1 / 9

HIGH LEVEL SAFETY CONFERENCE Montreal 30 March 2010

Responding to Questions Raised Regarding the Evolution of the USOAP-CMA Henry Gourdji Chief, Safety Oversight Audit Section. HIGH LEVEL SAFETY CONFERENCE Montreal 30 March 2010. Questions Raised During Discussion of Topic 1.2.

sherry
Download Presentation

HIGH LEVEL SAFETY CONFERENCE Montreal 30 March 2010

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Responding to Questions Raised Regarding the Evolution of the USOAP-CMAHenry GourdjiChief, Safety Oversight Audit Section HIGH LEVEL SAFETY CONFERENCE Montreal 30 March 2010 HLSC 29 March to 1 April 2010

  2. Questions Raised During Discussion of Topic 1.2 • Will information from Regional Organizations be considered under USOAP-CMA? • Will States be able to have more than one National Continuous Monitoring Coordinator (NCMC)? • Will States be provided with detailed information on the transition to USOAP-CMA? • Does USOAP-CMA rely on information gathered through SSPs? • What will be required of States during the transition period? • Is two years sufficient to complete a transition to the USOAP-CMA? HLSC 29 March to 1 April 2010

  3. Will information from Regional Organizations be considered under USOAP-CMA? • Safety information gathered from Regional and International Organizations will be taken into consideration under USOAP-CMA. HLSC 29 March to 1 April 2010

  4. Will States be able to have more than one NCMC? • ICAO acknowledges the need for flexibility in the number of NCMCs required in certain States. This will be addressed on a case-by-case basis. HLSC 29 March to 1 April 2010

  5. Will States be provided with detailed information on the transition to USOAP-CMA? • The Secretariat will provide States with detailed information on the USOAP-CMA transition plan prior to the Assembly via State Letter or Electronic Bulletin. HLSC 29 March to 1 April 2010

  6. Does CMA rely on information gathered through SSPs? • The CMA does not depend on information gathered through SSPs. SSPs are only one of many information sources that will enhance the efficiency of USOAP-CMA. HLSC 29 March to 1 April 2010

  7. What will be required of States during the transition period? • States will only be required to do the following during the transition period: • Nominate one or more NCMCs who will complete computer-based training. This will be done remotely through the internet. • Provide an update to the SAAQ and CAP. These documents were originally completed by all States audited during the CSA audit cycle. HLSC 29 March to 1 April 2010

  8. Is two years sufficient to complete a transition to the USOAP-CMA? • During the transition period, the Secretariat will provide regular progress reports to Council on the implementation of the USOAP-CMA. • If necessary, additional time may be provided to complete the transition. HLSC 29 March to 1 April 2010

  9. Thank you HLSC 29 March to 1 April 2010

More Related