An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Front End Electronics Status DES Meeting, March 1, 2007 T. Shaw

  2. FEE Status • HTR control system has been delivered to SiDET • 12 Channel Board • Initial tests allowed us to readout CCD • Juan shows that the noise is too high ~30e- • We are investigating this; we are in the process of re-assembling a working 12-Channel board teststand on WH14 with 2nd board set • AlN Boards • Contracts entered in system for two types of AlN Boards • Nanonics w/JFET • FFC w/JFET • Cabling issues • We are trying to solve cabling issues inside dewar • We are handling the dewar wiring a lot more with the pedestal packages • Have seen a variety of problem • Open connectors • Open contacts • improperly seated cables • Have identified better FFC connector vendor, will swap out some connectors • Need to slightly build up thickness of the flat flex cable DES Meeting, March 1, 2007 T. Shaw

  3. Status • Multi CCD Dewar • getting ready to cool down MCD; two CCD readout • Software, hardware look OK • need a few days to do noise studies with external cabling • From Madrid • The Clock Board is under test • Monsoon system (MCB and CBB) is up and running • From Barcelona • See Laia’s slides DES Meeting, March 1, 2007 T. Shaw

  4. Other News • We need to start thinking about the next FE Electronics collaboration meeting • Target date is mid-July • At that time we should be able to review the status of • power supply design • crate design • 12-channel board performance • Clock Board performance • S-link and the MCB • Crate Synchronization plans • ……. DES Meeting, March 1, 2007 T. Shaw