1 / 26

CV Arboretum

CV Arboretum. Anne Wynn Siri Erickson Michael Trujillo Van Fudge. Overview. District wide arboretums Each year a new school will start an arboretum project Crescent Valley is the first to receive an arboretum . Goals. Educational tool Aesthetically pleasing

shiloh
Download Presentation

CV Arboretum

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CV Arboretum Anne Wynn Siri Erickson Michael Trujillo Van Fudge

  2. Overview • District wide arboretums • Each year a new school will start an arboretum project • Crescent Valley is the first to receive an arboretum

  3. Goals • Educational tool • Aesthetically pleasing • Help decrease erosion of creek

  4. Considered Sites • East side of football field behind old bleacher location • West lawn in front of gym, between the new indoor athletic facility, and the sidewalk to the gym

  5. Chosen Site

  6. Factors • Compatibility with soil types • Coordination with existing structures, plumbing, and power lines • Accommodation of student use of area • Potential to be used for instructional purposes • Time to mature • Potential to absorb runoff

  7. Procedure • An initial meeting was held on with Cherie Stroud, Kim Patten, Craig Ellingson, Dave Eckert, Dan Bregar, and the AP Environmental Science student group. The design criteria for the arboretum were determined at this meeting.

  8. Procedure (cont.) • Dave Eckert, proprietor of Willamette Watershed Productions and Virginia Village Productions, took the design criteria and formulated a concept design

  9. Procedure (cont.) • A meeting was held on Friday, April 30th with Cherie Stroud, Dave Eckert, Kim Patten, Brad Probst , Jennifer Davis, Mrs. Cornell, and the AP Environmental Science student group. The concept design was reviewed and modified.

  10. Procedure (cont.) • Modifications included: • Omit the design and planting of the Douglas-Fir Upland Forest. This will take way too much space than we can afford. • Omit the design and planting of all herbs at this point. • Design and plant a small Bottomland Riparian area using the plants on the list, with the exception of Black Cottonwood and Willow • Design and plant a Oak woodlands  with the exceptions of Doug-fir, Black Hawthorn, Introduced Cherry and Poison Oak • Design and plant a small Rain Garden at the outfall of the drainage pipe from the batting cage building

  11. Procedure (cont.) • Design was further modified by David Eckert • The renewed design was reviewed by the APES students and finalized

  12. Results

  13. Oregon White Oak

  14. Pacific Madrone

  15. Ponderosa Pine

  16. Black Hawthorn

  17. White Alder

  18. CascaraBuckthorn

  19. Oregon Ash

  20. Moving Forward • Prepare the soil • Begin Lasagna planting • Cardboard over area • Grass killer • Mulch over the cardboard

  21. Lasagna Technique

  22. Moving Forward (cont.) • Bregar’s class will begin process during the last week of school • Soil will be ready by fall 2010 • Science classes will plant in November of 2010 and begin monitoring

More Related