An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Efforts toward CHPS Implementation at NERFC

  2. When we last met… • Issues on the table for NERFC included: • Commence migration activities • Transition to GFE QPF production • Test & Evaluate Daily QC as a means for MAP • Transition to GFFG • Work with Deltares on HEC-RAS • LOT to develop a Parallel Ops plan

  3. Progress report • Migration is nearly complete • A few lingering issues migrating the Hudson • Latest batch of RTI segments to be tested and implemented by Sept ‘09 • NERFC issuing all QPFs via GFE • Staff trained, worked out the kinks with the Verification folks and took care of in-house scripts for web graphics

  4. Progress report • Daily QC grids being run daily • HAS unit leading this effort • Comparison data sets available back to April 2009 • Staff to be trained Aug/Sept • GFFG up/running in parallel • 2 x a day – posted to a web page • WFOs evaluating in real-time

  5. Progress report • Continuing to work closely with Deltares on HEC-RAS • Connecticut river running on laptop • Includes a dam with gates and a levee • Successfully runs over 3 month period including spillway activation and levee breach • Still awaiting CHPS/LINUX version

  6. Progress report • Local Implementation Plan for Parallel Operations has been developed • Under final review at this time • Items addressed include: • Forcings and Forecast comparisons/validation • Forecaster assignments • Workload assessment

  7. Challenges in Migration Process • Migration has been time consuming • Frustration over failure of migration scripts following various upgrades and installations • Embedded nature of variables being referenced in many different locations has made trouble shooting very difficult and solutions are not always intuitive • Migration training was too short – needed to include in depth discussion of system, file structure and trouble shooting • What was provided was excellent • Note that NERFC was brought into process late but we may actually be a good litmus test for the remaining 9 RFCs • On-line system still not functioning as expected • Hopeful that Sys Admin training will address its configuration, functionality, differences with Off-line system

  8. Challenges in Migration Process • Migration has been very rewarding • Great deal of satisfaction when you get a basin to work! • Each phone call to Peter or Matthijsduring the various “challenges” is a learning experience in itself! • Deltares support has been very good • Best results have come from combination of email/list server and one-on-one visits and phone calls • Two-day visits following the Testing workshops have been packed, very rushed – really need more than 2 days at this point