sewage treated water tank

  7. Water consumption Soneva Gili

  8. Water Consumption Soneva Gili Data from July to April are from 2007. Data May and June from 2006

  9. Improve STP at Soneva Gili • Challenge: • Higher daily volumes then anticipated • Higher load (incl. laundry) then anticipated • No waste water relevant data available • Mixed responses on “smelly” waste water used during irrigation • Options • Do nothing • Improve current operation • Add another rotating disc to cover ‘Increased volume’ • Add another section to improve ‘effluent quality’ on top of option 3 • Replace with new STP

  10. Option 1 : Do nothing • Even if there are no guests or hosts complaints and legal effluent standards are met we would still recommend Option2: Improve current operation

  11. Option 2 : Improve current operation • 1. Wateranalysis (Quality) • Existing sewage at different measurement location: • After the laundry • Before the entry into the septic tank (laundry and other sewage combined) • After the septic tank and before the entry into the rotating discs (after first treatment) • After the rotating discs and before the chlorination • Important measurements are • COD, BOD, Suspended solids, NH4-N, any other parameters offered by the supplier • Frequency: Every two weeks for a period of 8 weeks • 2. Water analysis (Quantity) • Water meter to be installed at the entry into the septic tank system to measure peak flows and average flows. Daily and hourly readings • These data will be used a standard effluent parameters for any Six Senses resort assuming similar loads and volume fluctuation. • Important: Commenting on effluent quality from laundry and its impact on STP operation

  12. Option 2 : Improve current operation • Check and repair grease trap • Increase cleaning frequency of pre treatment step. Sludge level should not be higher then 30cm below the deepest water level of pretreatment. Floating sludge should not be thicker then 10cm otherwise it should be destroyed manually • Regular cleaning of biological growth that connect the discs • Regular cleaning lamella separators and extract any floating sludge • Control of treated water tank for sedimentation that increase fouling potential • Check dosing of chlorine and ensure that 0.5mg/l is still left in the treated water tank • Increase of pretreatment volume if possible • Install simple sand filter after last treatment step and before chlorination • Check if black tank attract heat that transmits into stored water. Protect black painted from direct sunshine, if possible paint it white to reduce heat transfer to store water as cool as possible. • Most important: Get real data on flow and contamination level as indicated not only for Soneva Gili but as benchmark for all other Six Senses resorts

  13. Option 3+4: Extension of existing STP plant – Not recommended Increase effluent quality € 130,000* Increase volume € 40,000* *See detailed quotation from S+P

  14. Option 5 : Replace with new STP • This option is only recommended if • Option 2 does not improve situation • The proposed SBR for Soneva Fushi is successfully implemented • Sufficient STP relevant data has been collected • Budget allows (estimated costs: SBR based on Soneva Fushi Design ca. € 75,000)

More Related