TE/EPC 2010 interventions Statistics  for the experimental Areas, injector, LHC and LHC experiments
Download
1 / 22

Injectors Experimental Areas LHC and LHC Experiments Statistics from the e-logbook - PowerPoint PPT Presentation


  • 92 Views
  • Uploaded on

TE/EPC 2010 interventions Statistics for the experimental Areas, injector, LHC and LHC experiments Christophe Mugnier, TE/EPC group Meeting, 1st December 2010. Injectors Experimental Areas LHC and LHC Experiments Statistics from the e-logbook.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' Injectors Experimental Areas LHC and LHC Experiments Statistics from the e-logbook' - ryann


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript

TE/EPC 2010 interventions Statistics for the experimental Areas, injector, LHC and LHC experiments

Christophe Mugnier, TE/EPC group Meeting, 1st December 2010

  • Injectors

  • Experimental Areas

  • LHC and LHC Experiments

  • Statistics from the e-logbook

EDMS:1107949_V1_TE-EPC 2010 interventions statistics – Group meeting presentation


Statistics: TE-EPC from the e-logbook Areas, injector, LHC and LHC experiments

Experimental Areas

East Area + FT61,

CTF3,

AD + Isolde + n-TOF,

North Area,

LHC Magnet Test Benches

LHC + LHC Exp.

LHC machine,

ALICE + CMS + LHCb + ATLAS

Ch. Mugnier, TE/EPC group Meeting, 1st December 2010

Injectors

Linac 2&3

Leir

Booster,

PS+FT16+TT2+TT10,

SPS+TT10+TI8+TT60+TI2


Injectors Areas, injector, LHC and LHC experiments

Ch. Mugnier, TE/EPC group Meeting, 1st December 2010


Injectors 2010: Interventions by Week Areas, injector, LHC and LHC experiments

Interventions by Week

LHC operation

Injector’s

setup

with Beam

Physics Start for LHC, EA’s & CNGS

  • 42: Weeks of exploitation

  • 1465: Power converters

  • 327: Interventions:

    • - 16 % (09/10 ratio)

    • 180 BH & 147 OBH

  • On constate une augmentation des interventions réalisées en dehors des heures ouvrables

Ch. Mugnier, TE/EPC group Meeting, 1st December 2010


Injectors 2010: Interventions by Machine Areas, injector, LHC and LHC experiments

Interventions by machine

325 PC

145 PC

139 PC

76 PC

230 PC

311 PC

78 PC

66 PC

38 PC

32 PC

10 PC

15 PC

  • Diminution sensible des interventions par rapport à 2009

  • Les fautes “electronic” sont prépondérantes sur l’ensemble des machines, elles représentent 50% des interventions 2010.

Ch. Mugnier, TE/EPC group Meeting, 1st December 2010


Injectors 2010: MTTR by Machine Areas, injector, LHC and LHC experiments

MTTR All = Durée totale des interventions / Nombre total des interventions

Ch. Mugnier, TE/EPC group Meeting, 1st December 2010

MTTR All Hours (mn)

50

63

145

30

35

34

50

72

47

33

31

90

45

  • 50 min: MT/Intervention:268 hours / 327 Interv.

  • CNGS, TT40 et le SPS ont les MTTR les plus élevés


Injectors 2010: MTBF by Machine Areas, injector, LHC and LHC experiments

MTBF = Nombre de jours d’exploitation / Nombre d’interventions

Ch. Mugnier, TE/EPC group Meeting, 1st December 2010

MTBF Global (J)

11.5

4.6

45

10.8

7.5

13.4

4.3

5.1

12.6

56.5

7.4

17.9

40

  • Le Booster et le PS ont les MTBF les plus faibles


Experimental Areas Areas, injector, LHC and LHC experiments

Ch. Mugnier, TE/EPC group Meeting, 1st December 2010


Experimental Areas 2010: Interventions by Week Areas, injector, LHC and LHC experiments

Interventions by Week

Physics Start for EA’s & CNGS

  • 35: Weeks of exploitation

  • 1950: Power converters

  • 330: Interventions:

    • - 11 % (09/10 ratio)

    • 190 BH & 140 OBH

  • Une augmentation des interventions réalisées en dehors des heures ouvrables est visble également à ce niveau

Ch. Mugnier, TE/EPC group Meeting, 1st December 2010


Experimental Areas 2010: Interventions by Machine Areas, injector, LHC and LHC experiments

Interventions by machine

188 PC

38 PC

500 PC

69 PC

415 PC

95 PC

402 PC

8 PC

165 PC

70 PC

Ch. Mugnier, TE/EPC group Meeting, 1st December 2010

  • Diminution sensible des interventions par rapport à 2009

  • Les fautes “electronic” sont également prépondérantes sur l’ensemble des machines,


Experimental Areas 2010: MTTR by Machine Areas, injector, LHC and LHC experiments

Ch. Mugnier, TE/EPC group Meeting, 1st December 2010

MTTR All Hours (mn)

73

62

88

61

151

70

59

48

38

77

  • 66 min: MT/Intervention:362 hours / 330 Interv.

