Critical Capacity needs for Power Pools and Power Utilities. 17 th UPDEA CONGRESS HAMMAMET (Tunisia ), 28-31 MAY 2012. Outline. Overview of Power Pools Status Critical Capacity Issues by Power Pool CAPP COMELEC EAPP SAPP WAPP
E N D
Critical Capacity needs for Power Pools and Power Utilities 17th UPDEA CONGRESS HAMMAMET (Tunisia), 28-31 MAY 2012
Outline • Overview of Power Pools Status • Critical Capacity Issues by Power Pool • CAPP • COMELEC • EAPP • SAPP • WAPP • Summary of Critical Capacity needs for Power Pools and Utilities www.icafrica.org
Overview of Power Pools Status (1/2) www.icafrica.org
Capacity needs for CAPP • Tools for operating HV interconnected systems • Approach for regulation of the power systems • Methodology for designing power trade tariffs • Specific approaches for the development of respectively small, medium and large hydro-power programs/projects • CB for sustaining the development of the information system
Capacity needs for COMELEC • Approach for implementing regional market structure and rules • Approach for developping power trade on a commercial basis through medium and LT bilateral contracts • Approach for integrating regional trade into power investment planning for regional market • Approach for adopting a regional regulatory framework • Defining a regional strategy for developing RE for export to neightbouring countries • Strengthening regional institution with an adapted mandate and structure for COMELEC
Capacity needs for EAPP • Approach for mobilizing the required funding • CB as pre-condition for developing regional power trade and its implementation • Targeted training programs on: • Technicians dealing with power systems and interconnection operations • Finance staff dealing with market operations, contract preparation and negotiation • Staff dealing with implementation of market rules, design of wheeling tariffs,… • Setting up and Implementing the data base
Capacity needs for SAPP • Approach for leveraging SAPP regional trade market as asset for guaranteeing future investments • Approach for funding multi-users regional transmission projects through SPVs • Strengthening SAPP Coordination Centre for coping with regional market developing activities: • Promoting the funding of SAPP priority projects • Managing the fast growing SADC power regional market (adapting the mandate, recruiting additional staff, training staff on mobilizing funding and managing power market).
Capacity needs for WAPP Conducting in depth capacity building program for securing the implementation of an efficient information and operation system Training program fo the development of market tools In depth knowledge and experience for increasing competence in regional legal, commercial and financial framework of utility operation and power pools; PPP, PPA, tariff policy, … Comprehensive approach on Quality Management Control at utility level: (i) technical and commercial management, (ii) tariff setting, (iii) human resources management.
Summary of Critical Capacity needs for Power Pools and Utilities
ICA SECRETARIATAfrican Development BankBP 323 – 1002 Tunis BelvedereTunisiawww.icafrica.org Contact us: ICA Energy Sector Platform:Callixte KAMBANDA (ckambanda@afdb.org)