An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SITEX WP2.1 NEEDS FOR TECHNICAL GUIDANCE F. Lemy- F. Bernier - GEOSAF II TM – SITEX WP2.1 – 28/05/2014

  2. SITEX Project • Main objective: To define the conditions and means for establishing a coordinatedEuropean (and possibly international) workforceensuring a sustainablecapability to provide a technical and independent expertise in the field of radwaste management safety and radiological protection • December 2011 – December 2013 • http://sitexproject.eu/ GEOSAF II TM – SITEX WP2.1 – 28/05/2014 2

  3. SITEX WPs WP2: Needs for guidance and technical support WP4: Needs for review guidance and training WP6 Missions of the future European network of experts WP3: Needs for R&D and opportunities for joint programming WP5: Conditions for interacting with civil society GEOSAF II TM – SITEX WP2.1 – 28/05/2014

  4. WP2 Objective To set up the conditions for allowing mutual understanding between National Safety Authorities (NSAs), Technical Safety Organisations (TSOs) and Waste Management Organisations (WMOs) GEOSAF II TM – SITEX WP2.1 – 28/05/2014

  5. WP2 Tasks • WP2.1 : Needs for Technical Guidance • WP2.2 : Needs for Expertise and Technical Support GEOSAF II TM – SITEX WP2.1 – 28/05/2014

  6. WP2 Participants GEOSAF II TM – SITEX WP2.1 – 28/05/2014

  7. Regulatory expectations (WP2.1) WP2.1 Context: Responsibilities of the Regulatory Body Requirement 2 of IAEA SSR-5: The regulatory body shall a.o.: • establishregulatory requirementsfor the development of different types of disposal facility for radioactive waste • undertake international cooperation, as necessary, to fulfil its regulatory functions • provide guidanceon: • the interpretation of the national legislation and regulatory requirements as necessary • what is expected of the operator GEOSAF II TM – SITEX WP2.1 – 28/05/2014

  8. WP2.1 Objective Identification of the areas where dialogue, development and harmonization of technical guidance is needed in priority GEOSAF II TM – SITEX WP2.1 – 28/05/2014

  9. 9 Regulatory body and its supporting organizations v. 2013-04-26 Expertise function Technical dialogue Technical dialogue WP2.1 Regulatory expectations & needs Implementing function Society function Support for regulatory decision WP2.1 WP2.1 Regulatoryexpectations Regulatory function Dialogue Compliance demonstration SITEX: the expertise function and its interactions GEOSAF II TM – SITEX WP2.1 – 28/05/2014 9

  10. Interactions Between WP2.1 & Other WPs WP4.1: Needs for review guidance WP6 Missions of the future European network of experts WP2.1: Needs for guidance WP5: Conditions for interacting with civil society GEOSAF II TM – SITEX WP2.1 – 28/05/2014

  11. WP2.1 Deliverable • Title: “Overview of existing technical guides and further development” • Description: An overview of existing technical guides including an identification of: • common points and differences • the needs for further development, harmonization and dialogue • Soon available ! GEOSAF II TM – SITEX WP2.1 – 28/05/2014 11

  12. WP2.1Inputs WP2.1Steps SafetyTopic List Safety requirements (WENRA , IAEA,…) Existing regulatory guides Overview of existing regulatory guides Common points & differences A priori identification of development needs Needs for further development, harmonization and dialogue Exchanges with IGD-TP & Civil Society Identification of the areas where technical guidance and dialogue are needed in priority IGD-TP vision WP 2.1TARGET GEOSAF II TM – SITEX WP2.1 – 28/05/2014 12

  13. WP2.1 Working Hypotheses (1/2) Safety requirements on which international consensus exists are taken as reference: • EC Directive on SF & Radioactive Waste Management (2011/70/Euratom) • Draft WENRA Safety Reference Levels (SRLs) • Set of requirementsagainstwhich the situation of each country isassessed • Engagement to transpose SRLs into national regulatory frameworks of WENRA member states • IAEA Safety Fundamentals and Requirements • ICRP recommendations GEOSAF II TM – SITEX WP2.1 – 28/05/2014 13

