Status of Torino-Dubna Production. Aluminum Plates production: Torino: steady production ongoing, 2715 plates cut, 194 chambers= 48 MB1 + 54 MB2+ 50 MB3+ 41 MB4).

Download Presentation

Status of Torino-Dubna Production

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Status of torino dubna production

Status of Torino-Dubna Production

  • Aluminum Plates production:

  • Torino: steady production ongoing, 2715 plates cut, 194 chambers=48MB1 +54MB2+50MB3+41MB4).

  • Dubna: steady production ongoing. Plates for 34 MB1, 40 MB2, 39 MB3, 3 MB4 produced insofar (116 total). Time estimated to complete full production + spares march 2005 (as specified in the contract).

[email protected]


Status of torino dubna production1

Status of Torino-Dubna Production

Position Quality of strip production:

stable since change of strip deposition head in august 2002.

Plate MB1 n. 300220

1 pixel = 0.106mm

[email protected]


Status of torino dubna production2

Status of Torino-Dubna Production

HV test performance of strip production:

Plates which pass 1st HV test

84%

Last plate of the day left under HV test during the night, 10 hours. No extra bad plates found so far.

[email protected]


Status of mb4 production preparation

Status of MB4 Production Preparation

  • Production of FE and HV SL frames ongoing in Torino. 20 MB4 HV side + 9 FE side frames produced.

[email protected]


Status of mb4 production preparation1

Status of MB4 Production Preparation

Plotter Y axis supports 99% ready for table installation.

Completion expected by delivery of last part (rails protective tape fixations).

[email protected]


Status of mb4 production preparation2

Status of MB4 Production Preparation

I beam tool drawings

(P.Mereu)

Inflatable tube (2.5m,f=7.5mm)

Elastic rubber

OPEN

12.7 mm ALCOA support

Commercial profile

CLOSED

[email protected]


Status of mb4 production preparation3

Status of MB4 Production Preparation

Final prototype executive drawings ready

Movable locating block

Rails

Torsion springs

[email protected]


Status of mb4 production preparation4

Status of MB4 Production Preparation

Main Structure:

Rohacell

Sandwich

Thickness 500mm

Load 5000N