1 / 27

ILWS Science in the Solar System

ILWS Science in the Solar System. Hermann J. Opgenoorth Solar System Missions Division Research and Science Support Department ESA - ESTEC. Ulysses Milestones. Launch: 6 Oct 1990 by space shuttle Discovery Polar Passes: 1994 (south) / 1995 (north) 2000 (south) / 2001 (north)

radley
Download Presentation

ILWS Science in the Solar System

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ILWS Science in the Solar System Hermann J. Opgenoorth Solar System Missions Division Research and Science Support Department ESA - ESTEC

  2. Ulysses Milestones • Launch: 6 Oct 1990 by space shuttle Discovery • Polar Passes: • 1994 (south) / 1995 (north) • 2000 (south) / 2001 (north) • 2006/7 (south) / 2007/8 (north) • End of Prime Mission: 30 Sep 1995 • ESA Extensions of Scientific Operations: • Jun 1993 SPC: 1 Oct 1995 – 31 Dec 2001 (6.2 yrs) • Jun 2000 SPC: 1 Jan 2002 – 30 Sep 2004 (2.75 yrs) • Feb 2004 SPC: 1 Oct 2004 – 31 Mar 2008 (3.5 yrs)

  3. Ulysses 3rd round over the sun’s poles

  4. SOHO - our eye on the Sun

  5. 10 Years of SOHO • > 2500 refereed papers by • > 2300 scientists • > 140 Ph.D. theses • > 1000 comets • > 2,000,000 command blocks sent to the spacecraft • > 100,000,000 exposures MDI • > 16 TB in SOHO archive • > 85 TB of data served • > 275,000,000 web page requests served

  6. Current mission extension until 12/2009 Joint programs with HINODE and STEREO 08/2008: Launch of “next-generation SOHO”: SDO 2009: cross-calibration of MDI/EIT with SDO > 2010: reduced automated mission (Bonus/Bogart mission) (coronagraphs, TSI,…) SOHO’s Future

  7. Scientific regions visited by Cluster: dayside February magnetosheath bow shock magnetopause cusp lobe plasma sheet solar wind

  8. Scientific regions visited by Cluster: nightside September magnetosheath bow shock magnetopause cusp lobe plasma sheet solar wind

  9. Cluster milestones • Cluster I launched by Ariane 5 (failure): 4 June 1996 • Cluster II first Launch: 16 July 2000 by Soyuz Fregat (first ESA spacecraft from Baikonour) • Second launch: 10 August 2000 by Soyuz Fregat • End of Prime Mission: 1 February 2003 • First extension: 1 Feb. 2003 - 31 Dec. 2005 + full orbit coverage • Cluster active archive startup: Feb 2003 • 2nd extension: 1 Jan. 2006 - 31 Dec. 2009 (mid-term review end 2007) 2001 2008-2009

  10. C1,C2,C3 C3,C4 C3 C1 C4 C2 Separation distances changed every 6 months d “Multiscale” cusp tail 50km!

  11. ESA Support to Hinode • ESA, in sub-contractual collaboration with the Norwegian Space Centre, provides • one additional downlink contact to Solar-B for each of the 15 orbits per day • This support considerably improves the overall scientific data return and the cadence of • observations from the Solar-B mission • The European scientific community is • catered with processed data through • a dedicated Solar B data centre • at the University of Oslo • MoU with JAXA • two European members on the Hinode • SWT were appointed this spring.

  12. Svalbard Ground Station for Hinode • Reasons: • Possibility to track all 15 orbits per day • Antenna redundancy, and also strong • Norwegian interest • in the mission.

  13. Aurora at Earth Jupiter Saturn

  14. Mars plasma environment Solar wind Planetary wind • ASPERA • Characterisation of the planetary wind composition (atomic & molecular O+ ) away from the solar wind. • Solar wind scavenging of the atmosphere down to 270 km altitude, representing a major mechanism in neutral atmospheric degassing and past climate change. • Planetary heavy ions accelerated up to very high energies. • For the first time, ”radiation” of fast atoms is observed at Mars. • Current escape rate of Martian atmosphere (solar minimum). ≈100 ton/day Planetary wind (O+)

  15. VENUS - Express :Plasma environment seen by ASPERA and MAG IP IP BS BS Induced Magnetosphere Magnetosheath e- SW SW B i+

  16. Bepi Colombo Two satellites to Mercury’s magnetosphere

  17. European ILWS Strategy in an Overview

  18. European ILWS Strategy in an Overview

  19. ILWSFuture Missions - SWARM • ESA - EOP Living Planet 3-satellite mission to study core dynamics and geodynamo processes, crustal magnetisation, and ocean circulation from low Earth orbit. • Ionosphere-magnetosphere current systems and magnetic forcing of the upper atmosphere need to be derived and taken care of - “one man’s noise is another man’s data” • Selected by Earth Obs. Program Board for Launch in 2009 (now 2010) • Electric Field Instrument (Ion Drift Meter) provided by CSA in collaboration with ESA Science Programme • For optimisation of GEOSPACE science capabilities an additional electron instrument “Conducto-meter” was discussed - but not achieved • Science operation and data products will be organised and shared between D/EOP and D/SCI (Definition process soon to be initiated)

  20. PROBA - 2 ESA Technology Demonstrator Project for On-Board Autonomy within ESA D/TEC Successor of PROBA1 (launched in 2001, dedicated to Earth observation) ESA mission with Belgium as lead funder (through GSTP) Prime contractor: Verhaert Design & Devl. (Belgium) Schedule: development 2003-2006 and launch 2008 into an LEO 06-18 Sun-synchronous orbit Following a proposal to the ESA NLM programme the Proba-2 science operation has been «adopted«  for a 2 year mission duration by the May 2006 SPC meeting - at a cost of 2.8 Meuro for ESA.

  21. Solar Orbiter Next major Solar and Heliospheric mission ESA ILWS flagship 2015 - 2025 Now with the Inner Heliospheric Sentinels

  22. SENTINELS Report of the Science andTechnology Definition Team available at http://sentinels.gsfc.nasa.gov

  23. ESA’s Cosmic Vision, 2015-2025 Themes: • What are the conditions for life and planetary formation? • How does the Solar System work? • From the Sun to the edge of the Solar System (including the “hierarchy of scales” in plasma-physical processes) • Gaseous Giants and their Moons • The Building Blocks of the Solar System: Asteroids and Small Bodies • What are the fundamental laws of the Universe? • How did the Universe originate and what is it made of?

  24. ESA’s Cosmic Vision, 2015-2025 Call issued in March 2007, Input due June 28 2007 Outlook from received Letters of Intent: In total 9 proposals in realm of ILWS expected (all M Class) 5 Solar missions already listed in Solar TG report 2 Magnetospheric 1 “IT” mission in margin of IT TG interest 1 Heliospheric missions (with long time frame) Downselection into 6 out of 64 expected proposals in 2007 Downselection into 2 flight opportunities - 1 M & 1 L Class after 2 years of competitive study in 2009/2010 Followed be AO for new slice of CV 2015-2025 “programme”. (formally there will be no programmatic approach…)

  25. Other ESA News Science Programme Review Team (SPRT) Ongoing Plans to create Opportunities for Collaborations Reorganisation of RSSD & New Science Operation Scheme Bilateral Meetings in 2007 NASA, JAXA still to come: China, Russia

More Related