  14. WP2.1 Working Hypotheses (2/2) Technical guidance: • associated with one or several safety requirements • may serve different purposes: • Interpretation of requirements • Explanation of how requirements can be met in practice and/or how compliance should be substantiated • Facilitate dialogue and interactions with the public or with other stakeholders • possible audiences: implementers, experts fulfilling an expertise or a regulatory function, public or other stakeholders GEOSAF II TM – SITEX WP2.1 – 28/05/2014 14

  15. Safety Topics (1/4) Safety topics identified based on existing “high-level” safety requirements: • Governing principles: • Radiation protection principles • Protection of present and future generations • Defence in Depth & Robustness • Demonstrability & Feasibility • … • Safety policy & strategy: • Safety strategy: “High-level approach for achieving safe disposal” • addresses the implementation of the “governing principles” GEOSAF II TM – SITEX WP2.1 – 28/05/2014 15

  16. Safety Topics (2/4) • Management system: • Organisational structure • Resources • Process implementation (including QA) • … GEOSAF II TM – SITEX WP2.1 – 28/05/2014 16

  17. Safety Topics (3/4) • Site selection • Design • Construction • Operation • Closure & Decommissioning • Period after closure and institutional controls • Waste acceptance • Monitoring Requirementsassociatedwithspecific phase(s) of repositorydevelopment GEOSAF II TM – SITEX WP2.1 – 28/05/2014 17

  18. Safety Topics (4/4) • Safety case and assessment: • Objectives and scope, Graded approach, SC/SA content vs. regulatory decision steps • Characterisation, knowledge and system understanding • SA methodologies, approaches & tools: • Timescales and timeframes, uncertainties, deterministic vs. probabilistic approaches, scenario development, models,… • Indicators & criteria • Operational safety assessment • Long-term safety assessment • Periodic safety review • Independent verification GEOSAF II TM – SITEX WP2.1 – 28/05/2014 18

  19. Operation: Sub-topics • Investigations and feedback of information on operating experience • Operational limits and conditions • Modifications • Emergency preparedness and response • Maintenance, periodic testing and inspection • Occupational exposure • Public exposure • Receiving, handling and emplacement of waste GEOSAF II TM – SITEX WP2.1 – 28/05/2014

  20. Safety Topics vs. Requirements Example: Requirementsassociatedwith the safety topic “Construction” GEOSAF II TM – SITEX WP2.1 – 28/05/2014 20

  21. Identification of the Needs of NSAs & TSOs Needs of NSAs/TSOs for guidance development and/or dialogue have been identifiedbased on: • Questionnaire on existing, used and neededguidance • Comparisonof existingtechnicalguides Theseneeds have been prioritizedconsidering the level of « urgency », importance for safety, the level of interest,… GEOSAF II TM – SITEX WP2.1 – 28/05/2014 21

  22. Prioritization the NSAs & TSOs Needs • ~100 needswereidentified !!! • 35 needsidentified as having a high level of interest and urgency, e.g.: • Development of the “design basis”, including the consideration of : • normal and anticipated operational conditions & possible accidents • disturbing FEPs during operation whose consequences may affect post-closure safety • Hazards associated with concurrent activities GEOSAF II TM – SITEX WP2.1 – 28/05/2014 22

  23. Identified Needs: Construction GEOSAF II TM – SITEX WP2.1 – 28/05/2014

  24. Identified Needs: Operation (1/2) GEOSAF II TM – SITEX WP2.1 – 28/05/2014

  25. Identified Needs: Operation (2/2) GEOSAF II TM – SITEX WP2.1 – 28/05/2014

  26. Conclusions • WP2.1 was mainly aimed at: • fostering mutual understanding and dialogue between NSAs, TSOs and WMOs • identifying and anticipating the needs for technical guidance • Safety requirements, technical guides and needs associated with the construction, operation & closure of a GDF have been identified • Deliverable soon available GEOSAF II TM – SITEX WP2.1 – 28/05/2014 26

  27. Thank you for your attention ! GEOSAF II TM – SITEX WP2.1 – 28/05/2014