An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. resilient procedure use Halden Reactor Project, Norway

  2. obey the principleswithout being bound by them bruce lee

  3. resilience is about… • the ability of a system to adapt to unforeseen, challenging situations (incl. but not limited to Fukushima-scale events) • the ability to mobilize additional resourceswhen a system approaches its margin of maneuver • enabling smooth transfer of control

  4. motivation • Balancing pre-planned responses and the ability to adapt to novel situations is not easy. These demands can be competing or contradictory. • Focusing solely on procedural adherence may undermine the crew’s ability to make autonomous assessments, to think ahead, and to keep a high-level overview of the situation(over-reliance on procedures). • Emergency response in complex scenarios requires reliability andresilience

  5. motivation To respond to unanticipated situations that are not entirely covered by procedure, crews need • Cognitive capacity, expertise, questioning attitude • Understand procedure backgrounds and applicability • Monitor for anomalies, predict plant evolution • Avoid over-reliance on procedures Can we improve the ability to handle unexpected scenarios through staffing and support systems? • Shift technical advisor • Procedure overview tool • New large screen display with safety focus

  6. resilient procedure use requiresbalancing of heads-downoperation heads-upoperation and How to support this? - Crew roles - Procedure support tools - Overview tools (e.g. LSD) - External support - Others?

  7. experimental design • 5 Swedish and 5 US crews • (note: in Sweden there is no STA position) • 4 EOP scenarios with complications • For optimal recovery, crew may have to make knowledge based decisions. • 2 experimental factors (4 conditions) • STA available / not available (4/3 person crew) • Tools available / not available (Tools = procedure flowchart & large-screen display)

  8. experimental design Experimental design First study to compare LSD with a no-LSD control group counterbalancedto avoid order effects counterbalancedto avoid order effects mostsupport leastsupport

  9. scenarios • Multiple SG tube break • Interfacing system LOCA • LOCA outside containment (RHR system) • Loss of feedwater • Fire in cable compartment • With high-head SI pump breakdown • H.B. Robinson fire event Scenario has been coded into SACADA

  10. week plan

  11. measures • HRA-type performance measures • HFE success / failure, HFE performance time • PSFs, crew errors, aggregated crew stories • New measure of SA for ISV • New measure of teamwork competence and emergency competence • Eye tracking • Questionnaires

  12. tools for improving situation overview:new large-screen display and STA flowchart

  13. new large screen display

  14. new large screen display: primary status ofimportantsafetysystems status of automatic systems, and other important alarms (e.g. RMS) PRZpressure/leveltrends;alarmlevels;trip points massbalance increasing/ decreasing SG pressure / level trends sub-cooling

  15. procedure flowchart E-0 E-1 E-2 E-3 ECA-1.1 ECA-1.2 ECA-1.3 ES-1.2 FR-H.1 FR-P.1

  16. Link to high-level summary > < Grouping of procedure steps Critical action steps > < Procedure /step transfers Key decision point > Link to background material > < Procedure transfers (clickable) Step number > < Short description of step links to full text

  17. CSF status, link to decision tree > Foldout page, link to appendix >

  18. Some flowcharts contain diagrams with live data > *

  19. Halden Reactor Project, Norway

  20. contact Michael.Hildebrandt@hrp.no