An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. P8 cryogenic PLC problems on 25.05.2011 LHC operation daily meeting 27.05.2011 Krzysztof Brodzinski, Serge Claudet_TE-CRG-OA

  2. History P8: 25.05.2011 11:00 - PLC problem of Cold Compressor Station (1.8 K unit) - diagnostic + PLC replacement 13:00 - Restart of Cold Compressors and cryo recovery 15:30 - Cryo operation problem (lost of ~ 1 hour) 16:30 - Restart of Cold Compressors and cryo recovery 18:00 - PLC problem on Main Warm Compressor Station (ref. 4.5 K) - diagnostic +PLC replacement 19:00 – Complete restart and cryo recovery For information: Estimated recovery time after stop of Cold Compressor  10 hours +/- 10% Estimated recovery time after stop of Warm Compressor Station  24 hours +/- 10% (Both estimations are applicable in case of one cryo plant supplying two sectors, applicable if immediate restart applied) TE-CRG-OA_K.Brodzinski_27.05.2011

  3. Localization QSCB PLC problem on 13.05.2011 – not replaced Radiation problem NOT possible QSCB PLC problem on 25.05.2011 – replaced Radiation problem NOT possible QURCB PLC problem on 19.04.2011 – replaced Radiation problem possible QURCB PLC problem on 25.05.2011 – replaced Radiation problem possible Equipment not in operation – one cryo plant supplies two LHC sectors Detailed explanation of the problems origin should be given by EN/ICE experts TE-CRG-OA_K.Brodzinski_27.05.2011

  4. Localization (C. Theis & co-workers, EDMS 735075) US85 QURCB PLC localization TE-CRG-OA_K.Brodzinski_27.05.2011

  5. Recovery curves TS May Stop 25.05.2011 Stop 13.05.2011 TE-CRG-OA_K.Brodzinski_27.05.2011