An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NEPOOL Manual 6Financial Transmission RightsTechnical Review Session - Part III June 3, 2002 Douglas James, ISO New England

  2. Technical Review Session Content • M-06 Section 8 – Incremental ARRs • Overview/Changes, Illustration: Interim IncARRs • M-06 Section 7 – Auction Revenue Settlement • Changes, Illustration: MW Awards to $ • FTR Auction • Changes to M-06 • Illustration: Bidding Node-Zone vs. Zone-Zone • Illustration: Negative Bidding • Questions/Open Discussion

  3. NEPOOL Manual 6Financial Transmission RightsTechnical Review Session - Part III Session 1 - Incremental ARRs(Section 8) June 3, 2002 Douglas James, ISO New England

  4. Section 8 - Incremental ARRs • Schedule 15 provides few specifics • In keeping with SMD, looked to PJM while respecting differences in OATTs • Design principles: • Conform to NEPOOL OATT and existing processes governing transmission upgrades • Measure incremental value of upgrade fairly using mature tools • Offer choices to customers • Provide reasonably enduring results • Correlate with related PJM practices

  5. Section 8 - Incremental ARRs • IncARRs and Eligibility for Awards • Early Estimate of IncARRs • Interim IncARR Awards • IncARR Awards • IncARR Business Rules • Actions: who does what

  6. Section 8- Incremental ARR Overview • IncARRs and Eligibility for Awards • Awarded for new transmission upgrades that make additional FTRs possible [new => after March 1, 1997] • Upgrades paid by RNS rate do not qualify • Share costs, share IncARRs proportionately • IncARRs continue with cost support/upgrade life • In MW, unidirectional, from Node/to Node • A claim on auction revenue, not an FTR • Multi-step process offering customer choice • Initially, will offer Interim IncARRs on auction by auction basis (until first annual auction)

  7. Early Estimates of IncARRs • Early Estimate of IncARRs • Optional non-binding estimate to become available as part of Facility Study • Up to 3 pairs of Node-to-Node combinations

  8. Interim IncARR Awards • Awarded following each on-peak and off-peak auction prior to first annual auction • Represent direct share of auction revenues • Process • Direct allocation specific to each upgrade • Sequential evaluation of upgrade value • Uses FTR Auction software • When cost responsibility is shared Interim IncARRs are shared

  9. Interim IncARR Award Steps • Begin with FTR Auction model, bids, prices, total revenue (Q0) and ordered list of upgrades • Remove last upgrade, re-run auction with original bids; value resulting FTRs with original prices to determine new total revenue (Q1) • Interim IncARR value of the last upgrade is Q1- Q0 • Remove next to last upgrade, re-run auction with original bids; value resulting FTRs with original prices to determine new total revenue (Q2) • Interim IncARR value of the last upgrade is Q2- Q1 • Repeat until all upgrades are exhausted

  10. Incremental ARR Awards • Awarded sequentially for fixed duration for use beginning first annual auction • Awards applied to both on and off peak auction revenue settlements • Process • Application initiates multi-round allocation specific to each upgrade • Uses FTR Auction and ARR allocation software with on-peak network model • When cost responsibility is shared, lead customer requests and accepts IncARRs

  11. Incremental ARR Award Steps • Requests • Completed application requires information to properly model the upgrade in the ISO EMS Network Model • Requests submitted point-to-point (from/to Nodes) • Evaluation/Award • ISO establishes base conditions and base performance • Upgrades added, IncARRs corresponding to request are determined and offered to customer • Customer accepts in full, in part, or rejects • Repeat request/evaluation cycle with accepted IncARRs modeled as pre-existing in subsequent rounds • Up to three rounds

  12. Incremental ARR Business Rules • ISO interacts with only one entity when accepting applications, evaluating requests and offering resulting IncARRs • IncARRs offered become binding unless ISO receives alternative request within 3 business days • IncARRs continue as long as upgrade costs are supported or for life of upgrade, if shorter • IncARR awards may be reviewed periodically • IncARRs are not subject to reduction in ARR allocation

  13. Actions - Interim Incremental ARRs Actions: who does what • ISO • Requests information necessary to make awards • Awards FTR Auction Revenues per Interim IncARR methodology • Maintains record of Interim IncARR awards ($) each auction • Upgrade Sponsor • Provides information necessary to model upgrades and determine cost responsibility

  14. Actions - Incremental ARRs • Actions: who does what (going forward): Requesting Entity ISO Submit applications Receive/respond Submit requests Evaluate requests Offer IncARR awards (MW) Accept awards (MW) Post IncARR awards (MW) Maintain record of IncARRs (MW) • For upgrades in-service/expected to be in-service prior to first annual auction, ISO will initiate process in sequential order

  15. Questions?(Interim IncARR Process Illustrationto Follow)

  16. NEPOOL Manual 6Financial Transmission RightsTechnical Review Session - Part III Session 2 – FTR Auction Revenue Settlement (Section 7) June 3, 2002 Douglas James, ISO New England

  17. Section 7 – ARR Overview Section • Revenue Allocation • by IncARRs & Load Share of Generation (4 stages) • 4-Stage Allocation Process (MW) • Generation: Seasonal Claimed Capability at Node • Tie Sources: Total Transfer Capability at External Node • Load: Distribution from network model used by FTR Auction, scaled up to meet Generation and Tie Sources

  18. Section 7 – ARR Overview Section • Value 4-Stage ARR (MW) Awards • At each destination Node (load), multiply each ARR award (in MW) by the $ value in the FTR Auction for an FTR having the same origin and destination Node as the ARR award. • Sum $ Value of ARR Awards by Load Zone • Apply Proportional Adjustment to Achieve Revenue Neutrality

  19. Section 7 – ARR Overview Section • Distribute $ Shares Within Each Load Zone • In proportion to Real-Time Adjusted Load Obligation, excluding External Transactions, within the Load Zone. • With adjustments for Excepted Transactions and NEMA Contracts. • RTALO at the time of the NEPOOL coincident peak for the month being settled. • Illustration

  20. NEPOOL Manual 6Financial Transmission RightsTechnical Review Session - Part III Session 3 – FTR Auction June 3, 2002 Douglas James, ISO New England

  21. FTR Auction • Changes • Section 1 (and 3): Non-Participant registration fee of $5000. • Section 3: Added Financial Assurance test at close of auction window and before conducting auction. • Questions • Bidding Node-Zone vs Zone-Zone • Negative Bidding