“Proposal for KM3NeTCost Model Implementation”

WP7: Risk Assessment and Quality Assurance. “Proposal for KM3NeTCost Model Implementation”. R. Garaguso, G. Pilone, C.Sollima INFN- Pisa. WP7: Contents. KM3Net Cost Model Preliminary KM3Net Cost Model KM3NeT cost model proposal Conclusion. WP7: KM3NeT Cost Model.

robb
Download Presentation

“Proposal for KM3NeTCost Model Implementation”

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WP7: Risk Assessment and Quality Assurance “Proposal for KM3NeTCost Model Implementation” R. Garaguso, G. Pilone, C.Sollima INFN- Pisa C. Sollima, INFN-Pisa Paris, 23-24-2009

  2. WP7: Contents • KM3Net Cost Model • Preliminary KM3Net Cost Model • KM3NeT cost model proposal • Conclusion C. Sollima, INFN-Pisa Paris, 23-24-2009

  3. WP7: KM3NeT Cost Model • Provide a preliminary evaluation of the KM3NeT cost • Provide the up date cost evaluation C. Sollima, INFN-Pisa Paris, 23-24-2009

  4. WP7: Preliminary KM3NeT Cost Model • Supply • Manufacture • Sea operation • Operation C. Sollima, INFN-Pisa Paris, 23-24-2009

  5. WP7: Preliminary KM3NeT Cost Model C. Sollima, INFN-Pisa Paris, 23-24-2009

  6. WP7: Preliminary KM3NeT Cost Model C. Sollima, INFN-Pisa Paris, 23-24-2009

  7. WP7: Preliminary KM3NeT Cost Model • Comments • Production infrastructure • Test qualification process (Qualification + Acceptance + Conformity test) • Test infrastructure • Logistic (handling, storage, packaging, transportation) • Sea operation • Operation • REQUIRE A SPECIFIC DEFINITION, PLAN and REVIEW BY TECHNICAL EXPERTS COMMON TO ALL THE DESIGNS C. Sollima, INFN-Pisa Paris, 23-24-2009

  8. WP7: Preliminary KM3NeT Cost Model • The preliminary model is implemented in an excel matrix • using the PBS definition in the first column • and the cost model in the first row (Supply, Manufacture, Sea operation, Operation), i.e.: C. Sollima, INFN-Pisa Paris, 23-24-2009

  9. WP7: Preliminary KM3NeT Cost Model • It allows to have sub total • Per components /systems, • Cost model items • For the all detector • In other words it allows to perform a cost analysis of the project. C. Sollima, INFN-Pisa Paris, 23-24-2009

  10. WP7: KM3NeT logical model developed • Chinese box model in which boxes are also connected each other C. Sollima, INFN-Pisa Paris, 23-24-2009

  11. Storey 1 Detection Unit 1 SJB 1 Storey n Storey 1 Detection Unit n Storey n SJB n WP7: KM3NeT logical model developed Each boxes constitute a layer in which components are connected in tree logic C. Sollima, INFN-Pisa Paris, 23-24-2009

  12. WP7: KM3NeT Cost Model Proposal, 1/2 • Storage • Boards (e.g. FCM-01….) • Cables • Glass sphere • Pressure vessels • Etc.. • Production • JBs • Detection unit number • Storey number • OM number • Etc.. • .. • It is needed to know where the components is located and the related actual cost of the production Production Line 10 5 20 .. n Storage 1 2 3 .. n C. Sollima, INFN-Pisa Paris, 23-24-2009

  13. WP7: KM3NeT Cost Model Proposal, 2/2 • Status of the Data base software • To define the PBS • To upload documents • Document management by project or institution • Contribution by WPs • Definition of the state of art of the technologies • Report on the up to date status of develpment on the R&D • Definition of the Detector layout • Definition of the Technical specification • Definition of the test qualification and infrastructure for components / systems for KM3NeT production • Definition of the integration process and infrastrure • Contribution from the PCC • Approval of the work planned by WP7 • To require the collaboration between WPs and WP7 C. Sollima, INFN-Pisa Paris, 23-24-2009

  14. WP7: Conclusions • The cost model is going to be implemented  May 2009 • In the mean time a format for getting needed information will be available  < 3 weeks • It is suggested to look at the production of the KM3NeT • Storage • Integration and qualification procedures • In the TDR it is recommended to use qualified solutions • More collaboration is required from the other WPs and by the designers C. Sollima, INFN-Pisa Paris, 23-24-2009

  15. WP7: Risk Assessment and Quality Assurance “Proposal for KM3NeT Cost Model Implementation” THANK VERY MUCH FOR YOUR KIND ATTENTION "Design Study for a Deep Sea Facility in the Mediterranean for Neutrino Astronomy and Associated Sciences” C. Sollima, INFN-Pisa Paris, 23-24-2009