  • Idolde et CTF3 ont les MTTR les plus élevés


Experimental Areas 2010: MTBF by Machine Areas, injector, LHC and LHC experiments

MTBF = Nombre de jours d’exploitation / Nombre d’interventions

Ch. Mugnier, TE/EPC group Meeting, 1st December 2010

21.1

2.1

12.5

4.4

7.4

13.9

25.2

2.5

9.5

22.2

MTBF Global (J)

  • AD et North Area ont les MTBF les plus faibles


Injectors & Experimental Areas 2010: summary Areas, injector, LHC and LHC experiments

  • Par rapport à 2009:

    • Baisse générale du nombre d’interventions

    • Sensible Augmentation du nombre d’interventions réalisées en dehors des heures ouvrables

  • Les problèmes liées à l’électronique des équipements représentent plus de 50% des interventions

    • Alimentations Auxiliaires, Resets, remplacement de cartes….

  • Certains composants ou équipements arrivent en fin de vie

    • North Area (chassis éléctroniques)

    • AD (Condensateurs)

    • Booster ( Dipoles)

  • L’incendie de CTF3 a généré un grand nombre d’interventions après le nettoyage et la remise en service des équipements.

Ch. Mugnier, TE/EPC group Meeting, 1st December 2010

  • Sans surprise, on s’aperçoit que North Area et AD ont des MTBF très faibles


LHC Areas, injector, LHC and LHC experiments& LHC Experiments

Ch. Mugnier, TE/EPC group Meeting, 1st December 2010


LHC & Exp. 2010: Interventions by Week Areas, injector, LHC and LHC experiments

Interventions by machine

Injector’s

setup

with Beam

LHC operation

Physics Start for LHC, EA’s & CNGS

Ch. Mugnier, TE/EPC group Meeting, 1st December 2010

  • 44: Weeks of exploitation

  • 2163: Power converters

  • 288: Interventions:

  • 80 min: MT/Intervention:

  • 382 hours / 288 Interv.

  • Les interventions OBHsont plus nombreuses que les interventions BH


LHC & Exp. 2010 Areas, injector, LHC and LHC experiments: Interventions by Week

Interventions by Week

Ch. Mugnier, TE/EPC group Meeting, 1st December 2010

  • ~ 50% des interventions sont réalisées en “remote”

  • La grande majorité des interventions locales aboutissent au remplacement d’un module


LHC & Exp. 2010 Areas, injector, LHC and LHC experiments: Interventions by Machine

Interventions by machine

2140 PC

13PC

Ch. Mugnier, TE/EPC group Meeting, 1st December 2010

  • Au niveau du LHC, les interventions pour des problèmes liés à l’électronique sont également nombreuses


LHC & Exp. 2010 Areas, injector, LHC and LHC experiments: MTTR by Machine

MTTR All = Durée totale des interventions / Nombre total des interventions

Ch. Mugnier, TE/EPC group Meeting, 1st December 2010

MTTR All Hours (mn)

130

75

  • Le MTTR global est moins élevé que prévu, grâce au grand nombre d’interventions “Remote”


LHC & Exp. 2010 Areas, injector, LHC and LHC experiments: MTBF by Machine

MTBF = Nombre de jours d’exploitation / Nombre d’interventions

Ch. Mugnier, TE/EPC group Meeting, 1st December 2010

1.7

5.9

MTBF withoutext(J)

  • MTBF global semblefaible, cependant:

  • les interventions ”Remote” ne provoquent pas l’arrêt du LHC;

  • Il fauttenircompte de la grandequantitéd’équipements


LHC & Experiments 2010 Areas, injector, LHC and LHC experiments: Summary

  • Les 6-7 premières semaines ont été une période de « Setting UP » pour le LHC, très chargée pour les équipes de piquet et les ingénieurs ON-Call.

  • Passée cette période d ’adaptation, le nombre d’appels CCC a diminué, les équipes de piquet ont gagné en expérience. L’opération a pris un rythme de croisière ,

  • le MTTR moyen, sur l’année, est moins élevé que prévu, puisqu’ une grande partie des interventions sont « remote »,

  • On a constaté des défauts de « jeunesse » récurrents sur certains équipements, les responsables d’équipements cherchent des solutions,

  • Cette première année de fonctionnement du LHC s’est remarquablement bien déroulée!

Ch. Mugnier, TE/EPC group Meeting, 1st December 2010

  • Bravo et merci aux 4 équipes de Piquets pour leur travail ainsi qu’aux responsables d’équipement pour leur disponibilité!


2010 Accelerator Schedule Areas, injector, LHC and LHC experiments

Ch. Mugnier, TE/EPC group Meeting, 1st December 2010


Statistics from the Logbook Data-Bases Areas, injector, LHC and LHC experiments

Ch. Mugnier, TE/EPC group Meeting, 1st December 2010

  • Patrice et Régis ont travaillé sur l’ extraction et la mise en forme automatique des informations du Logbook.

  • C’est une nouvelle interface ouverte à tous, qui offre de nombreuses possibilités.

  • A vous de jouer, faites vos statistiques! vos commentaires sont les biens venus